NPRR #764 · Revision Request
NPRR764 QSE Capacity Short Calculations Based on an 80% Probability of Exceedance (P80)
ReasonMarket efficiencies/enhancements
Created2016-04-14
Approved2016-06-14
Sections Affected
5.7.4 and 5.7.4.1.1
Summary
This Nodal Protocol Revision Request (NPRR) proposes to base Reliability Unit Commitment (RUC) capacity short calculations on the Wind-Powered Generation Resource Production Potential (WGRPP) for a Wind-powered Generation Resource (WGR) and the PhotoVoltaic Generation Resource Production Potential (PVGRPP) for a PhotoVoltaic Generation Resource (PVGR)–i.e., an 80% probability of exceedance (P80). Under the current Protocols, RUC capacity short calculations are based on the Short Term Wind Power Forecast (STWPF) and the Short-Term PhotoVoltaic Power Forecast (STPPF)—i.e., a 50% probability of exceedance (P50)—pursuant to language introduced by NPRR210, Wind Forecasting Change to P50, Synchronization with PRR841, and NPRR615, PVGR Forecasting. Although NPRR210 directs ERCOT to utilize the WGRPP (P80) in RUC capacity short calculations, there was a missed impact given that the P80 forecast is currently not available in the Market Management System (MMS) but instead resides in the Energy Management System (EMS). Only the STWPF and STPPF, which are used as inputs into the Day-Ahead RUC (DRUC) and Hourly RUC (HRUC), are available in MMS.
Action Log 4 milestones
-
Apr 14
PRSRecommended for Approval→ PRS for Impact Analysis review
-
May 12
PRSRecommended for Approval→ TAC for consideration
-
May 26
TACRecommended for Approval→ Board for consideration
-
Jun 14
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Apr 14 '16 | PRS | To recommend approval of NPRR764 as revised by PRS | Passed |
| May 12 '16 | PRS | To endorse and forward to TAC the 4/14/16 PRS Report as revised by PRS and the Impact Analysis for NPRR764 with a recommended priority of 2016 and rank of 1365 | Passed |
Documents 6
| Name | Type | Posted | Classification |
|---|---|---|---|
| 764NPRR-01 QSE Capacity Short Calculations Based on 80% Probability of Exceedance (P80) 033016 | doc | Mar 30 '16 | Revision Request |
| 764NPRR-02 Impact Analysis 033016 | doc | Mar 30 '16 | Staff Report |
| 764NPRR-03 PRS Report 041416 | doc | Apr 19 '16 | Committee Report |
| 764NPRR-04 PRS Report 051216 | doc | May 16 '16 | Committee Report |
| 764NPRR-05 TAC Report 052616 | doc | May 31 '16 | Committee Report |
| 764NPRR-06 Board Report 061416 | doc | Jun 15 '16 | Committee Report |
Meetings That Took It Up 5
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Jun 14 '16 | Board of Directors Meeting | BOARD | Concluded |
| May 26 '16 | TAC Meeting | TAC | Concluded |
| May 12 '16 | PRS Meeting | PRS | Concluded |
| Apr 20 '16 | CWG/MCWG Meeting | CREDITWG | Concluded |
| Apr 14 '16 | PRS Meeting | PRS | Concluded |