| NPRR1264 Creation of a New Energy Attribute Certificate Program |
Texas Energy Buyers... |
Approved |
Dec 19 '24 |
Jul 9 '26 |
| NPRR1306 Removal of Digital Certificate References for Market Participants with ERCOT MIS Access |
ERCOT |
Approved |
Oct 28 '25 |
Jul 9 '26 |
| NPRR1307 Revised Definition of Mitigation Plan |
ERCOT |
Approved |
Nov 13 '25 |
Jul 9 '26 |
| NPRR1308 ! Board Priority - Related to NOGRR282, Large Computational Load Ride-Through Requirements |
ERCOT |
Approved |
Nov 14 '25 |
Jul 9 '26 |
| NPRR1309 ! Board Priority - Dispatchable Reliability Reserve Service Ancillary Service |
ERCOT |
Approved |
Nov 20 '25 |
Jul 9 '26 |
| NPRR1315 ! Changes to Process of Evaluating the Potential Needs for Additional Capacity and Mitigated Offer Cap |
ERCOT |
Approved |
Dec 19 '25 |
Jul 9 '26 |
| NPRR1316 Implement an Annual ERCOT RFI Process to Gather Information Related to Retirement and Mothballing Plans of Select Resources |
ERCOT |
Approved |
Dec 19 '25 |
Jul 9 '26 |
| NPRR1318 Specific Exclusion of the Incentive Factor to ERCOT Approved Outside Attorney Fees and Approved Emissions Costs |
ERCOT |
Approved |
Dec 23 '25 |
Jul 9 '26 |
| NPRR1322 60-Day Disclosure of the Day-Ahead Market (DAM) Ancillary Service Only Offer Awards |
ERCOT |
Approved |
Feb 20 '26 |
Jul 9 '26 |
| NPRR1327 As-Built for NPRR1281, Improvements to Alternate FFSS Resource Designation |
ERCOT |
Approved |
Mar 31 '26 |
Jul 9 '26 |
| NPRR1330 ! Mitigated Offer Caps for RMR Units |
ERCOT |
Approved |
Apr 21 '26 |
Jul 9 '26 |
| NPRR1325 ! Related to PGRR145, Batch Zero Process for Large Load Interconnections |
ERCOT |
Approved |
Mar 4 '26 |
Jun 18 '26 |
| NPRR1275 Expansion of Qualifying Pipeline Definition for Firm Fuel Supply Service in Phase 3 |
ERCOT |
Approved |
Feb 25 '25 |
May 29 '26 |
| NPRR1313 Adjustment to the Calculation of the Initial Standby Cost for RMR Resources |
ERCOT |
Approved |
Dec 16 '25 |
May 29 '26 |
| NPRR1314 Planning Guide Glossary Transition |
ERCOT |
Approved |
Dec 16 '25 |
May 29 '26 |
| NPRR1323 ! Correction to Inadvertent Removal of Real-Time MCPC Capping for NPRR1290 Phase 2 |
ERCOT |
Approved |
Feb 24 '26 |
May 29 '26 |
| NPRR1304 Move OBD to Section 22 – Procedure for Identifying Resource Nodes |
ERCOT |
Approved |
Oct 28 '25 |
Mar 26 '26 |
| NPRR1305 Move OBD to Section 23 – Counter-Party Credit Application Form |
ERCOT |
Approved |
Oct 28 '25 |
Mar 26 '26 |
| NPRR1311 ! Correction to Real-Time Reliability Deployment Price Adders for Ancillary Services under Load Shed for RTC+B |
ERCOT |
Approved |
Nov 25 '25 |
Mar 26 '26 |
| NPRR1263 Clarify Testing Requirements for CCVTs |
WETT |
Approved |
Dec 12 '24 |
Jan 15 '26 |
| NPRR1274 RPG Estimated Capital Cost Thresholds of Proposed Transmission Projects |
ERCOT |
Approved |
Feb 25 '25 |
Jan 15 '26 |
| NPRR1280 Establish Process for Permanent Bypass of Series Capacitor |
ERCOT |
Approved |
Apr 16 '25 |
Jan 15 '26 |
| NPRR1285 Improve Self-Commitment within RUC Opt Out Window |
TCPA |
Approved |
May 14 '25 |
Jan 15 '26 |
| NPRR1287 Revisions to Outage Coordination |
ERCOT |
Approved |
May 27 '25 |
Jan 15 '26 |
| NPRR1293 Clarifications to the Modeling Timelines |
ERCOT |
Approved |
Jul 29 '25 |
Jan 15 '26 |
| NPRR1294 Move OBD to Section 22 – Demand Response Data Definitions and Technical Specifications |
ERCOT |
Approved |
Aug 4 '25 |
Jan 15 '26 |
| NPRR1298 Timing Requirements for Comments to Subcommittee Reports |
Vistra |
Approved |
Aug 27 '25 |
Jan 15 '26 |
| NPRR1299 Clarifications to Emergency Response Service (ERS) |
ERCOT |
Approved |
Sep 2 '25 |
Jan 15 '26 |
| NPRR1300 Protected Information and ECEII to OPUC |
ERCOT |
Approved |
Sep 11 '25 |
Jan 15 '26 |
| NPRR1303 Modernize Submission of Declarations of Natural Gas Pipeline Coordination |
ERCOT |
Approved |
Sep 23 '25 |
Jan 15 '26 |
| NPRR1265 Unregistered Distributed Generator |
ERCOT |
Approved |
Dec 26 '24 |
Nov 6 '25 |
| NPRR1266 Opt-Out Status Held by a Transmission-Voltage Customer Cannot be Transferred |
ERCOT |
Approved |
Dec 31 '24 |
Nov 6 '25 |
| NPRR1277 Revisions to EAL Formula |
ERCOT |
Approved |
Mar 18 '25 |
Nov 6 '25 |
| NPRR1279 Reinstate Enhancements to the Exceptional Fuel Cost Process |
Constellation |
Approved |
Apr 2 '25 |
Nov 6 '25 |
| NPRR1281 Improvements to Alternate FFSS Resource Designation |
LCRA |
Approved |
Apr 16 '25 |
Nov 6 '25 |
| NPRR1283 Modification of SSR Mitigation Timeline |
ERCOT |
Approved |
Apr 29 '25 |
Nov 6 '25 |
| NPRR1288 Remove Multiple Month Transactions in CRR Auctions |
ERCOT |
Approved |
May 27 '25 |
Nov 6 '25 |
| NPRR1289 Option Price Report and Establish 1 MW Bid Minimum |
ERCOT |
Approved |
May 27 '25 |
Nov 6 '25 |
| NPRR1290 Gap Resolutions and Clarifications for the Implementation of RTC+B |
ERCOT |
Approved |
May 28 '25 |
Nov 6 '25 |
| NPRR1291 Modify Annual Demand Response Report Posting Date and Include Language to Address PUCT SUBST. R. 25.186 |
ERCOT |
Approved |
Jun 2 '25 |
Nov 6 '25 |
| NPRR1226 Estimated Demand Response Data |
ERCOT Steel Mills |
Approved |
Apr 23 '24 |
Jul 31 '25 |
| NPRR1229 Real-Time Constraint Management Plan Cost Recovery Payment |
STEC |
Approved |
May 6 '24 |
Jul 31 '25 |
| NPRR1238 Voluntary Registration of Loads with Curtailable Load Capabilities |
Golden Spread... |
Approved |
Jun 26 '24 |
Jul 31 '25 |
| NPRR1267 Large Load Interconnection Status Report |
Joint Sponsors |
Approved |
Jan 8 '25 |
Jul 31 '25 |
| NPRR1271 Revision to User Security Administrator and Digital Certificates Opt-out Eligibility |
ERCOT |
Approved |
Jan 28 '25 |
Jul 31 '25 |
| NPRR1276 Move OBD to Section 22 – Emergency Response Service Procurement Methodology |
ERCOT |
Approved |
Mar 10 '25 |
Jul 31 '25 |
| NPRR1282 ! Ancillary Service Duration under Real-Time Co-Optimization |
ERCOT |
Approved |
Apr 29 '25 |
Jul 31 '25 |
| NPRR1190 High Dispatch Limit Override Provision for Increased Load Serving Entity Costs |
Joint Sponsors |
Approved |
Jul 26 '23 |
May 15 '25 |
| NPRR1234 Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater |
ERCOT |
Approved |
May 28 '24 |
May 15 '25 |
| NPRR1241 Firm Fuel Supply Service (FFSS) Availability and Hourly Standby Fee |
Luminant |
Approved |
Jul 19 '24 |
May 15 '25 |
| NPRR1256 Settlement of MRA of ESRs |
ERCOT |
Approved |
Oct 14 '24 |
May 15 '25 |
| NPRR1268 ! RTC – Modification of Ancillary Service Demand Curves |
IMM |
Approved |
Jan 28 '25 |
May 15 '25 |
| NPRR1269 ! RTC+B Three Parameters Policy Issues |
ERCOT |
Approved |
Jan 28 '25 |
May 15 '25 |
| NPRR1270 ! Additional Revisions Required for Implementation of RTC |
ERCOT |
Approved |
Jan 28 '25 |
May 15 '25 |
| NPRR1273 ! Appropriate Accounting for ESRs in PRC Calculation |
ERCOT |
Approved |
Feb 12 '25 |
May 15 '25 |
| NPRR1243 Revision to Requirements for Notice and Release of Protected Information or ECEII to Certain Governmental Authorities |
ERCOT and TRE |
Approved |
Jul 24 '24 |
Mar 13 '25 |
| NPRR1246 Energy Storage Resource Terminology Alignment for the Single-Model Era |
ERCOT |
Approved |
Jul 31 '24 |
Mar 13 '25 |
| NPRR1250 RPS Mandatory Program Termination |
ERCOT |
Approved |
Aug 27 '24 |
Mar 13 '25 |
| NPRR1251 Updated FFSS Fuel Replacement Costs Recovery Process |
ERCOT |
Approved |
Aug 28 '24 |
Mar 13 '25 |
| NPRR1252 Pre-notice for Sharing of Some Information, Addition of Research and Innovation Partner, Clarifying Notice Requirements |
ERCOT |
Approved |
Aug 28 '24 |
Mar 13 '25 |
| NPRR1253 Incorporate ESR Charging Load Information into ICCP |
Ammper Power |
Approved |
Oct 1 '24 |
Mar 13 '25 |
| NPRR1257 Limit on Amount of RRS a Resource can Provide Using Primary Frequency Response |
ERCOT |
Approved |
Oct 21 '24 |
Mar 13 '25 |
| NPRR1258 TSP Performance Monitoring Update |
ERCOT |
Approved |
Oct 29 '24 |
Mar 13 '25 |
| NPRR1259 Update Section 15 Level Response Language |
ERCOT |
Approved |
Oct 30 '24 |
Mar 13 '25 |
| NPRR1260 Corrections for CLR Requirements Inadvertently Removed |
ERCOT |
Approved |
Nov 6 '24 |
Mar 13 '25 |
| NPRR1261 Operational Flexibility for CRR Auction Transaction Limits |
ERCOT |
Approved |
Nov 13 '24 |
Mar 13 '25 |
| NPRR1180 Inclusion of Forecasted Load in Planning Analyses |
Oncor |
Approved |
May 11 '23 |
Jan 16 '25 |
| NPRR1239 Access to Market Information |
ERCOT |
Approved |
Jul 2 '24 |
Jan 16 '25 |
| NPRR1240 Access to Transmission Planning Information |
ERCOT |
Approved |
Jul 2 '24 |
Jan 16 '25 |
| NPRR1245 Additional Clarifying Revisions to Real-Time Co-Optimization |
ERCOT |
Approved |
Jul 30 '24 |
Jan 16 '25 |
| NPRR1247 ! Incorporation of Congestion Cost Savings Test in Economic Evaluation of Transmission Projects |
ERCOT |
Approved |
Aug 9 '24 |
Jan 16 '25 |
| NPRR1248 Correction to NPRR1197, Optional Exclusion of Load from Netting at EPS Metering Facilities which Include Resources |
ERCOT |
Approved |
Aug 16 '24 |
Jan 16 '25 |
| NPRR1249 Publication of Shift Factors for All Active Transmission Constraints in the RTM |
CIM View Consulting |
Approved |
Aug 21 '24 |
Jan 16 '25 |
| NPRR1254 Modeling Deadline for Initial Submission of Resource Registration Data |
ERCOT |
Approved |
Oct 2 '24 |
Jan 16 '25 |
| NPRR1188 Implement Nodal Dispatch and Energy Settlement for Controllable Load Resources |
ERCOT |
Approved |
Jun 27 '23 |
Nov 21 '24 |
| NPRR1215 Clarifications to the Day-Ahead Market (DAM) Energy-Only Offer Calculation |
ERCOT |
Approved |
Jan 23 '24 |
Nov 21 '24 |
| NPRR1221 Related to NOGRR262, Provisions for Operator Controlled Manual Load Shed |
ERCOT |
Approved |
Mar 20 '24 |
Nov 21 '24 |
| NPRR1227 Related to RMGRR181, Alignment of Defined Term Usage and Resolution of Inconsistencies |
ERCOT |
Approved |
Apr 30 '24 |
Nov 21 '24 |
| NPRR1236 RTC+B Modifications to RUC Capacity Short Calculations |
ERCOT |
Approved |
Jun 4 '24 |
Nov 21 '24 |
| NPRR1237 Retail Market Qualification Testing Requirements |
CenterPoint Energy |
Approved |
Jun 7 '24 |
Nov 21 '24 |
| NPRR1244 Clarification of Controllable Load Resource Primary Frequency Response Responsibilities |
Priority Power |
Approved |
Jul 24 '24 |
Nov 21 '24 |
| NPRR1216 Implementation of Emergency Pricing Program |
ERCOT |
Approved |
Jan 23 '24 |
Sep 26 '24 |
| NPRR1217 Remove Verbal Dispatch Instruction (VDI) Requirement for Deployment and Recall of Load Resources and Emergency Response Service (ERS) Resources |
ERCOT |
Approved |
Feb 28 '24 |
Sep 26 '24 |
| NPRR1219 ! Methodology Revisions and New Definitions for the Report on Capacity, Demand and Reserves in the ERCOT Region (CDR) |
ERCOT |
Approved |
Mar 5 '24 |
Sep 26 '24 |
| NPRR1225 Exclusion of Lubbock Load from Securitization Charges |
ERCOT |
Approved |
Apr 11 '24 |
Sep 26 '24 |
| NPRR1230 ! Methodology for Setting Transmission Shadow Price Caps for an IROL in SCED |
ERCOT |
Approved |
May 7 '24 |
Sep 26 '24 |
| NPRR1231 FFSS Program Communication Improvements and Additional Clarifications |
ERCOT |
Approved |
May 7 '24 |
Sep 26 '24 |
| NPRR1233 Modification of Weatherization Inspection Fees on the ERCOT Fee Schedule |
ERCOT |
Approved |
May 28 '24 |
Sep 26 '24 |
| NPRR1198 Congestion Mitigation Using Topology Reconfigurations |
EDF Renewables, Inc. |
Approved |
Aug 31 '23 |
Jul 25 '24 |
| NPRR1212 Clarification of Distribution Service Provider’s Obligation to Provide an ESI ID |
ERCOT |
Approved |
Nov 22 '23 |
Jul 25 '24 |
| NPRR1218 REC Program Changes Per P.U.C. SUBST. R. 25.173, Renewable Energy Credit Program |
ERCOT |
Approved |
Mar 5 '24 |
Jul 25 '24 |
| NPRR1220 Market Restart Approval Process Modifications |
ERCOT |
Approved |
Mar 20 '24 |
Jul 25 '24 |
| NPRR1222 Public Utility Commission of Texas Approval of the Methodology for Determining Ancillary Service Requirements |
ERCOT |
Approved |
Mar 20 '24 |
Jul 25 '24 |
| NPRR1223 Addition of TA Contact Information Into TDSP Application Form |
ERCOT |
Approved |
Mar 21 '24 |
Jul 25 '24 |
| NPRR1228 ! Continued One-Winter Procurements for Firm Fuel Supply Service (FFSS) |
ERCOT |
Approved |
May 2 '24 |
Jul 25 '24 |
| NPRR1197 Optional Exclusion of Load from Netting at ERCOT-Polled Settlement (EPS) Metering Facilities which Include Resources |
Engie |
Approved |
Aug 31 '23 |
Jun 13 '24 |
| NPRR1205 Revisions to Credit Qualification Requirements of Banks and Insurance Companies |
ERCOT |
Approved |
Oct 24 '23 |
Jun 13 '24 |
| NPRR1170 Submission of Gas Supply Disruption |
ERCOT |
Approved |
Mar 29 '23 |
Apr 11 '24 |
| NPRR1179 ! Fuel Purchase Requirements for Resources Submitting RUC Fuel Costs |
ERCOT |
Approved |
May 4 '23 |
Apr 11 '24 |
| NPRR1186 ! Improvements Prior to the RTC+B Project for Better ESR State of Charge Awareness, Accounting, and Monitoring |
ERCOT |
Approved |
Jun 22 '23 |
Apr 11 '24 |
| NPRR1193 Related to SMOGRR027, Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal |
ERCOT |
Approved |
Aug 9 '23 |
Apr 11 '24 |
| NPRR1195 Resource Entity Metering Facilities Maintenance |
STEC |
Approved |
Aug 17 '23 |
Apr 11 '24 |
| NPRR1199 ! Implementation of Lone Star Infrastructure Protection Act (LSIPA) Requirements |
ERCOT |
Approved |
Sep 6 '23 |
Apr 11 '24 |
| NPRR1206 Revisions to QSE Operations and Termination Requirements, and Elimination of Providing Certain Market Participant Principal Information |
ERCOT |
Approved |
Oct 25 '23 |
Apr 11 '24 |
| NPRR1207 Incidental Disclosure of Protected Information and ECEII During ERCOT Control Room Tours |
ERCOT |
Approved |
Nov 1 '23 |
Apr 11 '24 |
| NPRR1208 Creation of Invoice Report |
Reliant Energy |
Approved |
Nov 6 '23 |
Apr 11 '24 |
| NPRR1210 Next Start Resource Test and Load-Carrying Test Frequency |
ERCOT |
Approved |
Nov 15 '23 |
Apr 11 '24 |
| NPRR1211 Move OBD to Section 22 – Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints |
ERCOT |
Approved |
Nov 20 '23 |
Apr 11 '24 |
| NPRR1213 Allow DGRs and DESRs on Circuits Subject to Load Shed to Provide ECRS and Clarify Language Regarding DGRs and DESRs Providing Non-Spin |
Enchanted Rock |
Approved |
Nov 28 '23 |
Apr 11 '24 |
| NPRR1172 Fuel Adder Definition, Mitigated Offer Caps, and RUC Clawback |
Consumers |
Approved |
Apr 11 '23 |
Feb 1 '24 |
| NPRR1181 Submission of Coal and Lignite Inventory Notifications |
ERCOT |
Approved |
May 16 '23 |
Feb 1 '24 |
| NPRR1192 Move OBD to Section 22 – Requirements for Aggregate Load Resource Participation in the ERCOT Markets |
ERCOT |
Approved |
Aug 8 '23 |
Feb 1 '24 |
| NPRR1196 Correction of NCLR Ancillary Service Failed Quantity Calculations under NPRR1149 |
ERCOT |
Approved |
Aug 24 '23 |
Feb 1 '24 |
| NPRR1201 Limitations on Resettlement Timeline and Default Uplift Exposure Adjustments |
ERCOT |
Approved |
Sep 20 '23 |
Feb 1 '24 |
| NPRR1204 ! Considerations of State of Charge with Real-Time Co-Optimization Implementation |
ERCOT |
Approved |
Oct 10 '23 |
Feb 1 '24 |
| NPRR1184 Update to Procedures for Managing Interest on Cash Collateral |
Tenaska |
Approved |
May 30 '23 |
Nov 30 '23 |
| NPRR1150 Related to NOGRR230, WAN Participant Security |
ERCOT |
Approved |
Sep 28 '22 |
Oct 12 '23 |
| NPRR1163 Related to LPGRR070, Discontinuation of Interval Data Recorder (IDR) Meter Weather Sensitivity Process |
ERCOT |
Approved |
Feb 14 '23 |
Oct 12 '23 |
| NPRR1164 Black Start and Isochronous Control Capable Identification |
ERCOT |
Approved |
Feb 21 '23 |
Oct 12 '23 |
| NPRR1165 Revisions to Requirements of Providing Audited Financial Statements and Providing Independent Amount |
ERCOT |
Approved |
Feb 23 '23 |
Oct 12 '23 |
| NPRR1171 Requirements for DGRs and DESRs on Circuits Subject to Load Shedding |
ERCOT |
Approved |
Mar 29 '23 |
Oct 12 '23 |
| NPRR1173 Changes Consistent With the Options Available to an MOU and EC Entering Retail Competition in the ERCOT Market |
ERCOT |
Approved |
Apr 17 '23 |
Oct 12 '23 |
| NPRR1174 Market Participant’s Return of Settlement Funds to ERCOT Following Receipt of Overpayment |
ERCOT |
Approved |
Apr 24 '23 |
Oct 12 '23 |
| NPRR1175 Revisions to Market Entry Financial Qualifications and Continued Participation Requirements |
ERCOT |
Approved |
Apr 25 '23 |
Oct 12 '23 |
| NPRR1176 Update to EEA Trigger Levels |
ERCOT |
Approved |
Apr 25 '23 |
Oct 12 '23 |
| NPRR1182 Inclusion of Controllable Load Resources and Energy Storage Resources in the Constraint Competitiveness Test Process |
ERCOT |
Approved |
May 22 '23 |
Oct 12 '23 |
| NPRR1183 ECEII Definition Clarification and Updates to Posting Rules for Certain Documents without ECEII |
ERCOT |
Approved |
May 24 '23 |
Oct 12 '23 |
| NPRR1185 HDL Override Payment Provisions for Verbal Dispatch Instructions |
LCRA |
Approved |
May 31 '23 |
Oct 12 '23 |
| NPRR1189 Updates to Language to Clarify the Allowable Regulation Ancillary Service Trades |
ERCOT |
Approved |
Jun 28 '23 |
Oct 12 '23 |
| NPRR1143 Provide ERCOT Flexibility to Determine When ESRs May Charge During an EEA Level 3 |
ERCOT |
Approved |
Jul 27 '22 |
Jul 20 '23 |
| NPRR1161 Clarify AVR Notification Requirements for IRRs |
ERCOT |
Approved |
Feb 7 '23 |
Jul 20 '23 |
| NPRR1166 Protected Information Status of DC Tie Schedule Information |
ERCOT |
Approved |
Mar 7 '23 |
Jul 20 '23 |
| NPRR1168 Related to RMGRR172, Texas SET V5.0 Continuous Service Agreements Changes |
Texas SET |
Approved |
Mar 29 '23 |
Jul 20 '23 |
| NPRR1187 Administrative Change for August 1, 2023 Nodal Protocols – Clarifications to the Managed Capacity Declaration Form |
ERCOT |
Approved |
Jun 23 '23 |
Jul 20 '23 |
| NPRR1167 Improvements to Firm Fuel Supply Service Based on Lessons Learned |
ERCOT |
Approved |
Mar 8 '23 |
Jun 29 '23 |
| NPRR1169 ! Expansion of Generation Resources Qualified to Provide Firm Fuel Supply Service in Phase 2 of the Service |
ERCOT |
Approved |
Mar 29 '23 |
Jun 29 '23 |
| NPRR1177 ! Enhance Exceptional Fuel Cost Process |
Constellation |
Approved |
Apr 27 '23 |
Jun 29 '23 |
| NPRR1178 ! Expectations for Resources Providing ERCOT Contingency Reserve Service |
ERCOT |
Approved |
May 3 '23 |
Jun 29 '23 |
| NPRR1145 Use of State Estimator-Calculated ERCOT-Wide TLFs in Lieu of Seasonal Base Case ERCOT-Wide TLFs for Settlement |
ERCOT |
Approved |
Jul 27 '22 |
May 11 '23 |
| NPRR1155 Attestation Regarding Market Participant Citizenship, Ownership, or Headquarters |
ERCOT |
Approved |
Nov 22 '22 |
May 11 '23 |
| NPRR1157 Incorporation of PUCT Approval into Revision Request Process |
ERCOT |
Approved |
Dec 8 '22 |
May 11 '23 |
| NPRR1144 Station Service Backup Power Metering |
Plus Power |
Approved |
Jul 27 '22 |
Mar 23 '23 |
| NPRR1147 Update and Improve Notification and Evaluation Processes Associated with Reliability Must-Run (RMR) |
ERCOT |
Approved |
Aug 15 '22 |
Mar 23 '23 |
| NPRR1149 Implementation of Systematic Ancillary Service Failed Quantity Charges |
ERCOT |
Approved |
Sep 20 '22 |
Mar 23 '23 |
| NPRR1151 Protocol Revision Subcommittee Meeting Requirement |
Oncor |
Approved |
Sep 29 '22 |
Mar 23 '23 |
| NPRR1153 ERCOT Fee Schedule Changes |
ERCOT |
Approved |
Oct 26 '22 |
Mar 23 '23 |
| NPRR1158 Remove Sunset Date for Weatherization Inspection Fees |
ERCOT |
Approved |
Dec 15 '22 |
Mar 23 '23 |
| NPRR1159 Related to RMGRR171, Changes to Transition Process That Require Opt-in MOU and EC That Are Designating POLR to Provide Mass Transition Methodology to ERCOT |
ERCOT |
Approved |
Dec 22 '22 |
Mar 23 '23 |
| NPRR1160 Administrative Change for March 1, 2023 Nodal Protocols – Align Section 22 Attachment D: Standard Form Black Start Agreement |
ERCOT |
Approved |
Jan 31 '23 |
Feb 16 '23 |
| NPRR1128 Allow FFR Procurement up to FFR Limit Without Proration |
Hunt Energy Network |
Approved |
Mar 25 '22 |
Jan 26 '23 |
| NPRR1132 Communicate Operating Limitations during Cold and Hot Weather Conditions |
ERCOT |
Approved |
Apr 26 '22 |
Jan 26 '23 |
| NPRR1138 ! Communication of Capability and Status of Online IRRs at 0 MW Output |
ERCOT |
Approved |
May 25 '22 |
Jan 26 '23 |
| NPRR1148 Language Cleanup Related to ERCOT Contingency Reserve Service (ECRS) |
ERCOT |
Approved |
Aug 30 '22 |
Jan 26 '23 |
| NPRR1152 ! Remove Requirements to Submit Emergency Operations Plans, Weatherization Plans, and Declarations of Summer/Winter Weather Preparedness |
ERCOT |
Approved |
Oct 20 '22 |
Jan 26 '23 |
| NPRR1154 ! Include Alternate Resource in the Availability Plan for the Firm Fuel Supply Service |
LCRA |
Approved |
Nov 3 '22 |
Jan 26 '23 |
| NPRR1058 Resource Offer Modernization |
Reliant, LCRA,... |
Approved |
Nov 24 '20 |
Nov 3 '22 |
| NPRR1084 Improvements to Reporting of Resource Outages, Derates, and Startup Loading Failures |
ERCOT |
Approved |
Jun 30 '21 |
Nov 3 '22 |
| NPRR1118 Clarifications to the OSA Process |
ERCOT |
Approved |
Jan 25 '22 |
Nov 3 '22 |
| NPRR1127 Clarification of ERCOT Hotline Uses |
ERCOT |
Approved |
Mar 23 '22 |
Nov 3 '22 |
| NPRR1139 Adjustments to Capacity Shortfall Ratio Share for IRRs |
ERCOT |
Approved |
May 25 '22 |
Nov 3 '22 |
| NPRR1140 Recovering Fuel Costs for Generation Above LSL During RUC-Committed Hours |
ERCOT |
Approved |
Jun 7 '22 |
Nov 3 '22 |
| NPRR1085 Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs) |
ERCOT |
Approved |
Jun 30 '21 |
Sep 15 '22 |
| NPRR1112 ! Elimination of Unsecured Credit Limits |
ERCOT |
Approved |
Dec 22 '21 |
Sep 15 '22 |
| NPRR1131 Controllable Load Resource Participation in Non-Spin |
ERCOT |
Approved |
Apr 25 '22 |
Sep 15 '22 |
| NPRR1133 Clarify Responsibilities for Submission of Planning Model Data for DC Ties |
ERCOT |
Approved |
May 6 '22 |
Sep 15 '22 |
| NPRR1134 Related to RMGRR168, Modify ERCOT’s Mass Transition Responsibilities |
Texas SET |
Approved |
May 10 '22 |
Sep 15 '22 |
| NPRR1135 Add On-Line Status Check for Resources Telemetering OFFNS for Ancillary Service Imbalance Settlements |
ERCOT |
Approved |
May 17 '22 |
Sep 15 '22 |
| NPRR1136 Updates to Language Regarding a QSE Moving Ancillary Service Responsibility Between Resources |
ERCOT |
Approved |
May 18 '22 |
Sep 15 '22 |
| NPRR1137 Updates to Section 1.1 to Modify the OBD List Review Timeline and Other Clarifications |
Eric Winters Goff LLC |
Approved |
May 24 '22 |
Sep 15 '22 |
| NPRR1142 ! ERS Changes to Reflect Updated PUCT Rule Changes re SUBST. R. 25.507 |
ERCOT |
Approved |
Jul 14 '22 |
Aug 25 '22 |
| NPRR1100 ! Allow Generation Resources and Energy Storage Resources to Serve Customer Load When the Customer and the Resource are Disconnected from the ERCOT System |
Tesla |
Approved |
Oct 6 '21 |
Jul 14 '22 |
| NPRR1110 Black Start Requirements Update |
ERCOT |
Approved |
Nov 22 '21 |
Jul 14 '22 |
| NPRR1119 Removal of Extraneous Language Pertaining to the Calculation of Weekly Generation and Load Resource Capacity Forecasts |
ERCOT |
Approved |
Jan 27 '22 |
Jul 14 '22 |
| NPRR1121 Add a Posting Requirement to the Exceptional Fuel Cost Submission Process |
ERCOT |
Approved |
Feb 22 '22 |
Jul 14 '22 |
| NPRR1129 ! Posting ESI IDs of Transmission-Voltage Customer Opt-Outs |
ERCOT |
Approved |
Apr 12 '22 |
Jul 14 '22 |
| NPRR1130 ! Weatherization Inspection Fees Sunset Date Extension |
ERCOT |
Approved |
Apr 22 '22 |
Jul 14 '22 |
| NPRR1092 Reduce RUC Offer Floor and Limit RUC Opt-Out Provision |
IMM |
Approved |
Aug 11 '21 |
May 12 '22 |
| NPRR1096 Require Sustained Two-Hour Capability for ECRS and Four-Hour Capability for Non-Spin |
ERCOT |
Approved |
Sep 28 '21 |
May 12 '22 |
| NPRR1108 ! ERCOT Shall Approve or Deny All Resource Planned Outage Requests |
ERCOT |
Approved |
Nov 9 '21 |
May 12 '22 |
| NPRR1116 Remove Obsolete Reference to Market Information System (MIS) |
ERCOT |
Approved |
Jan 21 '22 |
May 12 '22 |
| NPRR1117 Related to SMOGRR025, Modifications to Line Loss Compensation Requirement for EPS Metering |
ERCOT |
Approved |
Jan 21 '22 |
May 12 '22 |
| NPRR1122 ! Clarifications for PURA Subchapter M Securitization Default Charges |
ERCOT |
Approved |
Feb 24 '22 |
May 12 '22 |
| NPRR1123 ! Clarifications for PURA Subchapter N Securitization Uplift Charges |
ERCOT |
Approved |
Feb 24 '22 |
May 12 '22 |
| NPRR1124 ! Recovering Actual Fuel Costs through RUC Guarantee |
ERCOT |
Approved |
Mar 9 '22 |
May 12 '22 |
| NPRR1125 ! Use of Financial Security for Securitization Default Charge and Securitization Uplift Charge Invoices and Escrow Deposit Requests |
ERCOT |
Approved |
Mar 11 '22 |
May 12 '22 |
| NPRR1095 Texas SET V5.0 Changes |
Texas SET |
Approved |
Sep 28 '21 |
Mar 31 '22 |
| NPRR1097 ! Create Resource Forced Outage Report |
ERCOT |
Approved |
Sep 29 '21 |
Mar 31 '22 |
| NPRR1098 Direct Current Tie (DC Tie) Reactive Power Capability Requirements |
ERCOT |
Approved |
Sep 29 '21 |
Mar 31 '22 |
| NPRR1099 Managing Network Operations Model Resource Nodes |
ERCOT |
Approved |
Sep 29 '21 |
Mar 31 '22 |
| NPRR1102 ERCOT Discretion for Adjusting Non-Interval Data Recorder (NIDR) Backcasted Load Profiles |
ERCOT |
Approved |
Oct 26 '21 |
Mar 31 '22 |
| NPRR1111 ! Related to SCR819, Improving IRR Control to Manage GTC Stability Limits |
ERCOT |
Approved |
Dec 13 '21 |
Mar 31 '22 |
| NPRR1113 ! Clarification of Regulation-Up Schedule for Controllable Load Resources in Ancillary Service Imbalance |
ERCOT |
Approved |
Dec 22 '21 |
Mar 31 '22 |
| NPRR1114 ! Securitization – PURA Subchapter N Uplift Charges |
ERCOT |
Approved |
Dec 29 '21 |
Mar 31 '22 |
| NPRR1120 ! Create Firm Fuel Supply Service |
ERCOT |
Approved |
Jan 31 '22 |
Mar 31 '22 |
| NPRR1115 Administrative Changes for February 1, 2022 Nodal Protocols - Update ERCOT Austin Office Address |
ERCOT |
Approved |
Jan 14 '22 |
Jan 27 '22 |
| NPRR1077 Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs |
ERCOT |
Approved |
May 19 '21 |
Dec 16 '21 |
| NPRR1091 ! Changes to Address Market Impacts of Additional Non-Spin Procurement |
Shell Energy North America |
Approved |
Aug 2 '21 |
Dec 16 '21 |
| NPRR1094 Allow Under Frequency Relay Load to be Manually Shed During EEA3 |
Oncor |
Approved |
Sep 1 '21 |
Dec 16 '21 |
| NPRR1101 ! Create Non-Spin Deployment Groups made up of Generation Resources Providing Off-Line Non-Spinning Reserve and Load Resources that are Not Controllable Load Resources Providing Non-Spinning Reserve |
ERCOT |
Approved |
Oct 20 '21 |
Dec 16 '21 |
| NPRR1103 ! Securitization – PURA Subchapter M Default Charges |
ERCOT |
Approved |
Nov 1 '21 |
Dec 16 '21 |
| NPRR1104 ! As-Built Definition of Real Time Liability Extrapolated (RTLE) |
ERCOT |
Approved |
Nov 2 '21 |
Dec 16 '21 |
| NPRR1105 ! Option to Deploy Distribution Voltage Reduction Measures Prior to Energy Emergency Alert (EEA) |
ERCOT |
Approved |
Nov 4 '21 |
Dec 16 '21 |
| NPRR1106 ! Deployment of Emergency Response Service (ERS) Prior to Declaration of Energy Emergency Alert (EEA) |
ERCOT |
Approved |
Nov 4 '21 |
Dec 16 '21 |
| NPRR1107 ! Addition of Weatherization Inspection Fees to the ERCOT Fee Schedule and Clarification of Generation Interconnection Request Fees |
ERCOT |
Approved |
Nov 9 '21 |
Dec 16 '21 |
| NPRR1109 ! Process for Reinstating Decommissioned Generation Resources |
ERCOT |
Approved |
Nov 9 '21 |
Dec 16 '21 |
| NPRR1082 Emergency Response Service (ERS) Test Exception for Co-located ERS Loads |
Enerwise Global Technologies |
Approved |
Jun 22 '21 |
Oct 28 '21 |
| NPRR1087 ! Prohibit Participation of Critical Loads as Load Resources or ERS Resources |
ERCOT |
Approved |
Jul 19 '21 |
Oct 28 '21 |
| NPRR1090 ! ERS Winter Storm Uri Lessons Learned Changes and Other ERS Items |
ERCOT |
Approved |
Jul 28 '21 |
Oct 28 '21 |
| NPRR1093 ! Load Resource Participation in Non-Spinning Reserve |
ERCOT |
Approved |
Sep 1 '21 |
Oct 28 '21 |
| NPRR995 RTF-6 Create Definition and Terms for Settlement Only Energy Storage |
Broad Reach Power |
Approved |
Jan 29 '20 |
Aug 19 '21 |
| NPRR1005 Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
ERCOT |
Approved |
Feb 26 '20 |
Aug 19 '21 |
| NPRR1063 Dynamic Rating Transparency |
DC Energy Texas |
Approved |
Jan 25 '21 |
Aug 19 '21 |
| NPRR1073 ! Market Entry/Participation by Principals of Counter-Parties with Financial Obligations |
Morgan Stanley... |
Approved |
Apr 5 '21 |
Aug 19 '21 |
| NPRR1078 ! Clarification of Potential Uplift |
Reliant Energy... |
Approved |
May 20 '21 |
Aug 19 '21 |
| NPRR1079 Day-Ahead Market RRS / ECRS 48-Hour Report Clarification |
ERCOT |
Approved |
May 20 '21 |
Aug 19 '21 |
| NPRR1083 ! Modification of Uplift Allocation Rules to Address Role of Central Counter-Party Clearinghouses |
ICE NGX Canada Inc. |
Approved |
Jun 25 '21 |
Aug 19 '21 |
| NPRR1086 ! Recovery, Charges, and Settlement for Operating Losses During an LCAP Effective Period |
ERCOT |
Approved |
Jul 14 '21 |
Aug 19 '21 |
| NPRR1080 ! Limiting Ancillary Service Price to System-Wide Offer Cap |
ERCOT and IMM |
Approved |
Jun 3 '21 |
Jun 28 '21 |
| NPRR1081 ! Revisions to Real-Time Reliability Deployment Price Adder to Consider Firm Load Shed |
ERCOT and IMM |
Approved |
Jun 3 '21 |
Jun 28 '21 |
| NPRR979 Incorporate State Estimator Standards and Telemetry Standards into Protocols |
ERCOT |
Approved |
Oct 29 '19 |
Jun 8 '21 |
| NPRR1062 Modify IDR Meter Requirement and Eliminate IDR Meter Requirement Report |
ERCOT |
Approved |
Jan 15 '21 |
Jun 8 '21 |
| NPRR1064 Identification of Chronic Congestion |
ERCOT |
Approved |
Jan 26 '21 |
Jun 8 '21 |
| NPRR1071 Minor Revisions to the Reporting of Demand Response by Retail Electric Providers and Non-Opt-In Entities |
ERCOT |
Approved |
Mar 18 '21 |
Jun 8 '21 |
| NPRR1074 ! “mp” Definition Revision |
Morgan Stanley... |
Approved |
Apr 6 '21 |
Jun 8 '21 |
| NPRR1075 ! Update Telemetered HSL and/or MPC for ESRs in Real-Time to Meet Ancillary Service Resource Responsibility |
Key Capture Energy |
Approved |
Apr 28 '21 |
Jun 8 '21 |
| NPRR1023 Change to CRR Repossession Process |
ERCOT |
Approved |
May 22 '20 |
Apr 13 '21 |
| NPRR1045 Transmission Operator Definition and Designation |
ERCOT |
Approved |
Sep 21 '20 |
Apr 13 '21 |
| NPRR1057 Modification to Real-Time Hub Price Formulas for Fully De-Energized Hubs |
ERCOT |
Approved |
Nov 24 '20 |
Apr 13 '21 |
| NPRR1059 Ability for MOUs and ECs to Send Non-BUSIDRRQ Interval Data |
Nueces Electric Cooperative |
Approved |
Dec 22 '20 |
Apr 13 '21 |
| NPRR1060 Improvements to ERS Testing Requirements and Other ERS Items |
ERCOT |
Approved |
Dec 29 '20 |
Apr 13 '21 |
| NPRR1065 Implementation Adjustment for NPRR917 |
ERCOT |
Approved |
Jan 27 '21 |
Apr 13 '21 |
| NPRR1066 Interconnection of Existing Generation Owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) Transferring Load into the ERCOT System |
ERCOT |
Approved |
Jan 27 '21 |
Apr 13 '21 |
| NPRR1069 ! Align Ancillary Service Responsibility for ESRs with NPRR987 |
ERCOT |
Approved |
Mar 1 '21 |
Apr 13 '21 |
| NPRR1068 Administrative Changes for March 1, 2021 Nodal Protocols - Remove “ROSC” from NCI Form |
ERCOT |
Approved |
Feb 11 '21 |
Feb 11 '21 |
| NPRR994 Clarify Generator Interconnection Neutral Project Classification |
ERCOT |
Approved |
Jan 29 '20 |
Feb 9 '21 |
| NPRR1024 Determination of Significance with Respect to Price Correction |
ERCOT |
Approved |
May 27 '20 |
Feb 9 '21 |
| NPRR1034 Frequency-Based Limits on DC Tie Imports or Exports |
Southern Cross Transmission |
Approved |
Jul 22 '20 |
Feb 9 '21 |
| NPRR1040 Compliance Metrics for Ancillary Service Supply Responsibility |
LCRA, STEC, and... |
Approved |
Aug 19 '20 |
Feb 9 '21 |
| NPRR1044 Enhancement of SSR Mitigation Requirement |
ERCOT |
Approved |
Sep 1 '20 |
Feb 9 '21 |
| NPRR1048 Clarification on NPRR978 Short-Term Adequacy Reports |
ERCOT |
Approved |
Oct 13 '20 |
Feb 9 '21 |
| NPRR1049 Management of DC Tie Load Zone Modifications |
ERCOT |
Approved |
Oct 22 '20 |
Feb 9 '21 |
| NPRR1050 Change to the Summer Commercial Operations Date Deadline for Including Planned Generation Capacity in Reports on the Capacity, Demand and Reserves in the ERCOT Region |
ERCOT |
Approved |
Oct 23 '20 |
Feb 9 '21 |
| NPRR1051 Removal of the Price Floor Applied to Day-Ahead Settlement Point Prices |
ERCOT |
Approved |
Oct 27 '20 |
Feb 9 '21 |
| NPRR1052 Load Zone Pricing for Settlement Only Storage Prior to NPRR995 Implementation |
ERCOT |
Approved |
Oct 27 '20 |
Feb 9 '21 |
| NPRR1053 BESTF-9 Exemption from Ancillary Service Supply Compliance Requirements for Energy Storage Resources Affected by EEA Level 3 Charging Suspensions |
ERCOT |
Approved |
Oct 28 '20 |
Feb 9 '21 |
| NPRR1054 Removal of Oklaunion Exemption Language |
American Electric Power |
Approved |
Nov 2 '20 |
Feb 9 '21 |
| NPRR1061 Administrative Changes for February 1, 2021 Nodal Protocols – Replace uses of “MIS Public Area” with “ERCOT website” |
ERCOT |
Approved |
Jan 14 '21 |
Jan 14 '21 |
| NPRR945 Net Metering Requirements |
TIEC |
Approved |
May 20 '19 |
Dec 8 '20 |
| NPRR1001 Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications |
ERCOT |
Approved |
Feb 24 '20 |
Dec 8 '20 |
| NPRR1007 ! RTC – NP 3: Management Activities for the ERCOT System |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1008 ! RTC – NP 4: Day-Ahead Operations |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1009 ! RTC – NP 5: Transmission Security Analysis and Reliability Unit Commitment |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1010 ! RTC – NP 6: Adjustment Period and Real-Time Operations |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1011 ! RTC – NP 8: Performance Monitoring |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1012 ! RTC – NP 9: Settlement and Billing |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1013 ! RTC – NP 1, 2, 16, and 25: Overview, Definitions and Acronyms, Registration and Qualification of Market Participants, and Market Suspension and Restart |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1014 ! BESTF-4 Energy Storage Resource Single Model |
ERCOT |
Approved |
Mar 25 '20 |
Dec 8 '20 |
| NPRR1026 BESTF-7 Self-Limiting Facilities |
ERCOT |
Approved |
Jun 4 '20 |
Dec 8 '20 |
| NPRR1028 RUC Process Alignment with Resource Limitations Not Modeled in the RUC Software |
Reliant |
Approved |
Jun 26 '20 |
Dec 8 '20 |
| NPRR1029 ! BESTF-6 DC-Coupled Resources |
ERCOT |
Approved |
Jun 26 '20 |
Dec 8 '20 |
| NPRR1031 Notices for Curtailment of Load |
DC Energy Texas |
Approved |
Jul 2 '20 |
Dec 8 '20 |
| NPRR1032 Consideration of Physical Limits of DC Ties in RUC Optimization and Settlements |
ERCOT |
Approved |
Jul 17 '20 |
Dec 8 '20 |
| NPRR1039 Replace the Term MIS Public Area with ERCOT Website |
ERCOT |
Approved |
Aug 18 '20 |
Dec 8 '20 |
| NPRR1041 Adjust Expiration of Protected Information Status for Wholesale Storage Load (WSL) Data |
ERCOT |
Approved |
Aug 19 '20 |
Dec 8 '20 |
| NPRR1042 Planned Capacity Adjustment in the Report on Capacity, Demand and Reserves in the ERCOT Region |
Reliant Energy... |
Approved |
Aug 26 '20 |
Dec 8 '20 |
| NPRR1043 Clarification of NPRR986 Language Related to Wholesale Storage Load |
ERCOT |
Approved |
Sep 1 '20 |
Dec 8 '20 |
| NPRR1046 Additional Revisions to Remove Dynamically Scheduled Resource (DSR) from the Protocols |
ERCOT |
Approved |
Sep 25 '20 |
Dec 8 '20 |
| NPRR1047 Consolidate Greybox re NPRR973 and NPRR1016 |
ERCOT |
Approved |
Sep 28 '20 |
Dec 8 '20 |
| NPRR1055 ! Market Notice and ERCOT Discretion re Late-Filed NOIE Eligibility Attestations for PTP Obligations with Links to an Option Bid Awards |
ERCOT |
Approved |
Nov 9 '20 |
Dec 8 '20 |
| NPRR984 Change ERS Standard Contract Terms |
ERCOT |
Approved |
Nov 22 '19 |
Oct 13 '20 |
| NPRR999 DC Tie Ramp Limitations |
ERCOT |
Approved |
Feb 20 '20 |
Oct 13 '20 |
| NPRR1027 Removal of Grey-Boxed Language Related to NPRR702, Flexible Accounts, Payment of Invoices, and Disposition of Interest on Cash Collateral |
ERCOT |
Approved |
Jun 11 '20 |
Oct 13 '20 |
| NPRR1033 Clarification of Financial Security Interest Payment and Withholding Processes Upon Termination of Market Participant Standard Form Agreement |
ERCOT |
Approved |
Jul 20 '20 |
Oct 13 '20 |
| NPRR1035 DC Tie Schedules Protected Information Expiry and Posting |
ERCOT |
Approved |
Jul 22 '20 |
Oct 13 '20 |
| NPRR1036 Late Payment Enforcement Provisions |
ERCOT |
Approved |
Jul 29 '20 |
Oct 13 '20 |
| NPRR1037 Correction to the Settlement of Switchable Generation Resources (SWGRs) Instructed to Switch to ERCOT |
ERCOT |
Approved |
Jul 29 '20 |
Oct 13 '20 |
| NPRR1038 ! BESTF-8 Limited Exemption from Reactive Power Requirements for Certain Energy Storage Resources |
ERCOT |
Approved |
Aug 6 '20 |
Oct 13 '20 |
| NPRR903 Day-Ahead Market Timing Deviations |
ERCOT |
Approved |
Oct 2 '18 |
Aug 11 '20 |
| NPRR973 Add Definitions for Generator Step-Up and Main Power Transformer |
ERCOT |
Approved |
Sep 25 '19 |
Aug 11 '20 |
| NPRR983 Delete Remaining Grey-Boxed Language Associated with NPRR257, Synchronization with Nodal Operating Guide Section 9, Monitoring Programs and Changes to Posting Requirements of Documents Considered CEII |
ERCOT |
Approved |
Nov 20 '19 |
Aug 11 '20 |
| NPRR990 Relocation of Combined Cycle Train to Resource Attribute |
ERCOT |
Approved |
Dec 16 '19 |
Aug 11 '20 |
| NPRR992 Updated Day-Ahead Liability for NPRR863, Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve |
ERCOT |
Approved |
Jan 28 '20 |
Aug 11 '20 |
| NPRR993 Grey Box Resolution re NPRR902 and NPRR928 |
ERCOT |
Approved |
Jan 29 '20 |
Aug 11 '20 |
| NPRR996 Alignment of Hub Bus Names Between Protocols and ERCOT Model |
ERCOT |
Approved |
Feb 6 '20 |
Aug 11 '20 |
| NPRR1000 Elimination of Dynamically Scheduled Resources |
Denton Municipal Electric |
Approved |
Feb 20 '20 |
Aug 11 '20 |
| NPRR1002 BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions |
ERCOT |
Approved |
Feb 25 '20 |
Aug 11 '20 |
| NPRR1003 Elimination of References to Resource Asset Registration Form |
ERCOT |
Approved |
Feb 26 '20 |
Aug 11 '20 |
| NPRR1004 Load Distribution Factor Process Update |
ERCOT |
Approved |
Feb 26 '20 |
Aug 11 '20 |
| NPRR1015 ! Clarification of DAM implementation of NPRR863 Phase 2 |
ERCOT |
Approved |
Mar 25 '20 |
Aug 11 '20 |
| NPRR1016 Clarify Requirements for Distribution Generation Resources (DGRs) and Distribution Energy Storage Resources (DESRs) |
ERCOT |
Approved |
Mar 25 '20 |
Aug 11 '20 |
| NPRR1020 ! Allow Some Integrated Energy Storage Designs to Calculate Internal Loads |
Tesla |
Approved |
Apr 28 '20 |
Aug 11 '20 |
| NPRR1030 ! Modify Allocator for CRR Auction Revenue Distribution |
ERCOT |
Approved |
Jul 1 '20 |
Aug 11 '20 |
| NPRR933 ! Reporting of Demand Response by Retail Electric Providers and Non-Opt-In Entities |
ERCOT |
Approved |
Apr 16 '19 |
Jun 9 '20 |
| NPRR975 Load Forecast Model Transparency |
Texas Competitive... |
Approved |
Sep 30 '19 |
Jun 9 '20 |
| NPRR987 ! BESTF-3 Energy Storage Resource Contribution to Physical Responsive Capability and Real-Time On-Line Reserve Capacity Calculations |
ERCOT |
Approved |
Dec 9 '19 |
Jun 9 '20 |
| NPRR989 ! BESTF-1 Energy Storage Resource Technical Requirements |
ERCOT |
Approved |
Dec 16 '19 |
Jun 9 '20 |
| NPRR1006 ! Update Real-Time On-Line Reliability Deployment Price Adder Inputs to Match Actual Data |
TIEC |
Approved |
Mar 3 '20 |
Jun 9 '20 |
| NPRR1018 ! Clarifications Regarding ERCOT Suspension or Termination of a QSE and Participation by a Virtual or Emergency QSE |
ERCOT |
Approved |
Apr 1 '20 |
Jun 9 '20 |
| NPRR1019 ! Pricing and Settlement Changes for Switchable Generation Resources (SWGRs) Instructed to Switch to ERCOT |
ERCOT |
Approved |
Apr 1 '20 |
Jun 9 '20 |
| NPRR1021 ! Adjustments to the Default Uplift Invoice Process |
Reliant Energy... |
Approved |
Apr 28 '20 |
Jun 9 '20 |
| NPRR1022 ! Submission of Banking Information |
ERCOT |
Approved |
May 12 '20 |
Jun 9 '20 |
| NPRR953 Addition of Relay Loadability Rating Definition |
ERCOT |
Approved |
Jun 27 '19 |
Apr 14 '20 |
| NPRR997 ! Natural Gas Pipeline Coordination Requirements for Resource Entities with Natural Gas Generation Resources |
ERCOT |
Approved |
Feb 7 '20 |
Apr 14 '20 |
| NPRR998 ! ERS Deployment and Recall Messages |
ERCOT |
Approved |
Feb 20 '20 |
Apr 14 '20 |
| NPRR826 Mitigated Offer Caps for RMR Resources |
Citigroup Energy, Inc. |
Approved |
Apr 11 '17 |
Feb 11 '20 |
| NPRR838 Updated O&M Cost for RMR Resources |
ERCOT |
Approved |
Jul 5 '17 |
Feb 11 '20 |
| NPRR955 Define Limited Impact Remedial Action Scheme (RAS) |
ERCOT |
Approved |
Jun 28 '19 |
Feb 11 '20 |
| NPRR963 Base Point Deviation Settlement and Deployment Performance Metrics for Energy Storage Resources (Combo Model) |
Tenaska Power Services |
Approved |
Jul 30 '19 |
Feb 11 '20 |
| NPRR964 Improvement of RMR Process and Removal of Synchronous Condenser Unit and Agreement |
ERCOT |
Approved |
Jul 31 '19 |
Feb 11 '20 |
| NPRR967 Remove the 10 MW Limit from the Definition of Limited Duration Resource (LDR) |
Advanced Power Alliance |
Approved |
Aug 27 '19 |
Feb 11 '20 |
| NPRR970 Reliability Unit Commitment (RUC) Fuel Dispute Process Clarification |
ERCOT |
Approved |
Sep 17 '19 |
Feb 11 '20 |
| NPRR971 Replacing the Real-Time Average Incremental Energy Cost |
ERCOT |
Approved |
Sep 24 '19 |
Feb 11 '20 |
| NPRR974 Capacity Insufficiency Operating Condition Notice (OCN) Transparency |
Texas Competitive... |
Approved |
Sep 30 '19 |
Feb 11 '20 |
| NPRR977 Create MIS Posting for RUC Cancellations |
ERCOT |
Approved |
Oct 29 '19 |
Feb 11 '20 |
| NPRR978 Alignment with Amendments to PUCT Substantive Rule 25.505 |
ERCOT |
Approved |
Oct 29 '19 |
Feb 11 '20 |
| NPRR980 Accounting for NSO Forced Outages and GINR Inactive Projects in the Report on the Capacity, Demand and Reserves in the ERCOT Region |
ERCOT |
Approved |
Nov 5 '19 |
Feb 11 '20 |
| NPRR982 Alignment of Block Load Transfer (BLT) Requirements Between Protocols and Nodal Operating Guide |
ERCOT |
Approved |
Nov 19 '19 |
Feb 11 '20 |
| NPRR985 Modify Forward Adjustment Factors to Include Pricing for the Current Operating Day |
ERCOT |
Approved |
Nov 22 '19 |
Feb 11 '20 |
| NPRR986 ! BESTF-2 Energy Storage Resource Energy Offer Curves, Pricing, Dispatch, and Mitigation |
ERCOT |
Approved |
Dec 5 '19 |
Feb 11 '20 |
| NPRR988 ! Correction to Conditions for DAM Award Eligibility for PTP Obligations with Links to an Option |
ERCOT |
Approved |
Dec 11 '19 |
Feb 11 '20 |
| NPRR849 Clarification of the Range of Voltage Set Points at a Generation Resource’s POI |
ERCOT |
Approved |
Sep 27 '17 |
Dec 10 '19 |
| NPRR902 ERCOT Critical Energy Infrastructure Information |
ERCOT |
Approved |
Sep 28 '18 |
Dec 10 '19 |
| NPRR928 Cybersecurity Incident Notification |
ERCOT |
Approved |
Mar 20 '19 |
Dec 10 '19 |
| NPRR937 Distribution Voltage Level Block Load Transfer (BLT) Deployment |
Golden Spread... |
Approved |
Apr 26 '19 |
Dec 10 '19 |
| NPRR941 Create a Lower Rio Grande Valley Hub |
DC Energy |
Approved |
May 7 '19 |
Dec 10 '19 |
| NPRR957 RTF-4 Definition of Energy Storage Resource and Related Registration and Telemetry Requirements |
Boston Energy... |
Approved |
Jul 16 '19 |
Dec 10 '19 |
| NPRR965 GREDP Shutdown Exemption |
Luminant Generation... |
Approved |
Aug 5 '19 |
Dec 10 '19 |
| NPRR968 Revise EEA Level 3 Triggers from 1375 MW to 1430 MW to Align with New Most Severe Single Contingency Value |
ERCOT |
Approved |
Aug 28 '19 |
Dec 10 '19 |
| NPRR969 Clean-up of Protocol 19.8, Retail Market Testing |
ERCOT |
Approved |
Aug 28 '19 |
Dec 10 '19 |
| NPRR972 Enhancing Existing CRR Transaction Limit Process |
ERCOT |
Approved |
Sep 25 '19 |
Dec 10 '19 |
| NPRR918 Validation for PTP Obligations with Links to an Option |
ERCOT |
Approved |
Jan 11 '19 |
Oct 8 '19 |
| NPRR930 ! Process, Pricing, and Cost Recovery for Delayed Resource Outages |
Citigroup |
Approved |
Mar 28 '19 |
Oct 8 '19 |
| NPRR936 CRR Account Holder Limits |
Engie |
Approved |
Apr 24 '19 |
Oct 8 '19 |
| NPRR939 Modification to Load Resources Providing RRS to Maintain Minimum PRC on Generators During Scarcity Conditions |
ERCOT |
Approved |
Apr 30 '19 |
Oct 8 '19 |
| NPRR940 Removal of Language Related to NPRR664, Fuel Index Price for Resource Definition and Real-Time Make-Whole Payments for Exceptional Fuel Cost Events |
ERCOT |
Approved |
May 2 '19 |
Oct 8 '19 |
| NPRR948 Instrument Transformer Testing Schedule and Removal of Reference to Fiber-Optic Current Transformers |
ERCOT |
Approved |
May 29 '19 |
Oct 8 '19 |
| NPRR950 ! Switchable Generation Resources Providing Black Start Service |
ERCOT |
Approved |
May 30 '19 |
Oct 8 '19 |
| NPRR951 Active and Inactive SCED Constraint Reporting |
DC Energy |
Approved |
Jun 6 '19 |
Oct 8 '19 |
| NPRR952 Use of Katy Hub for the Fuel Index Price |
ERCOT |
Approved |
Jun 12 '19 |
Oct 8 '19 |
| NPRR954 Allow Opt Out of 867 EPS Data |
ERCOT |
Approved |
Jun 28 '19 |
Oct 8 '19 |
| NPRR958 Modifications to Wind and Solar Capacity Calculations in the CDR |
ERCOT |
Approved |
Jul 19 '19 |
Oct 8 '19 |
| NPRR959 Creation of a Panhandle Region for Calculation of Seasonal Peak Average Capacity Contributions for Wind |
ERCOT |
Approved |
Jul 19 '19 |
Oct 8 '19 |
| NPRR960 Phased Approach and Clarifications for NPRR863, Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve |
ERCOT |
Approved |
Jul 22 '19 |
Oct 8 '19 |
| NPRR961 Related to NOGRR194, Relocate Black Start Training Attendance Requirements to Nodal Operating Guides |
ERCOT |
Approved |
Jul 24 '19 |
Oct 8 '19 |
| NPRR962 Publish Approved DC Tie Schedules |
ERCOT |
Approved |
Jul 29 '19 |
Oct 8 '19 |
| NPRR823 Amend the Definition of an Affiliate |
Engie NA |
Approved |
Mar 27 '17 |
Aug 13 '19 |
| NPRR904 Revisions to Real-Time On-Line Reliability Deployment Price Adder for ERCOT-Directed Actions Related to DC Ties and to Correct Design Flaws |
Rainbow Energy... |
Approved |
Oct 19 '18 |
Aug 13 '19 |
| NPRR917 Nodal Pricing for Settlement Only Distribution Generators (SODGs) and Settlement Only Transmission Generators (SOTGs) |
ERCOT |
Approved |
Jan 2 '19 |
Aug 13 '19 |
| NPRR931 As Built Hub Average Calculation |
ERCOT |
Approved |
Apr 16 '19 |
Aug 13 '19 |
| NPRR932 Addition of Load to Existing Load Zone |
ERCOT |
Approved |
Apr 16 '19 |
Aug 13 '19 |
| NPRR935 Post All Wind and Solar Forecasts |
ERCOT |
Approved |
Apr 16 '19 |
Aug 13 '19 |
| NPRR942 Clarification of Revised Transaction Limit Posting |
ERCOT |
Approved |
May 9 '19 |
Aug 13 '19 |
| NPRR943 Holiday Schedule Update |
ERCOT |
Approved |
May 14 '19 |
Aug 13 '19 |
| NPRR944 As Built Day-Ahead Market Energy Bid Curve Submission Validation |
ERCOT |
Approved |
May 20 '19 |
Aug 13 '19 |
| NPRR949 January 1, 2023 Changes to EPS Meter Communications Path |
ERCOT |
Approved |
May 29 '19 |
Aug 13 '19 |
| NPRR885 Must-Run Alternative (MRA) Details and Revisions Resulting from PUCT Project No. 46369, Rulemaking Relating to Reliability Must-Run Service |
ERCOT |
Approved |
Jul 3 '18 |
Jun 11 '19 |
| NPRR896 Reliability Must-Run and Must-Run Alternative Evaluation Process |
ERCOT |
Approved |
Aug 29 '18 |
Jun 11 '19 |
| NPRR921 RTF-2 Elimination of the Terms All-Inclusive Generation Resource and All-Inclusive Resource |
ERCOT |
Approved |
Jan 28 '19 |
Jun 11 '19 |
| NPRR923 Revision to Weather Responsiveness Determination Process |
Profiling Working Group (PWG) |
Approved |
Feb 8 '19 |
Jun 11 '19 |
| NPRR924 Addition of Form to Section 23 - IMRE Application for Registration |
ERCOT |
Approved |
Feb 14 '19 |
Jun 11 '19 |
| NPRR926 Removal of 90-Day Period Between SSR Study Approval and Synchronization |
ERCOT |
Approved |
Feb 27 '19 |
Jun 11 '19 |
| NPRR929 PTP Obligations with Links to an Option DAM Award Eligibility |
LCRA, Reliant Energy... |
Approved |
Mar 26 '19 |
Jun 11 '19 |
| NPRR891 Removal of NOIE Capacity Reporting Threshold for the Unregistered Distributed Generation Report |
ERCOT |
Approved |
Aug 15 '18 |
Apr 9 '19 |
| NPRR900 Clean-up Items Applicable to the State of Texas REC Trading Program |
ERCOT |
Approved |
Sep 26 '18 |
Apr 9 '19 |
| NPRR906 Clarifying the Decision Making Entity Process |
ERCOT |
Approved |
Oct 29 '18 |
Apr 9 '19 |
| NPRR908 Revisions to Mass Transition Processes |
ERCOT |
Approved |
Oct 31 '18 |
Apr 9 '19 |
| NPRR909 Address Unavailability Gap for ERS and Other Minor Clarifications |
ERCOT |
Approved |
Nov 20 '18 |
Apr 9 '19 |
| NPRR912 Settlement of Switchable Generation Resources (SWGRs) Instructed to Switch to ERCOT |
ERCOT |
Approved |
Nov 28 '18 |
Apr 9 '19 |
| NPRR914 Addition of Controllable Load Resources to 60-Day Reports |
ERCOT |
Approved |
Dec 19 '18 |
Apr 9 '19 |
| NPRR916 Mitigated Offer Floor Revisions |
ERCOT |
Approved |
Dec 27 '18 |
Apr 9 '19 |
| NPRR920 Change to Ramp Rate Calculation in Resource Limit Calculator |
ERCOT |
Approved |
Jan 25 '19 |
Apr 9 '19 |
| NPRR922 Modifications to DC Tie Import Forecast Method |
ERCOT |
Approved |
Jan 30 '19 |
Apr 9 '19 |
| NPRR925 ! Increasing Minimum Quantity for PTP Obligation Bids |
ERCOT |
Approved |
Feb 27 '19 |
Apr 9 '19 |
| NPRR927 Administrative Changes for April 1, 2019 Nodal Protocols – Update ERCOT Email Address |
ERCOT |
Approved |
Mar 16 '19 |
Mar 16 '19 |
| NPRR850 Market Suspension and Restart |
ERCOT |
Approved |
Sep 27 '17 |
Feb 12 '19 |
| NPRR863 Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve |
STEC |
Approved |
Jan 1 '18 |
Feb 12 '19 |
| NPRR871 Customer or Resource Entity Funded Transmission Projects Review Process |
ERCOT |
Approved |
Apr 17 '18 |
Feb 12 '19 |
| NPRR886 Agreements Between ERCOT and Other Control Area Operators |
Citigroup |
Approved |
Jul 13 '18 |
Feb 12 '19 |
| NPRR905 CRR Balancing Account Resettlement |
Market Settlements... |
Approved |
Oct 22 '18 |
Feb 12 '19 |
| NPRR907 Revise Definition of M1a to Reflect Actual Calendar Days |
ERCOT |
Approved |
Oct 29 '18 |
Feb 12 '19 |
| NPRR910 Clarify Treatment of RUC Resource that has a Day-Ahead Market Three-Part Supply Award |
ERCOT |
Approved |
Nov 28 '18 |
Feb 12 '19 |
| NPRR911 Improved Calculation of Real-Time LMPs at Logical Resource Nodes for On-Line Combined Cycle Generation Resources |
ERCOT |
Approved |
Nov 28 '18 |
Feb 12 '19 |
| NPRR915 ! Define Limited Duration Resource and Clarify Telemetered Resource Status Requirements |
Luminant Generation LLC |
Approved |
Dec 21 '18 |
Feb 12 '19 |
| NPRR878 ERS Obligation Report for TDSPs |
CenterPoint Energy |
Approved |
May 29 '18 |
Dec 11 '18 |
| NPRR879 SCED Base Point, Base Point Deviation, and Performance Evaluation Changes for IRRs that Carry Ancillary Services |
ERCOT |
Approved |
May 30 '18 |
Dec 11 '18 |
| NPRR881 Annual Validation Process Revisions |
CenterPoint Energy /... |
Approved |
Jun 20 '18 |
Dec 11 '18 |
| NPRR882 Related to PGRR067, Procedures for Wind and Solar Equipment Change |
ERCOT |
Approved |
Jun 26 '18 |
Dec 11 '18 |
| NPRR884 Adjustments to Pricing and Settlement for Reliability Unit Commitments (RUCs) of On-Line Combined Cycle Generation Resources |
ERCOT |
Approved |
Jul 2 '18 |
Dec 11 '18 |
| NPRR887 Monthly Posting of Default Uplift Exposure Information |
Citigroup |
Approved |
Jul 19 '18 |
Dec 11 '18 |
| NPRR889 RTF-1 Replace Non-Modeled Generator with Settlement Only Generator |
ERCOT |
Approved |
Aug 1 '18 |
Dec 11 '18 |
| NPRR892 Non-Spin Reserve Energy Floor Clarification |
Morgan Stanley |
Approved |
Aug 22 '18 |
Dec 11 '18 |
| NPRR893 Clarification of Fuel Index Price and Incorporation of System-Wide Offer Cap and Scarcity Pricing Mechanism Methodology into Protocols |
ERCOT |
Approved |
Aug 27 '18 |
Dec 11 '18 |
| NPRR894 Correction of Unaccounted For Energy (UFE) Formula |
ERCOT |
Approved |
Aug 28 '18 |
Dec 11 '18 |
| NPRR895 Inclusion of Photo-Voltaic Generation Resources (PVGRs) in Real-Time Ancillary Service Imbalance Payment or Charge |
ERCOT |
Approved |
Aug 29 '18 |
Dec 11 '18 |
| NPRR897 Adjustments to Black Start Service (BSS) Procurement Timeline and Testing |
ERCOT |
Approved |
Aug 29 '18 |
Dec 11 '18 |
| NPRR898 Modify Language on Returning Original EPS Metering Site Certification Documents to the TDSP |
ERCOT |
Approved |
Sep 19 '18 |
Dec 11 '18 |
| NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure |
ERCOT |
Approved |
Sep 25 '18 |
Dec 11 '18 |
| NPRR901 ! Switchable Generation Resource Status Code |
ERCOT |
Approved |
Sep 26 '18 |
Dec 11 '18 |
| NPRR845 RMR Process and Agreement Revisions |
ERCOT |
Approved |
Jul 27 '17 |
Oct 9 '18 |
| NPRR857 Creation of Direct Current Tie Operator Market Participant Role |
ERCOT |
Approved |
Nov 29 '17 |
Oct 9 '18 |
| NPRR869 Clarification of Language Related to Generation Netting for ERCOT-Polled Settlement Meters |
Reliant Energy... |
Approved |
Mar 22 '18 |
Oct 9 '18 |
| NPRR880 Publish Real-Time Market Shift Factors for Private Use Network Settlement Points |
DC Energy |
Approved |
Jun 19 '18 |
Oct 9 '18 |
| NPRR883 Adjustment to Settlement Equation for Ancillary Services Assignment |
ERCOT |
Approved |
Jun 28 '18 |
Oct 9 '18 |
| NPRR888 4-Coincident Peak Adjustment Methodology |
ERCOT |
Approved |
Jul 24 '18 |
Oct 9 '18 |
| NPRR890 ! Correction to Calculation of Real-Time LMPs at Logical Resource Node for On-Line Combined Cycle Generation Resources |
ERCOT |
Approved |
Aug 15 '18 |
Oct 9 '18 |
| NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap |
ERCOT |
Approved |
Aug 29 '17 |
Aug 7 '18 |
| NPRR856 Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements |
ERCOT |
Approved |
Nov 29 '17 |
Aug 7 '18 |
| NPRR862 Updates to Address Revisions under PUCT Project 46369 |
ERCOT |
Approved |
Dec 22 '17 |
Aug 7 '18 |
| NPRR866 Mapping Registered Distributed Generation and Load Resources to Transmission Loads in the Network Operations Model |
ERCOT |
Approved |
Feb 14 '18 |
Aug 7 '18 |
| NPRR873 Posting of the ERCOT Wide Intra-Hour Wind Power and Load Forecast on the MIS Public |
ERCOT |
Approved |
Apr 25 '18 |
Aug 7 '18 |
| NPRR874 Change to Report for Net Allocation to Load Settlement Stability |
Tenaska Power Service Co. |
Approved |
May 15 '18 |
Aug 7 '18 |
| NPRR875 Clarification for the Implementation of NPRR864, RUC Modifications to Consider Market-Based Solutions |
ERCOT |
Approved |
May 16 '18 |
Aug 7 '18 |
| NPRR877 Use of Actual Interval Data for IDR ESI IDs for Initial Settlement |
Oncor |
Approved |
May 17 '18 |
Aug 7 '18 |
| NPRR837 Regional Planning Group (RPG) Process Reform |
ERCOT |
Approved |
Jun 28 '17 |
Jun 12 '18 |
| NPRR851 Procedure for Managing Disconnections for Bidirectional Electrical Connections at Transmission Level Voltages |
Golden Spread... |
Approved |
Oct 25 '17 |
Jun 12 '18 |
| NPRR867 Revisions to CRR Auction Credit Lock Amount to Reduce Excess Collateral |
Credit Work Group |
Approved |
Feb 27 '18 |
Jun 12 '18 |
| NPRR870 Eliminate Requirement for Forward Adjustment Factors Report in the MIS Certified Area |
ERCOT |
Approved |
Mar 26 '18 |
Jun 12 '18 |
| NPRR876 Administrative Changes for June 1, 2018 Nodal Protocols |
ERCOT |
Approved |
May 16 '18 |
May 16 '18 |
| NPRR854 NOIE TDSP Submittal of Meters with Bidirectional Flow Caused by Generation Interconnected at Distribution Voltage |
South Texas Electric... |
Approved |
Nov 14 '17 |
Apr 10 '18 |
| NPRR858 Provide Complete Current Operating Plan (COP) Data |
Citigroup Energy Inc. |
Approved |
Dec 4 '17 |
Apr 10 '18 |
| NPRR860 Day-Ahead Market (DAM) Clean-Up |
ERCOT |
Approved |
Dec 21 '17 |
Apr 10 '18 |
| NPRR864 RUC Modifications to Consider Market-Based Solutions |
Shell Energy North America |
Approved |
Jan 2 '18 |
Apr 10 '18 |
| NPRR865 Publish RTM Shift Factors for Hubs, Load Zones, and DC Ties |
DC Energy Texas |
Approved |
Jan 16 '18 |
Apr 10 '18 |
| NPRR868 ! As-Built Hub and Load Zone Calculation |
ERCOT |
Approved |
Mar 1 '18 |
Apr 10 '18 |
| NPRR819 Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups |
ERCOT |
Approved |
Feb 3 '17 |
Feb 20 '18 |
| NPRR841 Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges |
ERCOT |
Approved |
Jul 25 '17 |
Feb 20 '18 |
| NPRR842 Study Area Load Information |
ERCOT |
Approved |
Jul 26 '17 |
Feb 20 '18 |
| NPRR844 Clarification to Outage Report |
Luminant Generation |
Approved |
Jul 26 '17 |
Feb 20 '18 |
| NPRR852 CRR Activity Calendar Approval Process |
ERCOT |
Approved |
Nov 8 '17 |
Feb 20 '18 |
| NPRR855 Criteria for Including Resources in the CDR Peak Average Capacity Contribution Calculations |
ERCOT |
Approved |
Nov 27 '17 |
Feb 20 '18 |
| NPRR861 ! Clarification of ERCOT’s Authority to Protect Its Jurisdictional Status |
ERCOT |
Approved |
Dec 21 '17 |
Feb 20 '18 |
| NPRR859 Administrative Changes for January 1, 2018 Nodal Protocols – SOC References and NCI Form |
ERCOT |
Approved |
Dec 13 '17 |
Dec 13 '17 |
| NPRR815 Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service |
Morgan Stanley |
Approved |
Jan 24 '17 |
Dec 12 '17 |
| NPRR825 Require ERCOT to Issue a DC Tie Curtailment Notice Prior to Curtailing any DC Tie Load |
Rainbow Energy... |
Approved |
Apr 5 '17 |
Dec 12 '17 |
| NPRR834 Clarifications for Repossessions of CRRs by ERCOT |
ERCOT |
Approved |
Jun 7 '17 |
Dec 12 '17 |
| NPRR839 Clarification of ERCOT Forwarding of Consumption and Other Data |
ERCOT |
Approved |
Jul 18 '17 |
Dec 12 '17 |
| NPRR843 Short-Term System Adequacy and AS Offer Disclosure Reports Additions |
ERCOT |
Approved |
Jul 26 '17 |
Dec 12 '17 |
| NPRR846 Allow Previously Committed ERS Resources to Participate in MRA Agreements and Other ERS Items |
ERCOT |
Approved |
Aug 25 '17 |
Dec 12 '17 |
| NPRR768 Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories |
ERCOT |
Approved |
Apr 21 '16 |
Oct 17 '17 |
| NPRR817 Create a Panhandle Hub |
DC Energy |
Approved |
Feb 1 '17 |
Oct 17 '17 |
| NPRR821 Elimination of the CRR Deration Process for Resource Node to Hub or Load Zone CRRs |
DC Energy Texas |
Approved |
Mar 13 '17 |
Oct 17 '17 |
| NPRR829 Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL |
Enchanted Rock /... |
Approved |
Apr 26 '17 |
Oct 17 '17 |
| NPRR836 Incorporation of Other Binding Document Forms into Protocol Section 23 |
ERCOT |
Approved |
Jun 21 '17 |
Oct 17 '17 |
| NPRR840 Implementation of Infeasible Ancillary Service Protocol Revisions |
ERCOT |
Approved |
Jul 25 '17 |
Oct 17 '17 |
| NPRR822 Designate Resource Node Procedure an Other Binding Document and Adjust the Process for Retiring Resource Nodes |
ERCOT |
Approved |
Mar 20 '17 |
Aug 8 '17 |
| NPRR833 ! Modify PTP Obligation Bid Clearing Change |
ERCOT |
Approved |
May 31 '17 |
Aug 8 '17 |
| NPRR562 Subsynchronous Resonance |
ERCOT |
Approved |
Aug 12 '13 |
Jun 13 '17 |
| NPRR796 Extended Character Set Clean Up |
ERCOT |
Approved |
Aug 10 '16 |
Jun 13 '17 |
| NPRR820 Clarification of Aggregate Generation Resource (AGR) Definition |
ERCOT |
Approved |
Feb 22 '17 |
Jun 13 '17 |
| NPRR824 Alignment of EEA Level 3 with NERC Reliability Standards EOP-011-1 and BAL-001-2 |
ERCOT |
Approved |
Mar 29 '17 |
Jun 13 '17 |
| NPRR827 ! Disallow PTP Obligation Bid Award where Clearing Price exceeds Bid Price by $0.25/MW per hour |
Crescent Power, Inc. |
Approved |
Apr 11 '17 |
Jun 13 '17 |
| NPRR830 ! Revision of 4-Coincident Peak Methodology |
ERCOT |
Approved |
Apr 26 '17 |
Jun 13 '17 |
| NPRR831 ! Inclusion of Private Use Networks in Load Zone Price Calculations |
ERCOT |
Approved |
May 3 '17 |
Jun 13 '17 |
| NPRR776 Voltage Set Point Communication |
ERCOT |
Approved |
May 18 '16 |
Apr 4 '17 |
| NPRR799 Updates to Outages of Transmission Facilities |
DC Energy Texas |
Approved |
Aug 25 '16 |
Apr 4 '17 |
| NPRR802 Settlements Clean-up |
ERCOT |
Approved |
Sep 26 '16 |
Apr 4 '17 |
| NPRR804 Remove Posting Requirement for Private Use Network Diagrams |
ERCOT |
Approved |
Sep 28 '16 |
Apr 4 '17 |
| NPRR808 Three Year CRR Auction |
Morgan Stanley... |
Approved |
Nov 15 '16 |
Apr 4 '17 |
| NPRR809 GTC or GTL for New Generation Interconnection |
PLWG |
Approved |
Nov 15 '16 |
Apr 4 '17 |
| NPRR810 Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies |
ERCOT |
Approved |
Dec 16 '16 |
Apr 4 '17 |
| NPRR812 Alignment of Currently Published Reports |
ERCOT |
Approved |
Jan 4 '17 |
Apr 4 '17 |
| NPRR813 Updated Terminology Related to Annual Market Settlement Operations Audits |
ERCOT |
Approved |
Jan 11 '17 |
Apr 4 '17 |
| NPRR818 ! Allow Curtailment of Certain DC Tie Load Prior to Declaring Emergency Condition |
Rainbow Energy... |
Approved |
Feb 1 '17 |
Apr 4 '17 |
| NPRR794 Relocation of Unregistered DG Reporting Requirements |
ERCOT |
Approved |
Aug 1 '16 |
Feb 14 '17 |
| NPRR800 ! Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices |
ERCOT |
Approved |
Aug 30 '16 |
Feb 14 '17 |
| NPRR805 Clarification for Multi-Month CRR Auction Offers |
ERCOT |
Approved |
Oct 6 '16 |
Feb 14 '17 |
| NPRR806 Clarification for Designation of Capacity or Refund PCRRs |
ERCOT |
Approved |
Oct 6 '16 |
Feb 14 '17 |
| NPRR773 Broadening Scope of Acceptable Letter of Credit Issuers |
GSEC |
Approved |
May 9 '16 |
Dec 13 '16 |
| NPRR783 Revision of Network Operations Model Consistency Audit Requirement |
ERCOT |
Approved |
Jun 1 '16 |
Dec 13 '16 |
| NPRR790 Addition of Phase Angle Limits to the Network Operations Model |
ERCOT |
Approved |
Jul 20 '16 |
Dec 13 '16 |
| NPRR791 Clarifications to IEL, MCE and Aggregate Amount Owed by Breaching Party |
ERCOT |
Approved |
Jul 27 '16 |
Dec 13 '16 |
| NPRR792 Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) |
ERCOT |
Approved |
Jul 27 '16 |
Dec 13 '16 |
| NPRR797 Actual Load by Forecast Zone Report and Display |
Reliant Energy... |
Approved |
Aug 10 '16 |
Dec 13 '16 |
| NPRR801 Non-Controllable Load Resource MW in PRC |
ERCOT |
Approved |
Aug 31 '16 |
Dec 13 '16 |
| NPRR803 Remove Grey-boxed Language from NPRR439, Updating a Counter-Party’s Available Credit Limit for Current Day DAM |
ERCOT |
Approved |
Sep 28 '16 |
Dec 13 '16 |
| NPRR747 Revision of Voltage Control Requirements |
ERCOT |
Approved |
Nov 25 '15 |
Oct 11 '16 |
| NPRR753 Allow AMS Data Submittal Process for TDSP-Read Non-Modeled Generators |
ERCOT |
Approved |
Jan 26 '16 |
Oct 11 '16 |
| NPRR755 Data Agent-Only QSE Registration |
ERCOT |
Approved |
Jan 27 '16 |
Oct 11 '16 |
| NPRR760 Calculation of Exposure Variables For Days With No Activity |
DC Energy Texas |
Approved |
Mar 1 '16 |
Oct 11 '16 |
| NPRR767 Commitment by RUC for Long Lead Time Resource |
ERCOT |
Approved |
Apr 21 '16 |
Oct 11 '16 |
| NPRR769 Alignment with VCMRR013, Clarifications to Verifiable Cost Appeals Process |
ERCOT |
Approved |
Apr 26 '16 |
Oct 11 '16 |
| NPRR770 Addition of Outaged Resource Capacity to the Ancillary Services Capacity Monitor |
Morgan Stanley... |
Approved |
Apr 28 '16 |
Oct 11 '16 |
| NPRR771 Clarifications to New ESI ID Creation Process |
Texas SET Working Group |
Approved |
May 4 '16 |
Oct 11 '16 |
| NPRR774 Remove Duplicate Language to Calculate Seasonal Transmission Loss Factors |
ERCOT |
Approved |
May 11 '16 |
Oct 11 '16 |
| NPRR775 Enhanced Implementation of Limits for Fast Responding Regulation Service |
ERCOT |
Approved |
May 13 '16 |
Oct 11 '16 |
| NPRR778 Modifications to Date Change and Cancellation Evaluation Window |
Texas SET Working Group |
Approved |
May 23 '16 |
Oct 11 '16 |
| NPRR779 Clarifies References to Texas Reliability Entity and Independent Market Monitor |
ERCOT |
Approved |
May 27 '16 |
Oct 11 '16 |
| NPRR781 Updates to Nodal Protocol Section 18, Load Profiling, to Align with Current Market Processes |
Profiling Working Group (PWG) |
Approved |
Jun 1 '16 |
Oct 11 '16 |
| NPRR782 Settlement of Infeasible Ancillary Services Due to Transmission Constraints |
ERCOT |
Approved |
Jun 1 '16 |
Oct 11 '16 |
| NPRR785 Synchronizing WGR and PVGR COPs with Short Term Wind and PhotoVoltaic Forecasts |
ERCOT |
Approved |
Jun 8 '16 |
Oct 11 '16 |
| NPRR786 Consumption Data Adjustments for Negative Load |
ERCOT |
Approved |
Jun 23 '16 |
Oct 11 '16 |
| NPRR787 Removal of Recipient Name Requirement for VDI Confirmations |
ERCOT |
Approved |
Jun 23 '16 |
Oct 11 '16 |
| NPRR788 ! RMR Study Modifications |
LCRA |
Approved |
Jul 7 '16 |
Oct 11 '16 |
| NPRR789 Publish All Mid-Term Load Forecast Results |
Citigroup Energy, Inc. |
Approved |
Jul 8 '16 |
Oct 11 '16 |
| NPRR793 ! Clarifications to RMR RUC Commitment and Other RMR Cleanups |
ERCOT |
Approved |
Jul 27 '16 |
Oct 11 '16 |
| NPRR795 ! Provisions for Refunds of Capital Contributions Made in Connection with an RMR Agreement |
ERCOT |
Approved |
Aug 2 '16 |
Oct 11 '16 |
| NPRR696 Price Correction Process Following a SCED Failure |
Bill Barnes on... |
Approved |
Apr 27 '15 |
Aug 9 '16 |
| NPRR738 ERS Performance Calculations During TDSP Outages |
MP2 Energy, LLC. |
Approved |
Oct 21 '15 |
Aug 9 '16 |
| NPRR709 Revisions to Alternative Dispute Resolution Procedure |
ERCOT |
Approved |
May 27 '15 |
Jun 14 '16 |
| NPRR752 Clarification of Revision Request Process |
ERCOT |
Approved |
Jan 22 '16 |
Jun 14 '16 |
| NPRR754 Revise Load Distribution Factors Report Posting Frequency |
ERCOT |
Approved |
Jan 26 '16 |
Jun 14 '16 |
| NPRR758 Improved Transparency for Outages Potentially Having a High Economic Impact |
ERCOT |
Approved |
Feb 26 '16 |
Jun 14 '16 |
| NPRR761 As-Built Clarification to NPRR515, Day-Ahead Market Self-Commitment of Generation Resources |
ERCOT |
Approved |
Mar 9 '16 |
Jun 14 '16 |
| NPRR762 Removal of Language Related to Responsive Reserve Provided by DC Ties |
ERCOT |
Approved |
Mar 18 '16 |
Jun 14 '16 |
| NPRR763 As-Built Clarification to NPRR553, Monthly BLT Payment and Charge for Presidio Exception |
ERCOT |
Approved |
Mar 24 '16 |
Jun 14 '16 |
| NPRR764 QSE Capacity Short Calculations Based on an 80% Probability of Exceedance (P80) |
ERCOT |
Approved |
Mar 30 '16 |
Jun 14 '16 |
| NPRR765 Remove Vendor Names for Fuel Indices from the Protocols |
ERCOT |
Approved |
Mar 30 '16 |
Jun 14 '16 |
| NPRR766 ! Alignment of System-Wide Discount Factor Description with Operational Adjustments to RDF |
ERCOT |
Approved |
Apr 18 '16 |
Jun 14 '16 |
| NPRR649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides |
ERCOT |
Approved |
Sep 12 '14 |
Apr 19 '16 |
| NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations |
ERCOT |
Approved |
Oct 28 '15 |
Apr 19 '16 |
| NPRR744 RUC Trigger for the Reliability Deployment Price Adder and Alignment with RUC Settlement |
ERCOT |
Approved |
Nov 18 '15 |
Apr 19 '16 |
| NPRR745 Change ERS Availability from an Hourly to 15-minute Interval Evaluation plus Other Minor Changes |
ERCOT |
Approved |
Nov 20 '15 |
Apr 19 '16 |
| NPRR746 Adjustments Due to Negative Load |
ERCOT |
Approved |
Nov 24 '15 |
Apr 19 '16 |
| NPRR748 Revisions associated with COM-002-4 and Other Clarifications Associated with Dispatch Instructions |
ERCOT |
Approved |
Nov 25 '15 |
Apr 19 '16 |
| NPRR749 Option Cost for Outstanding CRRs |
Saracen Energy West, LP |
Approved |
Dec 9 '15 |
Apr 19 '16 |
| NPRR750 Clarify Resource Status when Providing Fast Responding Regulation Service |
ERCOT |
Approved |
Dec 17 '15 |
Apr 19 '16 |
| NPRR691 Alignment of Protocols with NERC Reliability Standard BAL-001-TRE-1 |
PDCWG |
Approved |
Apr 6 '15 |
Feb 9 '16 |
| NPRR713 Reactive Power Testing Requirements |
Luminant |
Approved |
Jun 29 '15 |
Feb 9 '16 |
| NPRR720 Update to Settlement Stability Reporting Requirements |
Michelle Trenary on... |
Approved |
Jul 17 '15 |
Feb 9 '16 |
| NPRR734 Digital Attestation Signature Authority Clarification |
Brasovan Energy Solutions LLC |
Approved |
Sep 17 '15 |
Feb 9 '16 |
| NPRR739 Prohibiting Load Resources Associated with a Dynamically Scheduled Resource |
MP2 Energy, LLC. |
Approved |
Oct 21 '15 |
Feb 9 '16 |
| NPRR740 Retail Clarification and Cleanup |
ERCOT |
Approved |
Oct 22 '15 |
Feb 9 '16 |
| NPRR742 CRR Balancing Account Invoice Data Cuts |
Lower Colorado River... |
Approved |
Nov 18 '15 |
Feb 9 '16 |
| NPRR743 Revision to MCE to Have a Floor For Load Exposure |
ERCOT |
Approved |
Nov 18 '15 |
Feb 9 '16 |
| NPRR641 Season Definition Change for SwitchableResources Reporting Unavailable Capacity |
ERCOT |
Approved |
Jul 10 '14 |
Dec 8 '15 |
| NPRR702 Flexible Accounts, Payment of Invoices, and Disposition of Interest on Cash Collateral |
ERCOT |
Approved |
Apr 29 '15 |
Dec 8 '15 |
| NPRR705 Provides Consistency for References to the End Date of the Generation Interconnection Process |
ERCOT |
Approved |
May 20 '15 |
Dec 8 '15 |
| NPRR708 Clarifying ERCOT Actions During Energy Emergency Alerts |
ERCOT |
Approved |
May 26 '15 |
Dec 8 '15 |
| NPRR712 Clarification of RUC Process |
NRG |
Approved |
Jun 17 '15 |
Dec 8 '15 |
| NPRR715 Clarification of Generator Modeling in the Market System |
ERCOT |
Approved |
Jul 1 '15 |
Dec 8 '15 |
| NPRR716 Corrections to Aggregated Load and Participant Specific Generation Data Requirements |
ERCOT |
Approved |
Jul 8 '15 |
Dec 8 '15 |
| NPRR719 Removal of Trigger and Requirement to Reduce the Distributed Generation (DG) Registration Threshold |
Michelle Trenary on... |
Approved |
Jul 17 '15 |
Dec 8 '15 |
| NPRR725 Modifications to CDR PUN Capacity Forecasting and PUN Net Capacity Reporting Requirements |
ERCOT |
Approved |
Jul 29 '15 |
Dec 8 '15 |
| NPRR726 Daily Network Operations Model PSS/E File Posting Modification |
ERCOT |
Approved |
Aug 5 '15 |
Dec 8 '15 |
| NPRR727 Removal of Language Related to NPRR327, State Estimator Data Redaction Methodology |
Calpine, Thompson &... |
Approved |
Aug 5 '15 |
Dec 8 '15 |
| NPRR728 Removal of Language Related to NPRR484, Revisions to Congestion Revenue Rights Credit Calculations and Payments, and NPRR554, Clarification of Future Credit Exposure Calculation |
Luminant |
Approved |
Aug 11 '15 |
Dec 8 '15 |
| NPRR729 Clarification of Metering Requirements for Resources |
ERCOT |
Approved |
Aug 14 '15 |
Dec 8 '15 |
| NPRR730 Elimination of the RUC Behavioral Pricing Rule |
Calpine |
Approved |
Aug 17 '15 |
Dec 8 '15 |
| NPRR731 Changes to Annual Reporting Requirements for RUC Decommitment Payment Amounts |
ERCOT |
Approved |
Aug 20 '15 |
Dec 8 '15 |
| NPRR732 Adjustments to Verifiable Costs for Required Resubmissions and Clarification of RUC Forced Outage and Cancellation Procedures |
ERCOT |
Approved |
Aug 24 '15 |
Dec 8 '15 |
| NPRR733 Delete Expiration of Customer Load Data Protected Information Status |
ERCOT |
Approved |
Aug 26 '15 |
Dec 8 '15 |
| NPRR735 Load Resource Controlled by High-Set Under-Frequency Relay Resource Parameters |
ERCOT |
Approved |
Sep 30 '15 |
Dec 8 '15 |
| NPRR736 Updates to the Ancillary Service Capacity Monitor Display |
ERCOT |
Approved |
Sep 30 '15 |
Dec 8 '15 |
| NPRR737 Clarification of SASM Notifications |
STEC |
Approved |
Sep 30 '15 |
Dec 8 '15 |
| NPRR663 Ancillary Service Insufficiency Actions |
ERCOT |
Approved |
Oct 17 '14 |
Oct 13 '15 |
| NPRR689 Settlement of Ancillary Service Assignment in Real-Time Operations |
QMWG |
Approved |
Mar 26 '15 |
Oct 13 '15 |
| NPRR704 Revisions to the Size of Aggregate Generation Resources |
Clif Lange on behalf... |
Approved |
May 14 '15 |
Oct 13 '15 |
| NPRR714 Real-Time Make-Whole Payment for Exceptional Fuel Cost |
GDF SUEZ |
Approved |
Jun 30 '15 |
Oct 13 '15 |
| NPRR717 Clarification of EPS Metering Exception for ERS Generation |
Austin Energy |
Approved |
Jul 10 '15 |
Oct 13 '15 |
| NPRR718 Correct Requirement for Posting AML Data |
ERCOT |
Approved |
Jul 17 '15 |
Oct 13 '15 |
| NPRR721 Removal of Language Related to NPRR455, CRR Shift Factors Report |
Luminant |
Approved |
Jul 24 '15 |
Oct 13 '15 |
| NPRR722 Removal of Language Related to NPRR181, FIP Definition Revision |
Luminant |
Approved |
Jul 24 '15 |
Oct 13 '15 |
| NPRR723 Removal of grey-boxes from NPRR256, Adding Non-Compliance Language to QSE Performance Standards |
Luminant |
Approved |
Jul 24 '15 |
Oct 13 '15 |
| NPRR724 Removal of Language Related to NPRR493, Half-Hour RUC Clawback |
GDF Suez |
Approved |
Jul 24 '15 |
Oct 13 '15 |
| NPRR684 Annual RUC Impact Report Requirements |
ERCOT |
Approved |
Feb 18 '15 |
Aug 11 '15 |
| NPRR692 Removal of MIS Posting Requirement of DAM Credit Parameters |
ERCOT |
Approved |
Apr 8 '15 |
Aug 11 '15 |
| NPRR693 Incorporation of “Threshold Values for Competitive Constraint Test” into the Protocols |
ERCOT |
Approved |
Apr 9 '15 |
Aug 11 '15 |
| NPRR694 Non-Spin Schedule Requirements |
GDF Suez Energy Marketing |
Approved |
Apr 9 '15 |
Aug 11 '15 |
| NPRR695 Posting and Notice Requirements for Notifications of Suspension of Operations and Notifications of Change of Generation Resource Designation |
ERCOT |
Approved |
Apr 13 '15 |
Aug 11 '15 |
| NPRR699 Energy Offer Curve Caps for Make-Whole Calculations for Resource Type Other |
RCWG |
Approved |
Apr 29 '15 |
Aug 11 '15 |
| NPRR700 Utilizing Actual Fuel Costs in Startup Offer Caps |
RCWG |
Approved |
Apr 29 '15 |
Aug 11 '15 |
| NPRR701 As-Built Clarification of NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market |
ERCOT |
Approved |
Apr 29 '15 |
Aug 11 '15 |
| NPRR703 Clarification of Disclosure Requirements for GINR Study Information |
ERCOT |
Approved |
Apr 29 '15 |
Aug 11 '15 |
| NPRR706 Restore the ability to use Physical Responsive Reserve Capability as an Indicator of Available Frequency-Responsive Capacity |
ERCOT |
Approved |
May 20 '15 |
Aug 11 '15 |
| NPRR710 Removal of ORDC Phase 2 Language and Modification to HASL Calculation |
ERCOT |
Approved |
May 27 '15 |
Aug 11 '15 |
| NPRR662 Proxy Energy Offer Curves |
Thompson & Knight... |
Approved |
Oct 2 '14 |
Jun 9 '15 |
| NPRR668 Updates to Texas SET Implementation Guide Process |
Diana Rehfeldt on... |
Approved |
Nov 20 '14 |
Jun 9 '15 |
| NPRR674 Clarification of Water Supply Rights Documentation |
ERCOT |
Approved |
Dec 2 '14 |
Jun 9 '15 |
| NPRR679 ONOPTOUT for RUC Given After the Adjustment Period |
Tenaska Power Services |
Approved |
Jan 26 '15 |
Jun 9 '15 |
| NPRR680 ! Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation |
ERCOT |
Approved |
Jan 28 '15 |
Jun 9 '15 |
| NPRR681 Clarifications to Dynamic Ratings |
ERCOT |
Approved |
Jan 28 '15 |
Jun 9 '15 |
| NPRR682 Changes to Notification Method when ERCOT Intends to Procure Additional Ancillary Services |
ERCOT |
Approved |
Feb 4 '15 |
Jun 9 '15 |
| NPRR683 Revision to Available Credit Limit Calculation |
Luminant |
Approved |
Feb 9 '15 |
Jun 9 '15 |
| NPRR686 Changing the IRR Forecast from Next 48 Hours to Next 168 Hours |
ERCOT |
Approved |
Mar 9 '15 |
Jun 9 '15 |
| NPRR687 Required Telemetry for Operational Awareness and PDCWG Analysis |
GDF SUEZ Energy Marketing NA |
Approved |
Mar 20 '15 |
Jun 9 '15 |
| NPRR688 Black Start Services Testing Clarifications |
ERCOT |
Approved |
Mar 23 '15 |
Jun 9 '15 |
| NPRR690 Incorporation of Creditworthiness Standards into Protocols |
ERCOT |
Approved |
Mar 30 '15 |
Jun 9 '15 |
| NPRR698 ! Clarifications to NPRR595, RRS Load Resource Treatment In ORDC |
ERCOT |
Approved |
Apr 29 '15 |
Jun 9 '15 |
| NPRR642 Constraint Management During Energy Emergency Alerts |
ERCOT |
Approved |
Jul 23 '14 |
Apr 14 '15 |
| NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report |
Julie Thomas on... |
Approved |
Sep 24 '14 |
Apr 14 '15 |
| NPRR655 Discontinue Contingency List Changes Due to Weather Report |
Julie Thomas on... |
Approved |
Sep 24 '14 |
Apr 14 '15 |
| NPRR657 Discontinue Backup Control Plan Submittal Results, Dispatch Instructions Compliance Metrics, and Backup Control Plan Test Dates and Results Summary Reports |
MIS User Group |
Approved |
Sep 24 '14 |
Apr 14 '15 |
| NPRR661 Discontinue Posting Profile Data Evaluation Report |
Market Information... |
Approved |
Sep 24 '14 |
Apr 14 '15 |
| NPRR670 Clarification of Portfolio Weighted Auction Clearing Price (PWACP) |
ERCOT |
Approved |
Nov 24 '14 |
Apr 14 '15 |
| NPRR671 Incorporation of DAM Credit Parameters into Protocols |
ERCOT |
Approved |
Nov 24 '14 |
Apr 14 '15 |
| NPRR672 Clarification of EMR and ONEMR Status |
Morgan Stanley... |
Approved |
Nov 25 '14 |
Apr 14 '15 |
| NPRR673 Correction to Estimated Aggregate Liability (EAL) for a QSE that Represents Neither Load nor Generation |
ERCOT |
Approved |
Nov 26 '14 |
Apr 14 '15 |
| NPRR676 Emergency Response Service (ERS) Offer Disclosure |
TXU Energy |
Approved |
Dec 15 '14 |
Apr 14 '15 |
| NPRR677 Remove Outdated NERC Reference |
ERCOT |
Approved |
Dec 17 '14 |
Apr 14 '15 |
| NPRR678 Posting of Wind Peak Average Capacity Percentage Data |
ERCOT |
Approved |
Jan 22 '15 |
Apr 14 '15 |
| NPRR219 Resolution of Alignment Items A33, A92, A106, and A150 - TSPs Must Submit Outages for Resource Owned Equipment and Clarification of Changes in Status of Transmission Element Postings |
ERCOT |
Approved |
Mar 23 '10 |
Feb 10 '15 |
| NPRR645 Real-Time On-Line Capacity Revisions |
ERCOT |
Approved |
Jul 30 '14 |
Feb 10 '15 |
| NPRR646 Emergency Operations Settlement for CFC (formerly "Emergency Operations Settlement for CFC Testing") |
ERCOT |
Approved |
Jul 30 '14 |
Feb 10 '15 |
| NPRR648 Remove References to Flowgate Rights |
ERCOT |
Approved |
Aug 26 '14 |
Feb 10 '15 |
| NPRR658 Changes to Annual Reporting Requirements for RUC Payments Made to Resources with PPAs |
MISUG |
Approved |
Sep 24 '14 |
Feb 10 '15 |
| NPRR659 Discontinue RMR Cost Data Deviation Requests/Responses Report |
MISUG |
Approved |
Sep 24 '14 |
Feb 10 '15 |
| NPRR660 Remove CRR State Change Adder |
ERCOT |
Approved |
Sep 24 '14 |
Feb 10 '15 |
| NPRR665 As-Built Clarification of Reliability Deployment Price Adder |
ERCOT |
Approved |
Oct 22 '14 |
Feb 10 '15 |
| NPRR669 Maintaining Frequency Responsiveness from Generation Resources Providing RRS |
ERCOT |
Approved |
Nov 21 '14 |
Feb 10 '15 |
| NPRR560 Caps and Floors for Energy Storage Resources |
Emerging... |
Approved |
Jul 18 '13 |
Dec 9 '14 |
| NPRR595 RRS Load Resource Treatment In ORDC |
Tenaska Power Services Co. |
Approved |
Jan 29 '14 |
Dec 9 '14 |
| NPRR612 Reduction of Cure Period Subsequent to Event of Default |
ERCOT |
Approved |
Mar 26 '14 |
Dec 9 '14 |
| NPRR639 Correction to Minimum Current Exposure |
Reliant Energy... |
Approved |
Jul 3 '14 |
Dec 9 '14 |
| NPRR640 As-Built Clarification of Load Resource Participation in SCED and Non-Spin Qualification |
ERCOT |
Approved |
Jul 10 '14 |
Dec 9 '14 |
| NPRR647 CRR Auction Shadow Price Transparency |
Yes Energy |
Approved |
Aug 7 '14 |
Dec 9 '14 |
| NPRR651 Clarify DC Tie Data Request Timeline and Content |
ERCOT |
Approved |
Sep 17 '14 |
Dec 9 '14 |
| NPRR652 Posting of Information Under NERC Reliability Standards to the MIS |
ERCOT |
Approved |
Sep 18 '14 |
Dec 9 '14 |
| NPRR653 Removal of Reasonable Contribution Language For Market Participant Data Requests |
ERCOT |
Approved |
Sep 23 '14 |
Dec 9 '14 |
| NPRR664 ! Fuel Index Price for Resource Definition and Real-Time Make-Whole Payments for Exceptional Fuel Cost Events |
RCWG |
Approved |
Oct 22 '14 |
Dec 9 '14 |
| NPRR666 ! Clarification for the CRR Balancing Account |
ERCOT |
Approved |
Oct 30 '14 |
Dec 9 '14 |
| NPRR611 Modifications to CDR Wind Capacity Value |
ERCOT |
Approved |
Mar 26 '14 |
Oct 14 '14 |
| NPRR617 Energy Offer Flexibility |
Calpine |
Approved |
Apr 22 '14 |
Oct 14 '14 |
| NPRR632 Eliminate Manual Calculations When Producing 4-CP Billing Determinant Data |
ERCOT |
Approved |
Jun 23 '14 |
Oct 14 '14 |
| NPRR633 Remove Requirement for Confirmation of Ancillary Service Test Using Primary and Secondary Voice Circuits |
ERCOT |
Approved |
Jun 23 '14 |
Oct 14 '14 |
| NPRR634 Clarification for the Reporting of Demand Response |
ERCOT |
Approved |
Jun 24 '14 |
Oct 14 '14 |
| NPRR635 Clarification of Congestion Revenue Right Source/Sink Points |
Boston Energy |
Approved |
Jun 25 '14 |
Oct 14 '14 |
| NPRR636 Cleanup to Remove Software Documentation Posting Requirement and Align Three-Part Supply Offer Language |
ERCOT |
Approved |
Jun 27 '14 |
Oct 14 '14 |
| NPRR637 Clarification of ERS Language and ERCOT Process for Co-located Resources |
ERCOT |
Approved |
Jul 2 '14 |
Oct 14 '14 |
| NPRR643 ! Clarification of MIS Postings for Outages Upon Implementation of SCR774, Enhancement to Outage Scheduler and Reports |
ERCOT |
Approved |
Jul 30 '14 |
Oct 14 '14 |
| NPRR644 Operating Reserve Demand Curve Phase 2 Revisions |
ERCOT |
Approved |
Jul 30 '14 |
Oct 13 '14 |
| NPRR593 Clarification of Generic Transmission Limit Posting Requirements |
ERCOT |
Approved |
Jan 24 '14 |
Aug 12 '14 |
| NPRR604 Modification to Submission Timeline for Changes to Emergency Operations and Weatherization Plans |
NRG Texas, LLC |
Approved |
Mar 13 '14 |
Aug 12 '14 |
| NPRR608 Alignment of Transaction Timing to the PUCT Performance Measures |
ERCOT |
Approved |
Mar 26 '14 |
Aug 12 '14 |
| NPRR614 Clarification of Telemetered Value of HSL for Combined Cycle Generation Resources providing RRS |
EDF Trading North America LLC |
Approved |
Apr 11 '14 |
Aug 12 '14 |
| NPRR615 PVGR Forecasting |
ETWG |
Approved |
Apr 16 '14 |
Aug 12 '14 |
| NPRR616 Clarification of Notification for Undeliverable Ancillary Services |
Resmi Surendran |
Approved |
Apr 18 '14 |
Aug 12 '14 |
| NPRR618 Market Notices for Resettlement Statements and True-up Settlement Timeline Changes |
ERCOT |
Approved |
Apr 29 '14 |
Aug 12 '14 |
| NPRR619 Minimum Quantity for DAM PTP Obligation Bids |
ERCOT |
Approved |
Apr 30 '14 |
Aug 12 '14 |
| NPRR620 Collateral Requirements for Counter-Parties with No Load or Generation |
ERCOT |
Approved |
Apr 30 '14 |
Aug 12 '14 |
| NPRR621 Counter-Party Specific Calculations for M1 Variable |
ERCOT |
Approved |
Apr 30 '14 |
Aug 12 '14 |
| NPRR622 Replace Planning and Operations Information Website References with MIS |
ERCOT |
Approved |
Apr 30 '14 |
Aug 12 '14 |
| NPRR624 Generation Resource Operational Designation Transparency |
GATF |
Approved |
May 12 '14 |
Aug 12 '14 |
| NPRR626 ! Reliability Deployment Price Adder (formerly "ORDC Price Reversal Mitigation Enhancements") |
Luminant Energy Company, LLC |
Approved |
May 16 '14 |
Aug 12 '14 |
| NPRR628 Notification of Financial Impact of Settlement Disputes |
Jim Galvin on behalf... |
Approved |
May 21 '14 |
Aug 12 '14 |
| NPRR629 Removal of Black Start Plan Posting Requirement |
ERCOT |
Approved |
May 22 '14 |
Aug 12 '14 |
| NPRR630 As-Built Clarifications to Settlements of ORDC |
ERCOT |
Approved |
May 27 '14 |
Aug 12 '14 |
| NPRR631 ! Corrections to Definition of Credible Single Contingency |
ERCOT |
Approved |
Jun 17 '14 |
Aug 12 '14 |
| NPRR588 Clarifications for PV Generation Resources |
ETWG |
Approved |
Dec 17 '13 |
Jun 10 '14 |
| NPRR597 Utilize Initial Estimated Liability (IEL) Only During Initial Market Activity |
ERCOT |
Approved |
Feb 6 '14 |
Jun 10 '14 |
| NPRR599 Removal of FGR-Specific Settlement Language |
ERCOT |
Approved |
Feb 25 '14 |
Jun 10 '14 |
| NPRR600 Removal of Outdated Language to Scheduling and Operations of BLT Section |
ERCOT |
Approved |
Feb 28 '14 |
Jun 10 '14 |
| NPRR601 Inclusion of Incremental Exposure in Mass Transitions to Counter-Parties that are Registered as QSEs and LSEs and Provide POLR Service |
ERCOT |
Approved |
Mar 3 '14 |
Jun 10 '14 |
| NPRR606 Removal of Risk Management Verification Fee |
ERCOT |
Approved |
Mar 17 '14 |
Jun 10 '14 |
| NPRR607 Short-Term System Adequacy Report Posting Modification |
ERCOT |
Approved |
Mar 24 '14 |
Jun 10 '14 |
| NPRR609 ERCOT System Administration Fee and User Fees |
ERCOT |
Approved |
Mar 26 '14 |
Jun 10 '14 |
| NPRR610 Eliminate Late Fees and Late Fee Invoices |
ERCOT |
Approved |
Mar 26 '14 |
Jun 10 '14 |
| NPRR613 Clarification of Fuel Adder into the Mitigated Offer Cap |
ERCOT |
Approved |
Mar 26 '14 |
Jun 10 '14 |
| NPRR533 ! PCRR Eligibility Requirements (formerly "Clarification of PCRR Eligibility Requirements") |
ERCOT |
Approved |
Mar 29 '13 |
Apr 8 '14 |
| NPRR576 ! Changing Non-Spin Service to be Dispatched by ERCOT (formerly "Changing Non-Spin Service to an Off-Line Service") |
GDF Suez NA Inc. |
Approved |
Oct 24 '13 |
Apr 8 '14 |
| NPRR584 Alignment with TAC Procedures to Shorten the Appeals Timeline |
ERCOT |
Approved |
Dec 4 '13 |
Apr 8 '14 |
| NPRR586 Align Credit Lock for CRR Auctions with Transaction Submission Deadline |
Reliant Energy |
Approved |
Dec 10 '13 |
Apr 8 '14 |
| NPRR589 Ancillary Service Offers in the Supplemental Ancillary Services Market |
QMWG |
Approved |
Dec 30 '13 |
Apr 8 '14 |
| NPRR590 Inclusion of WSL in the Default Uplift Invoice Allocation |
ERCOT |
Approved |
Dec 31 '13 |
Apr 8 '14 |
| NPRR592 Clarification of Meter Repair Timelines for RTM Settlements |
ERCOT |
Approved |
Jan 24 '14 |
Apr 8 '14 |
| NPRR594 Clarifications to the ERCOT Fee Schedule and the Point-to-Point Option Award Fee |
ERCOT |
Approved |
Jan 27 '14 |
Apr 8 '14 |
| NPRR596 ! External Load Serving Entities |
ERCOT |
Approved |
Jan 29 '14 |
Apr 8 '14 |
| NPRR598 ! Clarify Inputs to PRC and ORDC |
ERCOT |
Approved |
Feb 12 '14 |
Apr 8 '14 |
| NPRR602 ! Exemption for Sharyland Brady Load Transition |
Reliant Energy... |
Approved |
Mar 10 '14 |
Apr 8 '14 |
| NPRR603 ! ERS Settlement and Service Types |
ERCOT |
Approved |
Mar 10 '14 |
Apr 8 '14 |
| NPRR580 Establishment of a Rolling CRR Balancing Account Fund |
ERCOT |
Approved |
Nov 6 '13 |
Feb 27 '14 |
| NPRR503 Removal of Language Related to NPRR219 |
Network Data Support... |
Approved |
Nov 20 '12 |
Feb 11 '14 |
| NPRR556 ! Resource Adequacy During Transmission Equipment Outage |
Tenaska Power Services |
Approved |
Jul 10 '13 |
Feb 11 '14 |
| NPRR563 Credit Lock Standards |
Morgan Stanley |
Approved |
Aug 16 '13 |
Feb 11 '14 |
| NPRR567 Stakeholder Review of Resource Registration Data Requirements |
Resource Data... |
Approved |
Sep 6 '13 |
Feb 11 '14 |
| NPRR569 Retail Clarification and Cleanup |
ERCOT |
Approved |
Sep 23 '13 |
Feb 11 '14 |
| NPRR573 Alignment of PRC Calculation |
ERCOT |
Approved |
Oct 21 '13 |
Feb 11 '14 |
| NPRR577 As-Built Clarification for Portion of WGR Group GREDP Evaluation |
ERCOT |
Approved |
Oct 31 '13 |
Feb 11 '14 |
| NPRR581 Add Fast Responding Regulation Service as a Subset of Regulation Service |
ERCOT |
Approved |
Nov 6 '13 |
Feb 11 '14 |
| NPRR591 ! As-Built Clarification and Corrections Related to NPRR568 and NPRR555 |
ERCOT |
Approved |
Jan 9 '14 |
Feb 11 '14 |
| NPRR587 Administrative Changes for January 1, 2014 Nodal Protocols |
ERCOT |
Approved |
Dec 12 '13 |
Dec 12 '13 |
| NPRR528 Clarification of Assessment of Chronic Congestion |
ERCOT |
Approved |
Mar 6 '13 |
Dec 10 '13 |
| NPRR529 Constraint Management Plan (formerly "Congestion Management Plan") |
ERCOT |
Approved |
Mar 6 '13 |
Dec 10 '13 |
| NPRR540 Clarification of Credible Single Contingency |
Frank Owens on behalf of OWG |
Approved |
Apr 26 '13 |
Dec 10 '13 |
| NPRR541 SPS and RAP Modeling Clarification |
ERCOT |
Approved |
Apr 29 '13 |
Dec 10 '13 |
| NPRR542 Clarification of the Use of Emergency Condition |
Operations Working... |
Approved |
Apr 30 '13 |
Dec 10 '13 |
| NPRR558 Addition of Bilateral Load Response Data to Protected Information List |
Reliant Energy... |
Approved |
Jul 12 '13 |
Dec 10 '13 |
| NPRR561 Clarification of Shutdown Telemetry Status |
ERCOT |
Approved |
Aug 9 '13 |
Dec 10 '13 |
| NPRR565 Seasonal Generation Notifications |
Luminant Energy Company, LLC |
Approved |
Aug 23 '13 |
Dec 10 '13 |
| NPRR566 Removal of Language Regarding QSE Service Filings |
ERCOT |
Approved |
Aug 27 '13 |
Dec 10 '13 |
| NPRR571 ! ERS Weather-Sensitive Loads Requirements |
Earth Networks |
Approved |
Oct 2 '13 |
Dec 10 '13 |
| NPRR575 ! Clarification of the RUC Resource Buy-Back Provision for Ancillary Services |
GDF Suez NA Inc. |
Approved |
Oct 23 '13 |
Dec 10 '13 |
| NPRR578 ! Restores RUC Decommitment Charge Language Deleted in NPRR416 |
ERCOT |
Approved |
Nov 6 '13 |
Dec 10 '13 |
| NPRR579 ! Amendment to the Minimum PTP Option Bid Price Approval Timeline |
ERCOT |
Approved |
Nov 6 '13 |
Dec 10 '13 |
| NPRR527 Required Combined Cycle Telemetry for Operational Awareness and PDCWG Analysis |
ERCOT |
Approved |
Mar 6 '13 |
Nov 19 '13 |
| NPRR536 ERS Time Obligation Certainty |
DSWG |
Approved |
Apr 19 '13 |
Nov 19 '13 |
| NPRR543 Message for Confirmed E-Tags |
Tenaska Power Service Co. |
Approved |
May 10 '13 |
Nov 19 '13 |
| NPRR545 Removal of Reference to Wave Traps |
ERCOT |
Approved |
May 28 '13 |
Nov 19 '13 |
| NPRR546 Removal of References to RUC Notifications |
ERCOT |
Approved |
Jun 4 '13 |
Nov 19 '13 |
| NPRR547 Governor Test Data |
ERCOT |
Approved |
Jun 5 '13 |
Nov 19 '13 |
| NPRR548 Remove NPRR153 Grey Boxes and Clarify Fixed Quantity Block Treatment in the DAM |
ERCOT |
Approved |
Jun 21 '13 |
Nov 19 '13 |
| NPRR549 Clarification for Posting Transmission Loss Factors |
ERCOT |
Approved |
Jun 24 '13 |
Nov 19 '13 |
| NPRR550 ! Modifications to Planning Reserve Margin Inputs |
GATF |
Approved |
Jun 27 '13 |
Nov 19 '13 |
| NPRR553 Monthly BLT Payment and Charge for Presidio Exception |
Jim Galvin on behalf... |
Approved |
Jul 3 '13 |
Nov 19 '13 |
| NPRR559 Revisions to MCE Calculation |
ERCOT |
Approved |
Jul 17 '13 |
Nov 19 '13 |
| NPRR564 ! Thirty-Minute Emergency Response Service (ERS) and Other ERS Revisions |
ERCOT |
Approved |
Aug 21 '13 |
Nov 19 '13 |
| NPRR568 ! Real-Time Reserve Price Adder Based on Operating Reserve Demand Curve |
ERCOT |
Approved |
Sep 19 '13 |
Nov 19 '13 |
| NPRR570 ! Reduce RTM Settlement Timeline to Operating Day Plus Five |
Harika Basaran and... |
Approved |
Sep 30 '13 |
Nov 19 '13 |
| NPRR519 Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements |
ERCOT |
Approved |
Feb 6 '13 |
Sep 17 '13 |
| NPRR524 ! Resource Limits in Providing Ancillary Service |
GDF Suez Energy... |
Approved |
Mar 5 '13 |
Sep 17 '13 |
| NPRR532 ! Performance Measurement and Verification and Telemetry Requirements for Load Resources Providing Non-Spin |
DSWG |
Approved |
Mar 26 '13 |
Sep 17 '13 |
| NPRR538 Clarification of the Non-Spin Energy Offer Curve Requirements for QSGRs |
ERCOT |
Approved |
Apr 25 '13 |
Sep 17 '13 |
| NPRR539 Amend Wholesale Storage Load Definition |
Mark Bruce on behalf... |
Approved |
Apr 26 '13 |
Sep 17 '13 |
| NPRR552 ! Additional Counter-Party Criteria |
ERCOT |
Approved |
Jul 3 '13 |
Sep 17 '13 |
| NPRR554 ! Clarification of Future Credit Exposure Calculation |
ERCOT |
Approved |
Jul 3 '13 |
Sep 17 '13 |
| NPRR555 ! Load Resource Participation in Security-Constrained Economic Dispatch |
ERCOT |
Approved |
Jul 3 '13 |
Sep 17 '13 |
| NPRR557 ! Clarification of Treatment of Holidays for RTM Settlement Timeline (formerly "Administrative Changes for August 1, 2013 Nodal Protocols") |
ERCOT |
Approved |
Jul 11 '13 |
Sep 17 '13 |
| NPRR551 ! Posting of Annual Planning Model |
ERCOT |
Approved |
Jul 1 '13 |
Sep 16 '13 |
| NPRR491 Updated Demand Response Information for ERCOT (formerly "Updated Distributed Generation and Demand Response Information for ERCOT") |
Edison Mission... |
Approved |
Oct 19 '12 |
Jul 16 '13 |
| NPRR513 Removal of Nodal Implementation Surcharge |
ERCOT |
Approved |
Jan 30 '13 |
Jul 16 '13 |
| NPRR515 Day-Ahead Market Self-Commitment of Generation Resources |
ERCOT |
Approved |
Feb 5 '13 |
Jul 16 '13 |
| NPRR516 Change to Verifiable Cost Manual Revision Process |
ERCOT |
Approved |
Feb 6 '13 |
Jul 16 '13 |
| NPRR517 Revisions to the Telemetry Standards and State Estimator Standards Approval Process |
ERCOT |
Approved |
Feb 6 '13 |
Jul 16 '13 |
| NPRR522 Adjustment of Demand Response Performance for Distribution Losses (formerly "Adjustment of Demand Response Performance for T&D Losses ") |
DSWG |
Approved |
Feb 25 '13 |
Jul 16 '13 |
| NPRR523 Available Credit Limit (ACLC and/or ACLD) Calculations During Computer System Failures |
EROCT |
Approved |
Mar 1 '13 |
Jul 16 '13 |
| NPRR525 Elimination of Three-Year Expiration for CRR Auction Revenue Distribution Methodology |
ERCOT |
Approved |
Mar 5 '13 |
Jul 16 '13 |
| NPRR526 Frequency of Audit on ERCOT Model |
ERCOT |
Approved |
Mar 6 '13 |
Jul 16 '13 |
| NPRR531 Clarification of IRR Forecasting Process Posting Requirement |
ERCOT |
Approved |
Mar 22 '13 |
Jul 16 '13 |
| NPRR495 Changes to Ancillary Services Capacity Monitor |
MIS User Group |
Approved |
Oct 29 '12 |
May 14 '13 |
| NPRR500 Posting of Generation that is Off but Available |
Morgan Stanley... |
Approved |
Nov 2 '12 |
May 14 '13 |
| NPRR510 Discretion in Operating Days in OUT Calculation, Clarification of Source of ACP and Clarification of the Definition of Financial Statements |
ERCOT |
Approved |
Dec 20 '12 |
May 14 '13 |
| NPRR511 ! Correction to Emergency Energy Settlement Language |
ERCOT |
Approved |
Jan 2 '13 |
May 14 '13 |
| NPRR514 ! Seasonal Generation Resource |
Luminant Energy Company LLC |
Approved |
Feb 4 '13 |
May 14 '13 |
| NPRR530 ! Transfers of Specific NOIEs Within a NOIE Load Zone to a Competitive Load Zone |
The City of Georgetown |
Approved |
Mar 20 '13 |
May 14 '13 |
| NPRR534 ! Clarification of QSE Responsibilities to Provide Service in NOIE Territory |
STEC, CPS Energy,... |
Approved |
Apr 3 '13 |
May 14 '13 |
| NPRR474 Clarification of Price Correction Principles and Associated Timelines |
ERCOT |
Approved |
Aug 8 '12 |
Mar 19 '13 |
| NPRR484 Revisions to Congestion Revenue Rights Credit Calculations and Payments |
Luminant Energy Company, LLC |
Approved |
Sep 28 '12 |
Mar 19 '13 |
| NPRR487 ! QSGR Dispatch Adjustment |
Luminant Energy LLC |
Approved |
Oct 3 '12 |
Mar 19 '13 |
| NPRR489 Planning Reserve Margin |
NRG Energy, Inc. |
Approved |
Oct 3 '12 |
Mar 19 '13 |
| NPRR492 Addition of System Lambda Information |
Jackie Ashbaugh on... |
Approved |
Oct 26 '12 |
Mar 19 '13 |
| NPRR493 Half-Hour RUC Clawback |
GDF Suez Energy Marketing NA |
Approved |
Oct 26 '12 |
Mar 19 '13 |
| NPRR496 Revise West Hub Definition Due to Permanent Topology Change |
ERCOT |
Approved |
Oct 31 '12 |
Mar 19 '13 |
| NPRR498 Cleanup of ERCOT Finance and Audit Committee Responsibilities in Operational Audits |
ERCOT |
Approved |
Oct 31 '12 |
Mar 19 '13 |
| NPRR499 Revisions to Digital Certificate Holder Qualification Requirements |
ERCOT |
Approved |
Oct 31 '12 |
Mar 19 '13 |
| NPRR502 Addition of Year 6 to the SSWG Base Cases |
Planning Working Group (PLWG) |
Approved |
Nov 20 '12 |
Mar 19 '13 |
| NPRR504 Removal of Language Related to LPGRR049 |
Ernie Podraza on... |
Approved |
Nov 27 '12 |
Mar 19 '13 |
| NPRR509 ! Shortened RTM Settlement Timeline |
Harika Basaran on... |
Approved |
Dec 20 '12 |
Mar 19 '13 |
| NPRR518 ! Removal of Notification Requirement for Disclosures of Protected Information Required by CFTC |
ERCOT |
Approved |
Feb 6 '13 |
Mar 19 '13 |
| NPRR520 ! Real-Time Mitigation Rules and Creation of a Real-Time Constraint Competitiveness Test |
ERCOT |
Approved |
Feb 6 '13 |
Mar 19 '13 |
| NPRR521 ! Transitional CRR Auction Capacity Value for Initial CRR Long-Term Auction Sequence |
ERCOT |
Approved |
Feb 15 '13 |
Mar 19 '13 |
| NPRR506 ! Correction of Reconfiguration SASM Language Inconsistency |
ERCOT |
Approved |
Dec 5 '12 |
Jan 15 '13 |
| NPRR507 ! Correction of PTP Obligation Settlement Language Related to NPRR322 and NPRR470 |
ERCOT |
Approved |
Dec 6 '12 |
Jan 15 '13 |
| NPRR512 Administrative Changes for February 1, 2013 Nodal Protocols |
ERCOT |
Approved |
Jan 8 '13 |
Jan 8 '13 |
| NPRR385 Negative Price Floor (formerly "Security Violation Analysis and Reporting and Negative Price Floor") |
Luminant Energy Company LLC |
Approved |
Jun 14 '11 |
Dec 11 '12 |
| NPRR461 ! Energy Storage Settlements Consistent With PUCT Project 39917 |
ERCOT |
Approved |
May 2 '12 |
Dec 11 '12 |
| NPRR466 Asset Depreciation Schedule for Capital Contributions |
RCWG |
Approved |
May 24 '12 |
Dec 11 '12 |
| NPRR473 Process for Submission of Generation Resource Weatherization Information |
ERCOT |
Approved |
Aug 8 '12 |
Dec 11 '12 |
| NPRR475 EPS Metering Exception for ERS Generation |
ERCOT |
Approved |
Aug 8 '12 |
Dec 11 '12 |
| NPRR476 Market Submitted Energy Offer Curves Disclosures |
Jackie Ashbaugh on... |
Approved |
Aug 16 '12 |
Dec 11 '12 |
| NPRR478 Extension of DAM QSE Offer and Bid Submission Deadline Due to ERCOT Systems Delays |
Calpine |
Approved |
Aug 21 '12 |
Dec 11 '12 |
| NPRR479 Daily Net Outage MW |
Mercuria Energy |
Approved |
Aug 21 '12 |
Dec 11 '12 |
| NPRR480 Removal of Language for Relaxing Transmission Constraints |
ERCOT |
Approved |
Aug 28 '12 |
Dec 11 '12 |
| NPRR481 Report of Hourly Actual System Load by Weather Zone |
Jackie Ashbaugh on... |
Approved |
Aug 30 '12 |
Dec 11 '12 |
| NPRR482 Removal of Duplicative Statement of Opportunity Requirements |
ERCOT |
Approved |
Aug 31 '12 |
Dec 11 '12 |
| NPRR483 REC Program Renewable Resource Self-Reporting MWH Production Data and Metering Requirements |
ERCOT |
Approved |
Sep 14 '12 |
Dec 11 '12 |
| NPRR488 Resource Entity and LSE QSE Designation or Change |
ERCOT |
Approved |
Oct 3 '12 |
Dec 11 '12 |
| NPRR497 ! Corrections to NPRR400 |
ERCOT |
Approved |
Oct 31 '12 |
Dec 11 '12 |
| NPRR501 ! Correct ERS Self-Provision Settlement Calculation |
ERCOT |
Approved |
Nov 14 '12 |
Dec 11 '12 |
| NPRR153 Generation Resource Fixed Quantity Block |
Transition Plan Task... |
Approved |
Sep 12 '08 |
Nov 13 '12 |
| NPRR425 Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR (formerly "Creation of a WGR Group for GREDP and Base Point Deviation Evaluation") |
ERCOT |
Approved |
Nov 1 '11 |
Nov 13 '12 |
| NPRR460 WGR Ramp Rate Limitations |
E.ON Climate & Renewables |
Approved |
May 2 '12 |
Nov 13 '12 |
| NPRR465 Transmission Planning Analysis to Minimize the Need for RMR Units |
Paul Rocha on behalf... |
Approved |
May 18 '12 |
Nov 13 '12 |
| NPRR467 Balancing Account Resettlement Due to DAM Resettlement |
Jim Galvin on behalf... |
Approved |
Jun 11 '12 |
Nov 13 '12 |
| NPRR471 Removal of Language Related to NPRR241 |
ERCOT |
Approved |
Aug 8 '12 |
Nov 13 '12 |
| NPRR485 ! Clarification for Fuel Adder Provisions |
Luminant |
Approved |
Oct 1 '12 |
Nov 13 '12 |
| NPRR464 ! SASM Procurement Reporting |
NRG Texas Power LLC |
Approved |
May 15 '12 |
Sep 18 '12 |
| NPRR470 ! Real-Time PTP Option Modeling Language Cleanup |
ERCOT |
Approved |
Aug 2 '12 |
Sep 18 '12 |
| NPRR472 ! Implementation Clarifications for Consideration of DC Tie Lines and Outages in CCTs |
ERCOT |
Approved |
Aug 8 '12 |
Sep 18 '12 |
| NPRR477 ! Exception for Block Load Transfers at Presidio |
American Electric... |
Approved |
Aug 17 '12 |
Sep 18 '12 |
| NPRR416 Creation of the RUC Resource Buyback Provision (formerly "Removal of the RUC Clawback Charge for Resources Other than RMR Units") |
Exelon, Calpine |
Approved |
Sep 20 '11 |
Jul 17 '12 |
| NPRR436 Clarify the Use of the Defined Term Season and Its Derivatives |
Operations Working... |
Approved |
Jan 17 '12 |
Jul 17 '12 |
| NPRR438 Additional Minimum Counter-Party Qualification Requirements, Including Risk Management Capability Requirements |
ERCOT |
Approved |
Jan 24 '12 |
Jul 17 '12 |
| NPRR443 Removal of Switchable Generation Resource Plans from Protected Information |
ERCOT |
Approved |
Feb 7 '12 |
Jul 17 '12 |
| NPRR445 DC Tie Load Zone Price Clarification |
ERCOT |
Approved |
Feb 27 '12 |
Jul 17 '12 |
| NPRR446 Correction of Non-Spin Ancillary Service Schedule Telemetry for Standing Non-Spin Deployment |
ERCOT |
Approved |
Feb 29 '12 |
Jul 17 '12 |
| NPRR447 Remove Day- Ahead QSE Requested Decommit Language |
ERCOT |
Approved |
Mar 5 '12 |
Jul 17 '12 |
| NPRR452 Clarification of Reactive Power Requirements |
John Adams on behalf... |
Approved |
Mar 23 '12 |
Jul 17 '12 |
| NPRR454 Removal of Unfunded Project List Language |
ERCOT |
Approved |
Apr 4 '12 |
Jul 17 '12 |
| NPRR455 CRR Shift Factors Report |
Jackie Ashbaugh on... |
Approved |
Apr 4 '12 |
Jul 17 '12 |
| NPRR456 Clarification of Definition of Electrically Similar Settlement Points and Heuristic Pricing Posting |
ERCOT |
Approved |
Apr 4 '12 |
Jul 17 '12 |
| NPRR457 Daily Update of New ESI IDs and AMS Meter and Switch Hold Indicators Changes (formerly Conditional TDSP ESIID Attribute Information for 814_20 Transactions) |
Jackie Ashbaugh on... |
Approved |
Apr 4 '12 |
Jul 17 '12 |
| NPRR458 Establishment of ERCOT’s Central Counterparty Role |
ERCOT |
Approved |
Apr 4 '12 |
Jul 17 '12 |
| NPRR459 ! Better Matching Forward Collateralization with Forward Risk in the Real-Time Market |
NRG |
Approved |
May 1 '12 |
Jul 17 '12 |
| NPRR462 Removal of Consumer Benefit Test from the ERCOT Planning Criteria |
ERCOT |
Approved |
May 2 '12 |
Jul 17 '12 |
| NPRR468 ! Alignment of System-Wide Offer Cap and Scarcity Pricing Mechanism Language with PUCT Substantive Rules |
ERCOT |
Approved |
Jun 13 '12 |
Jul 17 '12 |
| NPRR469 ! Modifications to CCTs |
M. Wagner at the... |
Approved |
Jun 15 '12 |
Jul 17 '12 |
| NPRR453 ! Separation of Year 1 and Year 2 of the Annual CRR Auctions by Timing |
ERCOT |
Approved |
Apr 2 '12 |
Jun 19 '12 |
| NPRR463 ! CRR Auction Structure Enhancements |
DC Energy Texas LLC |
Approved |
May 7 '12 |
Jun 19 '12 |
| NPRR412 Quick Start Generation Resource Compliance Metric Adjustments |
South Texas Electric... |
Approved |
Sep 12 '11 |
May 15 '12 |
| NPRR439 Updating a Counter-Party's Available Credit Limit for Current Day DAM |
ERCOT |
Approved |
Jan 25 '12 |
May 15 '12 |
| NPRR441 Revision of Dynamic Rating Recommendation Posting Timeline |
ERCOT |
Approved |
Feb 1 '12 |
May 15 '12 |
| NPRR442 ! Energy Offer Curve Requirement for Generation Resources Providing Reliability Must-Run Service |
Morgan Stanley |
Approved |
Feb 3 '12 |
May 15 '12 |
| NPRR327 State Estimator Data Redaction Methodology |
ERCOT |
Approved |
Feb 22 '11 |
Apr 17 '12 |
| NPRR393 SCED Constraint Management Transparency |
Bill Barnes on behaf... |
Approved |
Jul 14 '11 |
Apr 17 '12 |
| NPRR394 Outage Reporting |
Edison Mission |
Approved |
Jul 14 '11 |
Apr 17 '12 |
| NPRR397 Balance of the Day Ancillary Service Market |
Morgan Stanley |
Approved |
Aug 1 '11 |
Apr 17 '12 |
| NPRR402 Clarification of Pre-DAM RUC Instruction Sequence |
ERCOT |
Approved |
Aug 8 '11 |
Apr 17 '12 |
| NPRR405 Clarification of DC Tie Load into Operational Systems and Processes |
EDF Trading North... |
Approved |
Aug 29 '11 |
Apr 17 '12 |
| NPRR419 Revise Real-Time Energy Imbalance and RMR Adjustment Charge |
ERCOT |
Approved |
Oct 5 '11 |
Apr 17 '12 |
| NPRR421 Clarification of RMR Notifications |
Edison Mission... |
Approved |
Oct 24 '11 |
Apr 17 '12 |
| NPRR424 Reactive Capability Testing Requirements for IRRs |
ERCOT |
Approved |
Nov 2 '11 |
Apr 17 '12 |
| NPRR430 Corrections Related to NPRR357, Revisions to Collateral Requirements Concerning CRR Auctions, and Clarification to Collateral Requirements |
ERCOT |
Approved |
Nov 28 '11 |
Apr 17 '12 |
| NPRR431 Board Priority Revision Requests |
ERCOT |
Approved |
Nov 30 '11 |
Apr 17 '12 |
| NPRR433 Clarification of Ancillary Service Obligation Calculation Process |
ERCOT |
Approved |
Dec 9 '11 |
Apr 17 '12 |
| NPRR448 ! Clarification of Database Query Results |
Kathryn Thurman on... |
Approved |
Mar 7 '12 |
Apr 17 '12 |
| NPRR449 ! Reduce Maximum CRR Transaction Limit in Auctions |
WMS |
Approved |
Mar 13 '12 |
Apr 17 '12 |
| NPRR450 ! Revise Requirements for Contracts to Procure Additional Capacity to Alleviate Emergency Conditions (formerly "Revise Board Approval Requirement for Contracts to Procure Additional Capacity to Alleviate Emergency Conditions") |
ERCOT |
Approved |
Mar 14 '12 |
Apr 17 '12 |
| NPRR451 ! Implementation of New P.U.C. Subst. Rule 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Response Service (ERS) |
ERCOT |
Approved |
Mar 15 '12 |
Apr 17 '12 |
| NPRR407 Credit Monitoring Posting Requirements (formerly "Credit Monitoring Credit Parameters Posting Requirements") |
Tenaska |
Approved |
Sep 5 '11 |
Feb 21 '12 |
| NPRR408 Clarification of ERCOT Authority to Deny Energization of Non-Compliant Generators |
ERCOT |
Approved |
Sep 6 '11 |
Feb 21 '12 |
| NPRR422 Public DAM Shift Factors |
Jackie Ashbaugh on... |
Approved |
Oct 27 '11 |
Feb 21 '12 |
| NPRR423 Add Voltage Support Requirement for IRRs and Allow SCADA Control of Static VAr Devices if Approved by ERCOT (formerly "Add Voltage Support Requirement for IRRs and Allow Manual Control of Static VAr Devices if Approved by ERCOT") |
ERCOT |
Approved |
Nov 2 '11 |
Feb 21 '12 |
| NPRR432 ! Deployment of Resources to Alleviate Anticipated Emergency Conditions (formerly "Deployment of Resources to Alleviate Imminent Emergency Conditions") |
ERCOT |
Approved |
Dec 2 '11 |
Feb 21 '12 |
| NPRR434 ! Increase the Capacity Limitation of a Generation Resource Providing RRS |
Robert Helton on... |
Approved |
Dec 27 '11 |
Feb 21 '12 |
| NPRR435 ! Requirements for Energy Offer Curves in the Real Time SCED for Generation Resources Committed in RUC |
ERCOT |
Approved |
Jan 3 '12 |
Feb 21 '12 |
| NPRR437 ! Allow Aggregation of Multiple Generators Into A Single Resource For Market and Engineering Modeling |
ERCOT |
Approved |
Jan 23 '12 |
Feb 21 '12 |
| NPRR413 Oklaunion Exemption Calculation Verification |
ERCOT |
Approved |
Sep 12 '11 |
Jan 17 '12 |
| NPRR414 UFE Calculation Clarifications |
ERCOT |
Approved |
Sep 12 '11 |
Jan 17 '12 |
| NPRR415 Inadvertent Interchange and Inadvertent Energy Clarification |
Frank Owens on... |
Approved |
Sep 21 '11 |
Jan 17 '12 |
| NPRR417 TDSP Submittal of Consumption and Demand Values for AMS ESI IDs |
ERCOT |
Approved |
Oct 4 '11 |
Jan 17 '12 |
| NPRR351 ! SCED Look-Ahead Step 1: Pricing: Calculate Non-Binding Prices and Basepoints for Initial Research into SCED Look-Ahead and allow Consumers to have a Forward Price Projection (formerly "Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes") |
WMS |
Approved |
Apr 13 '11 |
Dec 12 '11 |
| NPRR377 Alternate Inputs to Base Point Deviation Charge |
ERCOT |
Approved |
Jun 7 '11 |
Dec 12 '11 |
| NPRR395 CRR Auction Offer Award Disclosure |
DC Energy |
Approved |
Jul 15 '11 |
Dec 12 '11 |
| NPRR398 Changes to Resource Category Minimum-Energy Generic Heat Rates |
ERCOT |
Approved |
Aug 3 '11 |
Dec 12 '11 |
| NPRR399 Updates to Protocol Sections Related to Settlements and Billing |
ERCOT |
Approved |
Aug 3 '11 |
Dec 12 '11 |
| NPRR401 Clarification of Timing for a Generation Resource to be Considered Self-Committed |
ERCOT |
Approved |
Aug 3 '11 |
Dec 12 '11 |
| NPRR403 Revised FASD Calculation for TX SET Version 4.0 Release |
Market Coordination... |
Approved |
Aug 15 '11 |
Dec 12 '11 |
| NPRR404 Clarification of Form of Notice of Suspension of Operations |
ERCOT |
Approved |
Aug 25 '11 |
Dec 12 '11 |
| NPRR406 Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level |
ERCOT |
Approved |
Sep 2 '11 |
Dec 12 '11 |
| NPRR426 ! Standing Non-Spin Deployment in the Operating Hour for Generation Resources Providing On-Line Non-Spin |
ERCOT |
Approved |
Nov 9 '11 |
Dec 12 '11 |
| NPRR427 ! Energy Offer Curve Requirements for Generation Resources Assigned Reg-Up and RRS |
ERCOT |
Approved |
Nov 9 '11 |
Dec 12 '11 |
| NPRR428 ! Energy Offer Curve Requirements for Generation Resources Assigned Non-Spin Responsibility |
ERCOT |
Approved |
Nov 9 '11 |
Dec 12 '11 |
| NPRR364 Clarify Active and Inactive SCED Constraint Reporting |
ERCOT |
Approved |
May 4 '11 |
Oct 18 '11 |
| NPRR370 Supplementary Ancillary Services Market Modifications |
Morgan Stanley |
Approved |
May 26 '11 |
Oct 18 '11 |
| NPRR389 Modification of Voltage Support Requirements to Address Existing Non-Exempt WGRs |
ERCOT |
Approved |
Jul 6 '11 |
Oct 18 '11 |
| NPRR391 Shortening RTM Settlement and Payment Timeline and Eliminate ACH as a Mode of Payment |
ERCOT |
Approved |
Jul 5 '11 |
Oct 18 '11 |
| NPRR400 ! Eliminate Unsecured Credit for CRR Auctions and for Future Credit Exposure and Eliminate Netting of FCE with CCE |
ERCOT |
Approved |
Aug 3 '11 |
Oct 18 '11 |
| NPRR321 Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period (formerly "Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period for Qualifying Facilities") |
Calpine |
Approved |
Feb 10 '11 |
Sep 20 '11 |
| NPRR348 Generation Resource Start-Up and Shut-Down process |
ERCOT |
Approved |
Apr 6 '11 |
Sep 20 '11 |
| NPRR354 Revisions to Non-Spin Performance Criteria Language and Provision for ICCP Telemetry of Non-Spin Deployment |
WMS |
Approved |
Apr 15 '11 |
Sep 20 '11 |
| NPRR358 Clarification of Responsible Entity for Binding Obligations |
ERCOT |
Approved |
May 4 '11 |
Sep 20 '11 |
| NPRR360 Summary Report of HDL and LDL |
Jackie Ashbaugh on... |
Approved |
May 4 '11 |
Sep 20 '11 |
| NPRR365 ! Change in Resource Outage Approvals from Eight to 45 Days (formerly "Change in Resource Outage Approvals from Eight to 90 Days") |
ERCOT |
Approved |
May 4 '11 |
Sep 20 '11 |
| NPRR374 Modification of SCR Process and Urgency Requirements |
ERCOT |
Approved |
Jun 6 '11 |
Sep 20 '11 |
| NPRR375 Extend the Reporting Horizon for CDR Inputs |
ERCOT |
Approved |
Jun 6 '11 |
Sep 20 '11 |
| NPRR379 EILS Dispatch Sequence and Performance Criteria Upgrades |
ERCOT |
Approved |
Jun 7 '11 |
Sep 20 '11 |
| NPRR380 Minor Changes to Default Uplift Invoice |
ERCOT |
Approved |
Jun 8 '11 |
Sep 20 '11 |
| NPRR382 Verbal RUC Committed or Decommitted Resources Report |
Jackie Ashbaugh on... |
Approved |
Jun 8 '11 |
Sep 20 '11 |
| NPRR383 Unconfirmed Trades Reports |
Jackie Ashbaugh on... |
Approved |
Jun 8 '11 |
Sep 20 '11 |
| NPRR384 Revisions to Support SCR766 , Load Zone and Hub LMPs Distributed by ICCP (formerly "Load Zone Price Distributed by ICCP") |
ERCOT |
Approved |
Jun 8 '11 |
Sep 20 '11 |
| NPRR396 ! Reduce Standard O&M Costs |
City of Eastland |
Approved |
Jul 19 '11 |
Sep 20 '11 |
| NPRR411 Administrative Changes for the October 1, 2011 Protocols |
ERCOT |
Approved |
Sep 8 '11 |
Sep 8 '11 |
| NPRR299 Remove Requirement for ERCOT Board Approval of PUCT, IMM, and FERC Required Reports |
ERCOT |
Approved |
Nov 30 '10 |
Aug 16 '11 |
| NPRR313 Revisions to the Resource Plan Reference to Current Operating Plan for EILS and Synchronous Condensers and Black Start Notification Requirements (formerly "Updating the Term Resource Plan to Current Operating Plan") |
Luminant Energy Company LLC |
Approved |
Feb 1 '11 |
Aug 16 '11 |
| NPRR347 ! Single Daily Settlement Invoice and Updates to Credit Calculations, including addition of a Minimum Collateral Exposure Component (formerly "Counter-Party Invoice and Single Daily Settlement Invoice") |
ERCOT |
Approved |
Apr 6 '11 |
Aug 16 '11 |
| NPRR355 Adjust the Calculation of the Real-Time Settlement Point Price for a Load Zone |
ERCOT |
Approved |
Apr 27 '11 |
Aug 16 '11 |
| NPRR356 EEA Changes Related to Dispatch Instructions and BLTs |
ERCOT |
Approved |
May 4 '11 |
Aug 16 '11 |
| NPRR357 ! Revisions to Collateral Requirements Concerning CRR Auctions (formerly "Multi-Month CRR Auction and Revisions to Collateral Requirements") |
Luminant |
Approved |
May 4 '11 |
Aug 16 '11 |
| NPRR359 Monthly TDSP Load Report |
Market Information... |
Approved |
May 4 '11 |
Aug 16 '11 |
| NPRR361 Real-Time Wind Power Production Data Transparency |
Jackie Ashbaugh on... |
Approved |
May 4 '11 |
Aug 16 '11 |
| NPRR362 Changes to PRC Calculation |
ERCOT |
Approved |
May 4 '11 |
Aug 16 '11 |
| NPRR369 ! Black Start Service Requirement Revisions |
ERCOT |
Approved |
May 18 '11 |
Aug 16 '11 |
| NPRR388 ! Clarification of Quick Start Generation Resource Performance Criteria |
Luminant Energy |
Approved |
Jul 6 '11 |
Aug 16 '11 |
| NPRR390 ! Clarification of the Applicability of the Use of the Refund Option |
ERCOT |
Approved |
Jul 6 '11 |
Aug 16 '11 |
| NPRR392 ! Credit Review During CRR Auction |
ERCOT |
Approved |
Jul 14 '11 |
Aug 16 '11 |
| NPRR314 Requirement to Post Generation Resources Temporal Constraints |
Luminant Energy Company, LLC |
Approved |
Feb 1 '11 |
Jul 19 '11 |
| NPRR319 Required Documentation to Recover Fuel Costs for RUC Deployments |
ERCOT |
Approved |
Feb 7 '11 |
Jul 19 '11 |
| NPRR324 Conductor/Transformer Transmission Facility Rating |
ERCOT |
Approved |
Feb 10 '11 |
Jul 19 '11 |
| NPRR328 Clarifies Duplicative or Vague Requirements Related to Reactive Resources (formerly "Removes ERCOT Requirement for Reactive Resource Planning and the Associated Compliance Process") |
ERCOT |
Approved |
Feb 23 '11 |
Jul 19 '11 |
| NPRR332 Revise QSGR Processes for COP Reporting of QSGR Assigned Off-Line Non-Spin and Application of Emergency Operations Settlement |
ERCOT |
Approved |
Feb 25 '11 |
Jul 19 '11 |
| NPRR333 Removal of Redundant Reporting Requirement Related to Equipment Ratings |
ERCOT |
Approved |
Feb 25 '11 |
Jul 19 '11 |
| NPRR337 Correct Section Reference in Section 1.3.1.1 Pertaining To Protected Information of DC Ties |
ERCOT |
Approved |
Mar 10 '11 |
Jul 19 '11 |
| NPRR338 Modifications to Support Revenue Neutrality |
ERCOT |
Approved |
Mar 17 '11 |
Jul 19 '11 |
| NPRR344 Define RMR Fuel Adder |
ERCOT |
Approved |
Apr 1 '11 |
Jul 19 '11 |
| NPRR346 Removal of Redundant Posting Requirement Related to Electrical Bus Changes |
ERCOT |
Approved |
Apr 5 '11 |
Jul 19 '11 |
| NPRR376 ! CRR Volume Limitation Enhancements |
DC Energy |
Approved |
Jun 7 '11 |
Jul 19 '11 |
| NPRR387 ! Hydro RRS Deployment Under Frequency Relay Set Point |
LCRA |
Approved |
Jun 15 '11 |
Jul 19 '11 |
| NPRR312 ! Clarification of QSE Requirements for Split Generation Resources |
ERCOT |
Approved |
Feb 1 '11 |
Jul 18 '11 |
| NPRR264 Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection |
WMS |
Approved |
Aug 12 '10 |
Jun 21 '11 |
| NPRR311 Correction of Wind Adjust Formula to Account for Daylight Savings Time |
ERCOT |
Approved |
Feb 1 '11 |
Jun 21 '11 |
| NPRR317 Clarification of Entity Responsible for Hydro Responsive Testing |
ERCOT |
Approved |
Feb 4 '11 |
Jun 21 '11 |
| NPRR318 Alignment of Nodal Registration Requirements with Current Registration Process |
ERCOT |
Approved |
Feb 4 '11 |
Jun 21 '11 |
| NPRR322 ! Real-Time PTP Option Modeling |
Luminant Energy Company LLC |
Approved |
Feb 10 '11 |
Jun 21 '11 |
| NPRR326 Adjust the Calculation of the Real-Time Settlement Point Price for a Resource Node |
ERCOT |
Approved |
Feb 10 '11 |
Jun 21 '11 |
| NPRR330 Change in Frequency of Four Protocol Required Audits from Annual to Periodic (formerly "Change in Frequency of Five Protocol Required Audits from Annual to Periodic") |
ERCOT |
Approved |
Feb 24 '11 |
Jun 21 '11 |
| NPRR372 Administrative Changes for the July 1, 2011 Protocols to Update Audit References |
ERCOT |
Approved |
Jun 1 '11 |
Jun 1 '11 |
| NPRR306 Revisions to Protected Information to Include Black Start Documents Considered CEII |
OWG |
Approved |
Jan 11 '11 |
May 17 '11 |
| NPRR310 Expand Output Schedule Acceptable Range to Include HSL and LSL |
Tenaska |
Approved |
Jan 14 '11 |
May 17 '11 |
| NPRR352 ! Real-Time HSL Telemetry for WGRs |
ERCOT |
Approved |
Apr 13 '11 |
May 17 '11 |
| NPRR350 ! Change to the Security Classification of the System Ancillary Service Capacity Monitor Dashboard |
Jackie Ashbaugh on... |
Approved |
Apr 11 '11 |
May 16 '11 |
| NPRR290 ERCOT Publication of DAM PSS/E Files |
Henry Durrwachter on... |
Approved |
Oct 27 '10 |
Apr 19 '11 |
| NPRR294 Texas SET 4.0 Including: Acquisition and Transfer of Customers From One REP to Another; Meter Tampering Transactional Solution |
Jennifer Frederick... |
Approved |
Nov 5 '10 |
Apr 19 '11 |
| NPRR298 New Definitions Related to Black Start and Clarification to the Hourly Standby Fee Payments for Black Start Resources (formerly "New Definitions Related to Black Start") |
Operations Working... |
Approved |
Nov 29 '10 |
Apr 19 '11 |
| NPRR301 Correct Energy Trade Language for Adjustment Period |
Morgan Stanley |
Approved |
Dec 3 '10 |
Apr 19 '11 |
| NPRR304 Removal of Frequency Bias Methodology Approval Requirement |
ERCOT |
Approved |
Dec 17 '10 |
Apr 19 '11 |
| NPRR316 ! Negative Self-Arranged Ancillary Services Quantity (formerly "Negative Self-Arranged Ancillary Services") |
Morgan Stanley |
Approved |
Feb 2 '11 |
Apr 19 '11 |
| NPRR320 ! Minimum PTP Option Bid and Settlement (formerly "Minimum PTP Option Bids and CRR Auction Fees") |
Bob Wittmeyer |
Approved |
Feb 8 '11 |
Apr 19 '11 |
| NPRR329 ! Security Classification Changes for Extracts/Reports |
MIS User Group |
Approved |
Feb 23 '11 |
Apr 19 '11 |
| NPRR331 ! Addition of the Balance of the Year PCRR Allocation |
ERCOT |
Approved |
Feb 25 '11 |
Apr 19 '11 |
| NPRR335 ! TSP Request for Interval Data |
Jennifer Bevill on... |
Approved |
Mar 1 '11 |
Apr 19 '11 |
| NPRR339 ! Modifications to Heuristic Rules to Determine LMP at De-energized Electrical Bus and Treatment of CRR Offers at De-energized Settlement Points |
ERCOT |
Approved |
Mar 17 '11 |
Apr 19 '11 |
| NPRR341 ! Remove Ancillary Service Offers from SASM that do not Meet the Lead Time |
ERCOT |
Approved |
Mar 23 '11 |
Apr 19 '11 |
| NPRR342 ! Notification and Actions to Address Outcomes Inconsistent With Efficient Operation of the ERCOT Market |
ERCOT |
Approved |
Mar 30 '11 |
Apr 19 '11 |
| NPRR343 ! CRR Bid and PTP Obligation Bid Criteria Change |
ERCOT |
Approved |
Mar 29 '11 |
Apr 19 '11 |
| NPRR353 Administrative Changes for the May 1, 2011 Protocols |
ERCOT |
Approved |
Apr 14 '11 |
Apr 14 '11 |
| NPRR275 Clarify QSE’s Ability to Make Changes to Ancillary Service Resource Responsibility In Real Time |
ERCOT |
Approved |
Sep 16 '10 |
Mar 22 '11 |
| NPRR283 Clarification of PCRR Allocation Eligibility |
Tex-La Electric... |
Approved |
Sep 30 '10 |
Mar 22 '11 |
| NPRR289 Clarify Use of Raise/Lower Block Status Telemetry |
ERCOT |
Approved |
Oct 28 '10 |
Mar 22 '11 |
| NPRR291 Reduce the Comment Period for NPRRs and SCRs |
ERCOT |
Approved |
Oct 28 '10 |
Mar 22 '11 |
| NPRR292 Add Key Provisions of RPG Charter to Protocols |
Planning Working Group (PLWG) |
Approved |
Oct 29 '10 |
Mar 22 '11 |
| NPRR296 Remove Posting Requirement for the Annual Planning Model for the CRR Auction |
ERCOT |
Approved |
Nov 15 '10 |
Mar 22 '11 |
| NPRR297 Add Administrative NPRR Process to Nodal Protocols |
ERCOT |
Approved |
Nov 23 '10 |
Mar 22 '11 |
| NPRR303 ! Requirement to Post PTP Options Cleared in DAM or Taken to Real-Time |
Luminant Energy Company, LLC |
Approved |
Dec 16 '10 |
Mar 22 '11 |
| NPRR305 ! Timeline for Calculating the Value of X |
VCWG |
Approved |
Jan 11 '11 |
Mar 22 '11 |
| NPRR307 ! Change SASM Offer Procedures |
Morgan Stanley |
Approved |
Jan 11 '11 |
Mar 22 '11 |
| NPRR323 ! Correct DAM Credit Exposure Language and Enable Qualified Expiring CRRs to Offset PTP Bid Exposure |
Tenaska Power Services |
Approved |
Feb 10 '11 |
Mar 22 '11 |
| NPRR325 ! Price Correction During SCED Process Failure |
ERCOT |
Approved |
Feb 10 '11 |
Mar 22 '11 |
| NPRR260 Providing Access to MIS Secure Area to MIS Registered Users |
Crescent Power |
Approved |
Aug 5 '10 |
Jan 18 '11 |
| NPRR282 Dynamic Ramp Rates Use in SCED |
Calpine |
Approved |
Sep 28 '10 |
Jan 18 '11 |
| NPRR302 ! Correct Fuel Type Language for Mitigated Offer Cap |
Morgan Stanley |
Approved |
Dec 7 '10 |
Jan 18 '11 |
| NPRR293 ! Requirement to Post PTP Obligation Quantities Awarded in DAM (formerly "Requirement to Post CRR Option and Obligation Quantities Cleared in DAM or Taken to Real Time") |
Luminant Energy Company, LLC |
Approved |
Nov 3 '10 |
Dec 14 '10 |
| NPRR295 ! Synchronization of Protocol for Generation Resource Designation as Mothballed or Decommissioned |
ERCOT |
Approved |
Nov 11 '10 |
Dec 14 '10 |
| NPRR269 Synchronization of PRR830, Reactive Power Capability Requirement |
ERCOT |
Approved |
Sep 9 '10 |
Nov 18 '10 |
| NPRR209 Data Posting Changes to Comply with P.U.C. Subst. R. 25.505 |
Adrian Pieniazek,... |
Approved |
Feb 5 '10 |
Nov 16 '10 |
| NPRR256 Synchronize Nodal Protocols with PRR787, Add Non-Compliance Language to QSE Performance Standards (formerly "Add Violation Language to QSE Performance Standards") |
Luminant |
Approved |
Jul 14 '10 |
Nov 16 '10 |
| NPRR257 Synchronization with Nodal Operating Guide Section 9, Monitoring Programs and Changes to Posting Requirements of Documents Considered CEII (formerly "Synchronization with Nodal Operating Guide Section 9, Monitoring Programs") |
ERCOT |
Approved |
Jul 22 '10 |
Nov 16 '10 |
| NPRR258 Synchronization with PRR824 and PRR833 and Additional Clarifications |
PDCWG |
Approved |
Jul 22 '10 |
Nov 16 '10 |
| NPRR265 MIS Secure Area Posting of Resource Category -- As-Built Clarification |
ERCOT |
Approved |
Aug 31 '10 |
Nov 16 '10 |
| NPRR266 Installed Capacity of Unregistered Distributed Generation (DG) |
CPS Energy |
Approved |
Aug 31 '10 |
Nov 16 '10 |
| NPRR267 Remove All References to Pseudo Devices (formerly "Allow ERCOT to Manage Operations Model Pseudo Devices") |
AEP |
Approved |
Aug 31 '10 |
Nov 16 '10 |
| NPRR268 Posting Requirements of Verifiable Costs Documents |
ERCOT |
Approved |
Sep 1 '10 |
Nov 16 '10 |
| NPRR270 Defining the Variable Used in the Wind Generation Formula |
ERCOT |
Approved |
Sep 13 '10 |
Nov 16 '10 |
| NPRR271 Synchronization to PRR850, Weather Responsiveness Determination for Interval Data Recorders |
ERCOT |
Approved |
Sep 13 '10 |
Nov 16 '10 |
| NPRR272 Definition and Participation of Quick Start Generation Resources |
ERCOT |
Approved |
Sep 15 '10 |
Nov 16 '10 |
| NPRR276 MIS Posting Requirement for the Network Operations Model Load Schedule |
ERCOT |
Approved |
Sep 16 '10 |
Nov 16 '10 |
| NPRR277 Removal of NPRR119 Language for LDL Calculation and Modification to the SCED Ramp Rate Calculation (formerly "Removal of NPRR119 Language for LDL Calculation") |
ERCOT |
Approved |
Sep 16 '10 |
Nov 16 '10 |
| NPRR278 Emergency Interruptible Load Service (EILS) Modifications to Correct Self-Provision Settlement Equations, to Accommodate Advanced Metering Infrastructure, and other Clarifications |
ERCOT |
Approved |
Sep 16 '10 |
Nov 16 '10 |
| NPRR281 Replace 7-Day Forecast Requirement for QSEs Representing WGRs |
AEP Energy Partners |
Approved |
Sep 26 '10 |
Nov 16 '10 |
| NPRR285 Generation Resource Base Point Deviation Charge Corrections |
WMS |
Approved |
Oct 12 '10 |
Nov 16 '10 |
| NPRR286 DAM Credit -- Non-Business Day Processing |
ERCOT |
Approved |
Oct 14 '10 |
Nov 16 '10 |
| NPRR288 Selection of CRR Load Distribution Factors for Use in CRR Monthly and Annual Auctions |
ERCOT |
Approved |
Oct 20 '10 |
Nov 16 '10 |
| NPRR244 Clarification of Other Binding Documents |
Dave Seibert |
Approved |
Jun 2 '10 |
Oct 19 '10 |
| NPRR246 Requirement for Resource Entities to Update Resource Parameters |
Jay Teixeira |
Approved |
Jun 7 '10 |
Oct 19 '10 |
| NPRR253 CRR Balancing Account Invoice and Settlement and Billing Dispute Process |
Art Deller |
Approved |
Jul 14 '10 |
Oct 19 '10 |
| NPRR255 Resolution of Alignment Item A81 - DRUC Timing and Execution when DAM is Delayed or Aborted |
ERCOT |
Approved |
Jul 14 '10 |
Oct 19 '10 |
| NPRR259 Resolution of Alignment Items A175 and A176 - Settlement of Generation Resources Dispatched to Meet System Reliability Requirements |
ERCOT |
Approved |
Jul 27 '10 |
Oct 19 '10 |
| NPRR261 Revision of Data Submission Timeline for Network Model |
ERCOT |
Approved |
Aug 8 '10 |
Oct 19 '10 |
| NPRR262 Protocol Synchronization for Nodal Implementation Surcharge |
ERCOT |
Approved |
Aug 8 '10 |
Oct 19 '10 |
| NPRR263 Resolution of Alignment Item A99 - Settlement Point Price Calculation When Busses are De-energized |
ERCOT |
Approved |
Aug 10 '10 |
Oct 19 '10 |
| NPRR273 Allow Use of the ONTEST Resource Status to Indicate Resource Startup, Shutdown and Test Operations |
ERCOT |
Approved |
Sep 15 '10 |
Oct 19 '10 |
| NPRR274 Generic Startup Costs for Combined Cycle Generation Resources -- Removal of Temporal Constraint |
ERCOT |
Approved |
Sep 15 '10 |
Oct 19 '10 |
| NPRR279 Resolution of Alignment Item A144 - Clarify Posting of MCPC for DAM and SASM |
ERCOT |
Approved |
Sep 15 '10 |
Oct 19 '10 |
| NPRR280 Move Shift Factor Posting Requirement to Real-Time |
ERCOT |
Approved |
Sep 23 '10 |
Oct 19 '10 |
| NPRR284 Cost Allocation Zones as They Relate to NOIE Load Zones -- As Built Systems |
ERCOT |
Approved |
Sep 29 '10 |
Oct 19 '10 |
| NPRR213 Deadlines for Initiating Alternative Dispute Resolution |
Horizon Wind Energy LLC |
Approved |
Feb 25 '10 |
Sep 21 '10 |
| NPRR220 Nodal Requirement of Declaring an EEA for Reserves More than 500 MW |
ERCOT |
Approved |
Mar 23 '10 |
Sep 21 '10 |
| NPRR231 Treatment of RMR Units in the Day-Ahead Market (formerly "Remove RMR Units from the Day-Ahead Market") |
Luminant |
Approved |
May 6 '10 |
Sep 21 '10 |
| NPRR232 Clarification of Block Load Transfer Registration and Deployment |
ERCOT |
Approved |
May 9 '10 |
Sep 21 '10 |
| NPRR238 Resolution of Alignment Item A47, A59, A104, A105, A114, A115, A130, A188, and A189 - Provides Clarification and Updates to Network Operations Model Processes for Resource Entities |
ERCOT |
Approved |
May 12 '10 |
Sep 21 '10 |
| NPRR240 Proxy Energy Offer Curve |
Potomac Economics |
Approved |
May 25 '10 |
Sep 21 '10 |
| NPRR241 Aggregate Incremental Liability (AIL) Calculation and Credit Reports Publish Corrections |
Vanessa Spells,... |
Approved |
May 26 '10 |
Sep 21 '10 |
| NPRR243 Load Resource Disqualification, Unannounced Testing, and Compliance |
WMS |
Approved |
Jun 2 '10 |
Sep 21 '10 |
| NPRR247 Retail Market Testing Updates Due to the Merger of the TX SET and TTPT Working Groups |
Jennifer Frederick... |
Approved |
Jun 20 '10 |
Sep 21 '10 |
| NPRR248 Removal of Loads from NOIE Load Zone (formerly "Removal of Loads from Pre-1999 NOIE Load Zone") |
Kerrville Electric... |
Approved |
Jun 23 '10 |
Sep 21 '10 |
| NPRR249 Resolution of Alignment Item A155 and A159 -- Removal of Text Reason Requirement (formerly "Removal of Text Reason Requirement") |
John Adams |
Approved |
Jul 5 '10 |
Sep 21 '10 |
| NPRR250 Suspension of Annual Profile ID Validation With Advanced Meter Deployment |
Ernie Podraza on... |
Approved |
Jul 6 '10 |
Sep 21 '10 |
| NPRR251 Synchronization of PRR845, Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned |
Terry Bates on... |
Approved |
Jul 7 '10 |
Sep 21 '10 |
| NPRR252 Synchronization of PRR758, Clarification of Language Related to Generation Netting for ERCOT Polled Settlement Meters |
ERCOT |
Approved |
Jul 14 '10 |
Sep 21 '10 |
| NPRR254 Updates to Protocol Sections 14 and 18 |
Sonja B. Mingo |
Approved |
Jul 14 '10 |
Sep 21 '10 |
| NPRR091 Scarcity Pricing and Mitigated Offer Cap During the Period Commencing on the Nodal Market Implementation Date and Continuing for a Total of 45 Days |
TPTF |
Approved |
Dec 5 '07 |
Aug 17 '10 |
| NPRR218 Resolution of Alignment Item A71 - Add Protocol Description of the Power Balance Penalty Factor used in the SCED |
ERCOT |
Approved |
Mar 22 '10 |
Aug 17 '10 |
| NPRR228 Resolution of Alignment Items A2, A80, A83 and A93 - As-Built Treatment and Settlement of Combined Cycle Generation Resources in ERCOT Market Systems |
ERCOT |
Approved |
Apr 22 '10 |
Aug 17 '10 |
| NPRR233 Clarifying Method of Enforcing CRR Auction Limitation on Market Submissions |
ERCOT |
Approved |
May 12 '10 |
Aug 17 '10 |
| NPRR236 Resolution of Alignment Item A83 partially, A86, A87 partially, A88 partially, and A142 - Clarify Default Actions for Missing Data and Range of Valid Data Entries for Energy Offers |
ERCOT |
Approved |
May 12 '10 |
Aug 17 '10 |
| NPRR237 Resolution of Alignment Items A22, A143, A148, A153, A160 and A169 -- Clarification of NERC Reliability Standards and MIS Posting Requirements |
ERCOT |
Approved |
May 12 '10 |
Aug 17 '10 |
| NPRR242 Synchronization of Nodal Protocols with PRR792 |
ERCOT |
Approved |
Jun 1 '10 |
Aug 17 '10 |
| NPRR245 Protocol Synchronization and As-Built Clarification for RUC Shortfall Calculation |
ERCOT |
Approved |
Jun 6 '10 |
Aug 17 '10 |
| NPRR207 Unit Deselection (formerly "Hour Start Unit Deselection and Half Hour Start Unit RUC Clawback") |
Seth Cochran and Tom... |
Approved |
Jan 22 '10 |
Jul 20 '10 |
| NPRR208 Registration and Settlement of Distributed Generation (DG) Less Than One MW |
Don Tucker on behalf... |
Approved |
Jan 25 '10 |
Jul 20 '10 |
| NPRR222 Half-Hour Start Unit RUC Clawback (Companion to NPRR207) |
WMS |
Approved |
Apr 8 '10 |
Jul 20 '10 |
| NPRR224 Remove Dynamic Rating Requirements for Annual Planning Models |
Steady State Working Group |
Approved |
Apr 8 '10 |
Jul 20 '10 |
| NPRR226 Procedure for Setting DAM Credit Requirement Parameters (formerly Procedure for Setting DAM Auction Credit Requirement Parameters) |
ERCOT |
Approved |
Apr 15 '10 |
Jul 20 '10 |
| NPRR227 Termination of Access Privileges to Restricted Computer Systems and Control Systems |
Ann Delenela |
Approved |
Apr 22 '10 |
Jul 20 '10 |
| NPRR229 Additions to Section 2, Definitions and Acronyms |
Sonja B. Mingo |
Approved |
Apr 28 '10 |
Jul 20 '10 |
| NPRR230 Resolution of Alignment Items A40, A108, A127 and A138 and Clarification/Updates to Load and Demand Forecast, Statement of Opportunities, and Long Term Wind Power Forecast |
ERCOT |
Approved |
May 6 '10 |
Jul 20 '10 |
| NPRR235 Resolution of Alignment Items A36 and A131 and Clarification of Miscellaneous Requirements |
ERCOT |
Approved |
May 12 '10 |
Jul 20 '10 |
| NPRR239 Ramp Rate Limitation of 10% per minute of On-Line Installed Capability for Wind-powered Generation Resources |
ERCOT |
Approved |
May 12 '10 |
Jul 20 '10 |
| NPRR146 ICCP Telemetry Information Submittals |
American Electric Power |
Approved |
Jul 30 '08 |
Jun 15 '10 |
| NPRR210 Wind Forecasting Change to P50, Synchronization with PRR841 |
Morgan Stanley |
Approved |
Feb 9 '10 |
Jun 15 '10 |
| NPRR212 Disputing Fuel Oil Price (FOP) Costs |
Kenan Ögelman |
Approved |
Feb 11 '10 |
Jun 15 '10 |
| NPRR217 Resolution of Alignment Item A58 - Use of Different Computational Modules |
ERCOT |
Approved |
Mar 22 '10 |
Jun 15 '10 |
| NPRR221 Day-Ahead Market and Real-Time Market Default Allocation Changes |
MCWG |
Approved |
Mar 29 '10 |
Jun 15 '10 |
| NPRR225 Standard Cost Option in Verifiable Costs |
WMS |
Approved |
Apr 11 '10 |
Jun 15 '10 |
| NPRR223 Resolution of Alignment Item A73 Removal of IMM and PUC Staff Nightly Report |
ERCOT |
Approved |
Apr 8 '10 |
Jun 14 '10 |
| NPRR205 Transmission and/or Distribution Service Provider (TDSP) Definition Revision |
Mike Grable on... |
Approved |
Jan 15 '10 |
May 18 '10 |
| NPRR211 Clarify Capacity Obligations of Energy Trades (formerly "Modify RUC Capacity Short Charge to Use Final Energy Trades") |
J. Aron & Company |
Approved |
Feb 11 '10 |
May 18 '10 |
| NPRR214 Wind-powered Generation Resource (WGR) High Sustained Limit (HSL) Update Process |
Wind Coalition |
Approved |
Mar 12 '10 |
May 18 '10 |
| NPRR156 Transparency for PSS and Full Interconnection Studies |
Marguerite Wagner/PSEG Texas |
Approved |
Sep 18 '08 |
Mar 23 '10 |
| NPRR169 Clarify the Calculation and Posting of LMPs for the Load Zone and LMPs for each Hub |
Joel Mickey on... |
Approved |
Dec 16 '08 |
Mar 23 '10 |
| NPRR198 Load Used in RMR Studies |
PSEG TX |
Approved |
Nov 10 '09 |
Mar 23 '10 |
| NPRR203 Amend Telemetry Bus Accuracy Requirements |
Ebby John on behalf... |
Approved |
Dec 22 '09 |
Mar 23 '10 |
| NPRR204 Update Generic Startup Cost for Reciprocating Engines |
South Texas Electric... |
Approved |
Dec 22 '09 |
Mar 23 '10 |
| NPRR199 Shift Factors by Resource Node |
ERCOT |
Approved |
Nov 20 '09 |
Feb 16 '10 |
| NPRR200 MMS DC Tie Schedule Data Source |
ERCOT |
Approved |
Nov 30 '09 |
Feb 16 '10 |
| NPRR201 Calculation of Transmission and Distribution Losses |
ERCOT |
Approved |
Dec 3 '09 |
Feb 16 '10 |
| NPRR206 Nodal Market Day-Ahead Market Credit Requirements |
Randa Stephenson on... |
Approved |
Jan 20 '10 |
Feb 16 '10 |
| NPRR131 Ancillary Service Trades with ERCOT |
NRG Texas |
Approved |
May 15 '08 |
Jan 19 '10 |
| NPRR164 Resubmitting Ancillary Service Offers in SASM |
Transition Plan Task... |
Approved |
Nov 12 '08 |
Jan 19 '10 |
| NPRR181 FIP Definition Revision |
Luminant Energy Company LLC |
Approved |
Jun 10 '09 |
Jan 19 '10 |
| NPRR194 Synchronization of Zonal Unannounced Generation Capacity Testing Process |
ERCOT |
Approved |
Aug 18 '09 |
Jan 19 '10 |
| NPRR197 Section 21, Synchronization of Zonal Protocols |
ERCOT |
Approved |
Oct 30 '09 |
Jan 19 '10 |
| NPRR202 Clarification of Network Operations Model and State Estimator Postings |
NATF |
Approved |
Dec 10 '09 |
Jan 19 '10 |
| NPRR196 Synchronization of Nodal Protocols with PRR827, Find Transaction and Find ESI ID Functions on the MIS |
ERCOT |
Approved |
Aug 20 '09 |
Dec 15 '09 |
| NPRR174 FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals |
WMS |
Approved |
Apr 14 '09 |
Oct 20 '09 |
| NPRR189 Ancillary Service Deployment Clarification |
ERCOT |
Approved |
Jul 24 '09 |
Oct 20 '09 |
| NPRR191 Synchronization of PRR819, Changes to Support Revisions to the PUCT POLR and Expedited Switch Rules |
Jennifer Frederick... |
Approved |
Jul 30 '09 |
Oct 20 '09 |
| NPRR193 Application of Nodal Implementation Surcharge in Verifiable Costs |
Ino Gonzalez for the... |
Approved |
Aug 17 '09 |
Oct 20 '09 |
| NPRR195 Removal of McCamey Congestion Management from Nodal Protocols |
ERCOT |
Approved |
Aug 18 '09 |
Oct 20 '09 |
| NPRR165 Synchronizing Section 1 with PRR697 |
ERCOT |
Approved |
Nov 18 '08 |
Sep 15 '09 |
| NPRR168 Change the Definition of "Start-up" and Include the Fuel from Breaker Close to LSL in Startup Costs (formerly titled "Verifiable Costs General Corrections") |
Verifiable Cost... |
Approved |
Nov 24 '08 |
Sep 15 '09 |
| NPRR183 Synchronization of PRR790, Load Profile ID Annual Validation Change Request |
Ernie Podraza on... |
Approved |
Jun 22 '09 |
Sep 15 '09 |
| NPRR184 Section 2, Addition of Definitions and Acronyms from Zonal Protocols and Clarifications |
ERCOT |
Approved |
Jun 23 '09 |
Sep 15 '09 |
| NPRR185 Cancellations of RUC-Committed Resources |
Heddie Lookadoo for... |
Approved |
Jul 6 '09 |
Sep 15 '09 |
| NPRR186 Naming Convention Clarification |
Network Data Support... |
Approved |
Jul 9 '09 |
Sep 15 '09 |
| NPRR188 MVA for SCED Input |
Ebby John on behalf... |
Approved |
Jul 10 '09 |
Sep 15 '09 |
| NPRR192 QSE Energy and Ancillary Service Compliance Criteria |
PUCT/TRE/ERCOT |
Approved |
Aug 11 '09 |
Sep 15 '09 |
| NPRR171 Synchronization of PRR805, Adding POLR Customer Class and AMS Meter Flag to the Database Query Function on the MIS |
Jennifer Frederick... |
Approved |
Apr 3 '09 |
Aug 18 '09 |
| NPRR175 Hub Bus List Clarification |
ERCOT |
Approved |
Apr 30 '09 |
Aug 18 '09 |
| NPRR176 Resource Status Input to RUC and Ancillary Service Awards from RUC |
ERCOT |
Approved |
May 7 '09 |
Aug 18 '09 |
| NPRR177 Synchronization of Nodal Protocols with PRR808, Clean-up and Alignment of RECs Trading Program Language with PUCT Rules |
ERCOT |
Approved |
May 15 '09 |
Aug 18 '09 |
| NPRR178 Regulation Reduction (GS-FR3) and Reg-Up/Reg-Down Allocation to QSEs |
ERCOT |
Approved |
May 26 '09 |
Aug 18 '09 |
| NPRR180 Reconciliation of CRR Related Protocol Language |
Steve Reedy |
Approved |
Jun 10 '09 |
Aug 18 '09 |
| NPRR182 Non-Protocol Postings on the Market Information System |
ERCOT |
Approved |
Jun 11 '09 |
Aug 18 '09 |
| NPRR187 Definition for Transmission and/or Distribution Service Provider |
Chad Seely |
Approved |
Jul 10 '09 |
Aug 18 '09 |
| NPRR158 EILS Self-Provision Formula Correction and Clarifications |
ERCOT |
Approved |
Sep 23 '08 |
Jul 21 '09 |
| NPRR170 Synchronization of PRR806, Re-Registration of Market Participant due to Mass Transition of ESI IDs |
Jennifer Frederick... |
Approved |
Apr 1 '09 |
Jul 21 '09 |
| NPRR141 TSP Energy Storage for Reliability (formerly "TSP and/or DSP Energy Storage for Reliability") |
American Electric... |
Approved |
Jul 21 '08 |
Jun 16 '09 |
| NPRR172 Synchronization of Section 15 with PRR782, Clean-up and Corrections to Terminology and Transaction Timings in Protocol Section 15, Customer Registration |
Jennifer Frederick... |
Approved |
Apr 3 '09 |
Jun 16 '09 |
| NPRR173 Reduce the Minimum Quantity for Ancillary Service Offers |
Mary Anne Brelinsky,... |
Approved |
Apr 8 '09 |
Jun 16 '09 |
| NPRR157 Extending Black Start Service Bid Timeline |
John Dumas on behalf... |
Approved |
Sep 23 '08 |
May 20 '09 |
| NPRR163 Removal of Late Fee Language |
Keely Hilton |
Approved |
Nov 11 '08 |
May 20 '09 |
| NPRR166 Timing for Required Black Start Unit Load Carrying Test |
ERCOT |
Approved |
Nov 20 '08 |
May 20 '09 |
| NPRR167 Options for Filing Verifiable Costs -- QSEs or Resources |
Verifiable Cost... |
Approved |
Nov 24 '08 |
May 19 '09 |
| NPRR149 Change the name of Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA) |
ERCOT |
Approved |
Aug 22 '08 |
Apr 22 '09 |
| NPRR135 Deletion of UFE Analysis Zone Language |
ERCOT |
Approved |
Jun 20 '08 |
Mar 17 '09 |
| NPRR161 Clarification of Establishing Decision-Making Authority of Managed Capacity |
ERCOT |
Approved |
Oct 16 '08 |
Mar 17 '09 |
| NPRR140 Revision to CRR Obligation Margin Adder |
J. Aron |
Approved |
Jul 14 '08 |
Jan 20 '09 |
| NPRR142 EECP Media Appeal Change |
John Jonte on behalf... |
Approved |
Jul 22 '08 |
Jan 20 '09 |
| NPRR152 References to Section 22 Attachments |
ERCOT |
Approved |
Sep 10 '08 |
Jan 20 '09 |
| NPRR154 Corrections of Entities Able to Bid for Point-To-Point Obligations in the Day-Ahead Market |
Rachelle Zani on... |
Approved |
Sep 15 '08 |
Jan 20 '09 |
| NPRR155 Clarification of Authorized Representative |
ERCOT |
Approved |
Sep 18 '08 |
Jan 20 '09 |
| NPRR159 Resource Category Startup Offer Generic Cap for Wind Resources |
Heddie Lookadoo on... |
Approved |
Oct 3 '08 |
Jan 20 '09 |
| NPRR160 Elimination of the Non-ERCOT LSE Fee |
Barry Smith w/ AEP |
Approved |
Oct 8 '08 |
Jan 20 '09 |
| NPRR162 Change the Sign Convention of Net Real Power Consumption, LPC and MPC of Load Resources (formerly titled "Change the Sign Convention for Load Resources") |
Kenneth Ragsdale |
Approved |
Nov 6 '08 |
Jan 20 '09 |
| NPRR145 PPAs as Resource-Specific Verifiable Costs Documentation |
Ino González on... |
Approved |
Jul 25 '08 |
Nov 18 '08 |
| NPRR128 Combined Cycle Power Blocks with Multiple Voltage Interconnections |
Calpine |
Approved |
Apr 25 '08 |
Nov 17 '08 |
| NPRR134 Section 7 Cleanup |
Joel Mickey on... |
Approved |
Jun 5 '08 |
Nov 17 '08 |
| NPRR136 Interim Solution for 15-Minute Settlement of Advanced Meters |
AEP Texas |
Approved |
Jun 20 '08 |
Nov 17 '08 |
| NPRR138 Credit Monitoring and Management Reports |
Credit Working Group |
Approved |
Jul 11 '08 |
Nov 17 '08 |
| NPRR139 ACL, EAL, FCE Calculation Updates |
Credit Working Group |
Approved |
Jul 11 '08 |
Nov 17 '08 |
| NPRR143 Section 9.9.1, Invoice Recipient Payment to ERCOT for the CRR Auction, Clean-up |
ERCOT |
Approved |
Jul 25 '08 |
Nov 17 '08 |
| NPRR148 Treatment of Financial Information as Confidential |
Clayton Greer on... |
Approved |
Aug 15 '08 |
Nov 17 '08 |
| NPRR150 Responsive Reserve Service Offer Floor |
DSWG on behalf of WMS |
Approved |
Aug 28 '08 |
Nov 17 '08 |
| NPRR102 Implementation of PUC Subst. R. 25.505(f), Publication of Resource and Load Information |
TPTF |
Approved |
Feb 12 '08 |
Oct 21 '08 |
| NPRR113 Load Resource Type Indicator for Ancillary Service (AS) Trades and Self-Arranged AS |
ERCOT Staff |
Approved |
Mar 11 '08 |
Oct 21 '08 |
| NPRR124 Resource Node Updated Definitions |
ERCOT Staff |
Approved |
Apr 10 '08 |
Oct 21 '08 |
| NPRR129 Section 15, Synchronization of Zonal Protocols |
ERCOT |
Approved |
May 1 '08 |
Oct 21 '08 |
| NPRR144 Five RUC Deployments Needed Before Requiring Verifiable Costs |
Heddie Lookadoo on... |
Approved |
Jul 25 '08 |
Oct 21 '08 |
| NPRR126 Section 19, Synchronization of Zonal Protocols |
ERCOT |
Approved |
Apr 14 '08 |
Sep 16 '08 |
| NPRR097 Changes to Section 8 to Incorporate Role of TRE, the IMM, and the Concept of Market Compliance |
TPTF |
Approved |
Jan 8 '08 |
Aug 19 '08 |
| NPRR114 Section 11, Synchronization of Zonal Protocols |
Giriraj Sharma, ERCOT |
Approved |
Mar 14 '08 |
Aug 19 '08 |
| NPRR127 Section 22 Attachments A, I, J & M, Synchronization of Zonal Protocols |
ERCOT |
Approved |
Apr 23 '08 |
Aug 19 '08 |
| NPRR132 Outage Clarification |
ERCOT Staff |
Approved |
May 16 '08 |
Aug 19 '08 |
| NPRR133 Addtion of PSSE Format |
ERCOT Staff |
Approved |
May 16 '08 |
Aug 19 '08 |
| NPRR107 Nodal Emergency Interruptible Load Service (EILS) |
ERCOT Staff |
Approved |
Feb 29 '08 |
Jul 15 '08 |
| NPRR111 Timelines for Response by ERCOT to TSP Requests |
Woody Rickerson, ERCOT |
Approved |
Mar 4 '08 |
Jul 15 '08 |
| NPRR112 Emergency Base Point Price Revision |
ERCOT Staff |
Approved |
Mar 3 '08 |
Jul 15 '08 |
| NPRR117 Resource Registration Clarification |
ERCOT |
Approved |
Mar 26 '08 |
Jul 15 '08 |
| NPRR118 Section 14, Synchronization of Zonal Protocols |
Giriraj Sharma, ERCOT |
Approved |
Mar 27 '08 |
Jul 15 '08 |
| NPRR119 Resource Limit Calculator |
ERCOT Staff |
Approved |
Mar 27 '08 |
Jul 15 '08 |
| NPRR120 Corrections and Clarifications for Real Time Settlements |
ERCOT Staff |
Approved |
Mar 27 '08 |
Jul 15 '08 |
| NPRR122 Simplify Ancillary Services Settlement Formulas |
ERCOT Staff |
Approved |
Apr 7 '08 |
Jul 15 '08 |
| NPRR123 Inadvertent Energy Account Revision |
ERCOT Staff |
Approved |
Apr 9 '08 |
Jul 15 '08 |
| NPRR130 CRR Settlements Revenue Equalization |
TPTF |
Approved |
May 9 '08 |
Jul 15 '08 |
| NPRR105 Section 23, Synchronization of Zonal Protocols |
ERCOT |
Approved |
Feb 26 '08 |
Jun 17 '08 |
| NPRR106 Section 24, Synchronization of Zonal Protocols |
ERCOT |
Approved |
Feb 26 '08 |
Jun 17 '08 |
| NPRR109 Section 18, Synchronization of Zonal Protocols |
Giriraj Sharma, ERCOT |
Approved |
Mar 3 '08 |
Jun 17 '08 |
| NPRR110 Section 20, Synchronization of Zonal Protocols |
ERCOT Staff |
Approved |
Mar 3 '08 |
Jun 17 '08 |
| NPRR108 Fuel Oil Price (FOP) Clarification |
ERCOT Staff |
Approved |
Mar 3 '08 |
May 20 '08 |
| NPRR092 Remove Voltage Schedules Requirement |
John Adams, ERCOT |
Approved |
Dec 14 '07 |
Apr 15 '08 |
| NPRR099 RMR Incentive Factor Payment |
Trip Doggett on... |
Approved |
Jan 9 '08 |
Apr 15 '08 |
| NPRR100 PCRR Release Mechanism |
Trip Doggett on... |
Approved |
Jan 14 '08 |
Apr 15 '08 |
| NPRR101 Modify Time Requirements for Entry of Equipment in the Outage Scheduler |
Trip Doggett on... |
Approved |
Feb 6 '08 |
Apr 15 '08 |
| NPRR103 Settlement of Power Imported via DC Ties and Block Load Transfer Under a Declared Emergency Condition |
TPTF |
Approved |
Feb 13 '08 |
Apr 15 '08 |
| NPRR081 Automatic Voltage Regulator (AVR) Status |
ERCOT Staff |
Approved |
Aug 31 '07 |
Mar 18 '08 |
| NPRR089 Changing Posting Requirement of Certain Documents From MIS Secure to Public Area |
ERCOT Staff |
Approved |
Nov 7 '07 |
Mar 18 '08 |
| NPRR094 Correct Reference to CRR Credit Limit |
Trip Doggett on... |
Approved |
Jan 2 '08 |
Mar 18 '08 |
| NPRR095 Clarify Recipients of MCFRIs |
Trip Doggett on... |
Approved |
Jan 2 '08 |
Mar 18 '08 |
| NPRR096 Revisions to the RMR Startup Energy Payment |
ERCOT Staff |
Approved |
Jan 7 '08 |
Mar 18 '08 |
| NPRR098 Protocol Sections 4 and 6 Formula Clarifications and Related Revisions |
TPTF |
Approved |
Jan 9 '08 |
Mar 18 '08 |
| NPRR084 Creating Amendment to Standard Form Market Participant Agreement |
ERCOT Staff |
Approved |
Oct 23 '07 |
Feb 19 '08 |
| NPRR085 Revision of Digital Certificate Procedures |
ERCOT Staff |
Approved |
Oct 24 '07 |
Feb 19 '08 |
| NPRR088 Revision to 16.11.5, Monitoring of a Counter-Party’s Creditworthiness and Credit Exposure by ERCOT |
Reliant Energy |
Approved |
Oct 31 '07 |
Feb 19 '08 |
| NPRR090 Corrections of FIP-FOP in Energy Offers |
TPTF |
Approved |
Dec 5 '07 |
Feb 19 '08 |
| NPRR078 Simplifying the Dispute Process |
Settlements & Data... |
Approved |
Aug 13 '07 |
Jan 15 '08 |
| NPRR086 Settlement Clarifications to RUC Capacity Shortfall Ratio Share Formula |
TPTF |
Approved |
Oct 25 '07 |
Jan 15 '08 |
| NPRR087 Market Monitor Terminology Change |
ERCOT Staff |
Approved |
Oct 30 '07 |
Jan 15 '08 |
| NPRR076 Synchronization of Emergency Electric Curtailment Plan (EECP) Event Realignment |
TPTF |
Approved |
Jul 2 '07 |
Dec 11 '07 |
| NPRR077 Incorporating the ERCOT Internal Audit Department and Other Clarifications |
ERCOT Staff |
Approved |
Aug 7 '07 |
Dec 11 '07 |
| NPRR082 Section 8, Performance Monitoring and Compliance, Revisions to Monitoring and Qualification Tests |
TPTF |
Approved |
Sep 11 '07 |
Dec 11 '07 |
| NPRR083 Remove Real-Time Energy Charge for a BLT from List of Real-Time Charge Types |
ERCOT Staff |
Approved |
Oct 11 '07 |
Dec 11 '07 |
| NPRR045 Wind Power Forecasting |
The Wind Coalition |
Approved |
Feb 23 '07 |
Oct 16 '07 |
| NPRR080 Revised Wording of Protocol Section 3.1.5.1 |
CenterPoint Energy |
Approved |
Aug 16 '07 |
Oct 16 '07 |
| NPRR002 Section 3, Zonal PRR Synchronization and ERCOT Staff Clarifications |
TPTF |
Approved |
May 19 '06 |
Jul 17 '07 |
| NPRR005 Section 7 ERCOT Staff and TPTF Clarifications |
TPTF |
Approved |
May 30 '06 |
Jul 17 '07 |
| NPRR006 Section 4 ERCOT Staff Clarifications |
TPTF |
Approved |
Jun 12 '06 |
Jul 17 '07 |
| NPRR008 PRR 307 Inclusion in Nodal |
Occidental Chemical... |
Approved |
Jul 17 '06 |
Jul 17 '07 |
| NPRR009 Section 6 PRR Synchronization and ERCOT Staff Clarifications |
Trip Doggett on... |
Approved |
Jul 17 '06 |
Jul 17 '07 |
| NPRR012 CRR Granularity in CRR Auction |
Beth Garza on behalf... |
Approved |
Aug 9 '06 |
Jul 17 '07 |
| NPRR014 Zonal PRR Synchronization for Section 16 |
TPTF |
Approved |
Aug 9 '06 |
Jul 17 '07 |
| NPRR016 TPTF Cleanup Items for Sections 2, 3, and 16 |
TPTF |
Approved |
Aug 9 '06 |
Jul 17 '07 |
| NPRR020 ERCOT Nodal Implementation Surcharge |
ERCOT Staff |
Approved |
Aug 28 '06 |
Jul 17 '07 |
| NPRR024 Synchronization of PRRs 627 and 640 |
TPTF |
Approved |
Sep 12 '06 |
Jul 17 '07 |
| NPRR026 Nodal Implementation Surcharge Verifiable Costs |
NRG Texas |
Approved |
Sep 14 '06 |
Jul 17 '07 |
| NPRR033 Settlement of CRRs When DAM Does Not Execute |
TPTF |
Approved |
Oct 12 '06 |
Jul 17 '07 |
| NPRR035 Nodal Protocol Clarifications Required For Net Metering Provisions |
TPTF |
Approved |
Nov 6 '06 |
Jul 17 '07 |
| NPRR036 Market Operations Test Environment (MOTE) in the Nodal Market |
Network Data Support... |
Approved |
Nov 9 '06 |
Jul 17 '07 |
| NPRR037 Conforming Section 13 to Nodal Format and Changing Frequency of Transmission Loss Base Case Calculations |
Unaccounted For... |
Approved |
Nov 20 '06 |
Jul 17 '07 |
| NPRR039 Availability of Ancillary Service Offers for the Supplementary Ancillary Service Market |
TPTF |
Approved |
Feb 14 '07 |
Jul 17 '07 |
| NPRR041 Corrections to Section 4, Day-Ahead Operations |
TPTF |
Approved |
Feb 19 '07 |
Jul 17 '07 |
| NPRR042 Corrections to Section 5, Transmission Security Analysis and Reliability Unit Commitment |
TPTF |
Approved |
Feb 19 '07 |
Jul 17 '07 |
| NPRR043 Corrections to Section 7, Congestion Revenue Rights |
TPTF |
Approved |
Feb 21 '07 |
Jul 17 '07 |
| NPRR044 Corrections to Section 6, Adjustment Period and Real-Time Operations |
TPTF |
Approved |
Feb 22 '07 |
Jul 17 '07 |
| NPRR047 Credit Monitoring -- ERCOT Staff Clarifications |
TPTF |
Approved |
Mar 2 '07 |
Jul 17 '07 |
| NPRR048 Revised Wording of Opportunity Outages for Transmission Facilities |
Trip Doggett on... |
Approved |
Mar 8 '07 |
Jul 17 '07 |
| NPRR049 Generation Subsystem Changes to Incorporate Approved Whitepapers |
Trip Doggett on... |
Approved |
Mar 8 '07 |
Jul 17 '07 |
| NPRR050 Clarifications for HSL Values for WGRs and WGR Values to be Used in the RUC Capacity Short Calculation |
Trip Doggett on... |
Approved |
Mar 12 '07 |
Jul 17 '07 |
| NPRR051 Removal of the Pseudo Resource Requirement in the Real Time Security Constrained Economic Dispatch (SCED) Process |
Trip Doggett on... |
Approved |
Mar 12 '07 |
Jul 17 '07 |
| NPRR052 Settlement for Non-Modeled Generators |
TPTF |
Approved |
Mar 12 '07 |
Jul 17 '07 |
| NPRR055 Correction of Voltage Support QSE Total Bill Determinants |
Transition Plan Task... |
Approved |
Mar 27 '07 |
Jul 17 '07 |
| NPRR057 Posting Requirements Pursuant PUC Subst. R. 25.505 |
TPTF |
Approved |
Apr 9 '07 |
Jul 17 '07 |
| NPRR058 Clarification of Standard Form Market Participant Agreement |
TPTF |
Approved |
Apr 10 '07 |
Jul 17 '07 |
| NPRR059 Reconfiguring the Annual CRR Auction |
Trip Doggett on... |
Approved |
May 1 '07 |
Jul 17 '07 |
| NPRR060 Hub Clarification |
Trip Doggett on... |
Approved |
May 1 '07 |
Jul 17 '07 |
| NPRR061 Scarcity Pricing Mechanism |
TPTF |
Approved |
May 2 '07 |
Jul 17 '07 |
| NPRR062 Constraint Competitiveness Test |
Trip Doggett on... |
Approved |
May 18 '07 |
Jul 17 '07 |
| NPRR063 Electrical Bus Clarification |
TPTF |
Approved |
May 24 '07 |
Jul 17 '07 |
| NPRR064 Modeling of Generic Transmission Constraints |
Trip Doggett on... |
Approved |
May 29 '07 |
Jul 17 '07 |
| NPRR065 Synchronization of PRR647, Gross and Net MW/Mvar Data Reporting |
TPTF |
Approved |
Jun 4 '07 |
Jul 17 '07 |
| NPRR066 Synchronization of PRR698, Remove Default QSE Provisions |
TPTF |
Approved |
Jun 13 '07 |
Jul 17 '07 |
| NPRR067 Modeling of Private Use Networks |
Trip Doggett on... |
Approved |
Jun 15 '07 |
Jul 17 '07 |
| NPRR068 Settlement Clarifications to Startup Eligibility, Decommitment Payments and Corrections to RUC Formulas |
ERCOT Staff |
Approved |
Jun 15 '07 |
Jul 17 '07 |
| NPRR069 Changes to SURAMP |
ERCOT Staff |
Approved |
Jun 15 '07 |
Jul 17 '07 |
| NPRR070 Changes to DAM Clearing Start Time Allocation of McCamey Flowgate Rights in Day-Ahead Market |
ERCOT |
Approved |
Jun 18 '07 |
Jul 17 '07 |
| NPRR071 Trade Validation by Matching Identical Trade Submissions |
ERCOT Staff |
Approved |
Jun 18 '07 |
Jul 17 '07 |
| NPRR072 Day-Ahead RMR Settlement Clarifications |
ERCOT Staff |
Approved |
Jun 18 '07 |
Jul 17 '07 |
| NPRR073 Update of Sections 6.6 and 6.7 Due Requirements, Use Cases and CSDs |
ERCOT Staff |
Approved |
Jun 19 '07 |
Jul 17 '07 |
| NPRR075 Section-9, Settlements Clean-up |
Jeyant Tamby, ERCOT |
Approved |
Jun 20 '07 |
Jul 17 '07 |
| NPRR001 Section 1, Zonal PRR Synchronization and ERCOT Staff Clarifications |
TPTF |
Approved |
May 19 '06 |
Jun 28 '07 |
| NPRR003 Section 5, Zonal PRR Synchronization and ERCOT Staff Clarifications |
TPTF |
Approved |
May 19 '06 |
Jun 28 '07 |
| NPRR004 Section 8, Zonal PRR Synchronization and ERCOT Staff Clarifications |
TPTF |
Approved |
May 19 '06 |
Jun 28 '07 |
| NPRR007 Section 9 Zonal PRR Synchronization and ERCOT Staff Clarifications |
TPTF |
Approved |
Jun 12 '06 |
Jun 28 '07 |
| NPRR010 Synchronization of PRR630 and Section 3, Management Activities for the ERCOT System |
Trip Doggett on... |
Approved |
Jul 17 '06 |
Jun 28 '07 |
| NPRR011 Revision to Credit Requirements |
Credit Working Group |
Approved |
Aug 1 '06 |
Jun 28 '07 |
| NPRR013 Section 2, Zonal PRR Synchronization and ERCOT Staff Clarifications |
TPTF |
Approved |
Aug 9 '06 |
Jun 28 '07 |
| NPRR015 Zonal PRR Synchronization Section 22 Attachment H |
TPTF |
Approved |
Aug 9 '06 |
Jun 28 '07 |
| NPRR017 Discontinuation of Interest Charge for Defaulting Entities at Time of Uplift |
TXU Energy |
Approved |
Aug 10 '06 |
Jun 28 '07 |
| NPRR019 Black Start Testing Requirements |
Black Start Task Force |
Approved |
Aug 23 '06 |
Jun 28 '07 |
| NPRR022 MIS Posting for Area Trades |
ERCOT |
Approved |
Sep 5 '06 |
Jun 28 '07 |
| NPRR023 Correction to Formatting of Section 8.1.2.2.1 |
ERCOT Staff |
Approved |
Sep 6 '06 |
Jun 28 '07 |
| NPRR025 Definition of Annual Planning Model |
TPTF |
Approved |
Sep 13 '06 |
Jun 28 '07 |
| NPRR027 Block Offers in CRR Auction |
ERCOT Staff |
Approved |
Sep 14 '06 |
Jun 28 '07 |
| NPRR028 CRR Trading in Blocks Only |
ERCOT Staff |
Approved |
Sep 14 '06 |
Jun 28 '07 |
| NPRR029 Network Model Testing Clarification |
ERCOT Staff |
Approved |
Sep 15 '06 |
Jun 28 '07 |
| NPRR030 Addition to CRR Account Holder Qualification Criteria |
ERCOT Staff |
Approved |
Sep 15 '06 |
Jun 28 '07 |
| NPRR031 Correction of Voltage Support Bill Determinants |
TPTF |
Approved |
Oct 13 '06 |
Jun 28 '07 |
| NPRR032 Correction of Black Start Bill Determinants |
TPTF |
Approved |
Oct 13 '06 |
Jun 28 '07 |
| NPRR034 Conforming Section 10 to Nodal Format |
ERCOT Staff |
Approved |
Oct 27 '06 |
Jun 28 '07 |
| NPRR038 Synchronization of PRR624 |
TPTF |
Approved |
Dec 6 '06 |
Jun 28 '07 |
| NPRR046 Real-Time ICCP Communications Only |
ERCOT |
Approved |
Feb 27 '07 |
Jun 28 '07 |
| NPRR054 Update of Nodal Protocols to Comply with NERC Name Change – Companion to PRR711 |
ERCOT |
Approved |
Mar 14 '07 |
Jun 28 '07 |