NPRR #957 · Revision Request
NPRR957 RTF-4 Definition of Energy Storage Resource and Related Registration and Telemetry Requirements
ReasonAddresses current operational issues. Market efficiencies or enhancements.
Created2019-08-15
Approved2019-12-10
Sections Affected
2.12.23.83.8.6 (new)6.5.5.2and 16.5
Summary
This Nodal Protocol Revision Request (NPRR):establishes the terms “Energy Storage System” (ESS) and “Energy Storage Resource” (ESR), with ESS serving as an “umbrella term” for storage assets in general, and ESR corresponding to ESSs that are eligible to participate in Security-Constrained Economic Dispatch (SCED) and/or provide Ancillary Services; adds new Section 3.8.6 to clarify that the Resource Entity and Qualified Scheduling Entity (QSE) representing an ESR are responsible for following all requirements associated with Generation Resources and Controllable Load Resources. Under this process, an ESR must be registered with ERCOT as both a Generation Resource and a Controllable Load Resource; adds new paragraph (12) to Section 6.5.5.2 to specify telemetry requirements unique to ESRs; and adds new paragraph (6) to Section 16.5 to provide greater transparency of ERCOT’s current practice of requiring a Resource Entity to register an ESR as both a Generation Resource and a Controllable Load Resource. ERCOT expects that this dual-registration requirement may be superseded by future requirements and system changes that facilitate participation by an ESR as a single asset.
Action Log 6 milestones
-
Aug 15
PRSDeferred/Tabled→ PRS for consideration
-
Sep 12
PRSRecommended for Approval→ PRS for Impact Analysis consideration
-
Oct 10
PRSRecommended for Approval→ TAC for consideration
-
Oct 23
TACDeferred/Tabled→ TAC for consideration
-
Nov 20
TACRecommended for Approval→ Board for consideration
-
Dec 10
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Sep 12 '19 | PRS | To recommend approval of NPRR957 as amended by the 9/5/19 ERCOT comments | Passed |
Documents 11
| Name | Type | Posted | Classification |
|---|---|---|---|
| 957NPRR-01 RTF-4 Create Definition and Terms for Energy Storage 071619 | doc | Jul 16 '19 | Revision Request |
| 957NPRR-02 Longhorn Power Comments 080219 | doc | Aug 2 '19 | Revision Request Comments |
| 957NPRR-03 ERCOT Comments 081419 | doc | Aug 14 '19 | Revision Request Comments |
| 957NPRR-04 PRS Report 081519 | doc | Aug 20 '19 | Committee Report |
| 957NPRR-05 ERCOT Comments 090519 | doc | Sep 5 '19 | Revision Request Comments |
| 957NPRR-06 PRS Report 091219 | doc | Sep 17 '19 | Committee Report |
| 957NPRR-07 Impact Analysis 100819 | doc | Oct 8 '19 | Staff Report |
| 957NPRR-08 PRS Report 101019 | doc | Oct 14 '19 | Committee Report |
| 957NPRR-09 TAC Report 102319 | doc | Oct 29 '19 | Committee Report |
| 957NPRR-10 TAC Report 112019 | doc | Nov 21 '19 | Committee Report |
| 957NPRR-11 Board Report 121019 | doc | Dec 11 '19 | Committee Report |
Meetings That Took It Up 8
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Dec 10 '19 | Board of Directors Meeting | BOARD | Concluded |
| Nov 20 '19 | TAC Meeting | TAC | Concluded |
| Nov 6 '19 | WMS Meeting | WMS | Concluded |
| Oct 23 '19 | TAC Meeting | TAC | Concluded |
| Oct 10 '19 | PRS Meeting | PRS | Concluded |
| Sep 24 '19 | MSWG Meeting | MSWG | Concluded |
| Sep 12 '19 | PRS Meeting | PRS | Concluded |
| Aug 15 '19 | PRS Meeting | PRS | Concluded |