NPRR355  Adjust the Calculation of the Real-Time Settlement Point Price for a Load Zone

Approved sponsor ERCOT posted 2011-04-27 ercot.com
ReasonThe two equations using the RTSPP and RTSPPEW prices are the Real-Time Energy Imbalance Amount (RTEIAMT) at a Load Zone and Block Load Transfer Resource Amount (BLTRAMT). The proposed adjustments will ensure that for 15 minute Settlement Intervals in which there is no congestion (i.e. within each SCED interval all the LMPs are the same at all electrical buses) there will be no difference in the Load Zone, Resource Node and Hub 15 minute prices.
Created2011-05-19
Approved2011-08-16
Sections Affected
6.6.1.26.6.3.16.6.3.26.6.3.36.6.3.5
Summary
This Nodal Protocol Revision Request (NPRR) removes the energy-weighting in the current calculation for the Real-Time Settlement Point Price (RTSPP) for a Load Zone. It also adds a new RTSPP for a Load Zone that is energy-weighted (Real-Time Settlement Point Price Energy-Weighted (RTSPPEW)) and adjusts the appropriate formulas that use these prices. This NPRR also corrects the Real-Time Price for the Energy Metered for each Resource meter at bus (RTRMPR b) in the event that the Energy at bus near Real-Time (EBNRT) is less than or equal to zero. This NPRR also includes several minor, non-substantive corrections.
Action Log 4 milestones
Documents 10
NameTypePostedClassification
355NPRR-01 Adjust the Calculation of the Real-Time Settlement Po doc Apr 27 '11 Revision Request
355NPRR-02 Preliminary Impact Analysis 042711 doc Apr 27 '11 Staff Report
355NPRR-03 WMS Comments 051211 doc May 12 '11 Revision Request Comments
355NPRR-04 PRS Report 051911 doc May 23 '11 Committee Report
355NPRR-05 Impact Analysis 061711 doc Jun 17 '11 Staff Report
355NPRR-06 Cost Benefit Analysis 062211 xls Jun 22 '11 Staff Report
355NPRR-07 PRS Report 062311 doc Jun 27 '11 Committee Report
355NPRR-08 TAC Report 070711 doc Jul 7 '11 Committee Report
355NPRR-09 Revised Impact Analysis 070811 doc Jul 8 '11 Staff Report
355NPRR-10 Board Report 081611 doc Aug 16 '11 Committee Report
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Feb 15 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Sep 22 '11 COPS Communication Working Group (CCWG) Meeting CCWG Concluded
Aug 16 '11 Board of Directors Meeting BOARD Concluded
Jul 7 '11 TAC Meeting TAC Concluded
Jun 23 '11 PRS Meeting PRS Concluded
May 19 '11 PRS Meeting PRS Concluded
May 11 '11 WMS Meeting WMS Concluded