NPRR #764 · Revision Request
NPRR764 QSE Capacity Short Calculations Based on an 80% Probability of Exceedance (P80)
- PRS May 12 '16
- TAC May 26 '16
- BOARD Jun 14 '16
- PUCT —
ReasonMarket efficiencies/enhancements
Created2016-04-14
Approved2016-06-14
Sections Affected
5.7.4 and 5.7.4.1.1
Summary
This Nodal Protocol Revision Request (NPRR) proposes to base Reliability Unit Commitment (RUC) capacity short calculations on the Wind-Powered Generation Resource Production Potential (WGRPP) for a Wind-powered Generation Resource (WGR) and the PhotoVoltaic Generation Resource Production Potential (PVGRPP) for a PhotoVoltaic Generation Resource (PVGR)–i.e., an 80% probability of exceedance (P80). Under the current Protocols, RUC capacity short calculations are based on the Short Term Wind Power Forecast (STWPF) and the Short-Term PhotoVoltaic Power Forecast (STPPF)—i.e., a 50% probability of exceedance (P50)—pursuant to language introduced by NPRR210, Wind Forecasting Change to P50, Synchronization with PRR841, and NPRR615, PVGR Forecasting. Although NPRR210 directs ERCOT to utilize the WGRPP (P80) in RUC capacity short calculations, there was a missed impact given that the P80 forecast is currently not available in the Market Management System (MMS) but instead resides in the Energy Management System (EMS). Only the STWPF and STPPF, which are used as inputs into the Day-Ahead RUC (DRUC) and Hourly RUC (HRUC), are available in MMS.
Timeline
- Mar 30
-
Apr 14
PRS PRS MeetingPRSRecommended for Approval“To recommend approval of NPRR764 as revised by PRS” — Passed→ PRS for Impact Analysis review
- Apr 20
-
May 12
PRS PRS MeetingPRSRecommended for Approval Forwarded → TAC priority 2016 · rank 1365“To endorse and forward to TAC the 4/14/16 PRS Report as revised by PRS and the Impact Analysis for NPRR764 with a recommended priority of 2016 and rank of 1365” — Passed→ TAC for consideration
-
May 26
TAC TAC MeetingTACRecommended for Approval“To recommend approval of NPRR764 as recommended by PRS in the 5/12/16 PRS Report” — Passed→ Board for consideration
-
Jun 14
BOARD Board of Directors MeetingBOARDApproved“To approve NPRR764 as recommended by TAC in the 5/26/16 TAC Report.” — Passed
-
—
Posted since the last meeting