NPRR428  Energy Offer Curve Requirements for Generation Resources Assigned Non-Spin Responsibility

Approved Urgent sponsor ERCOT posted 2011-11-09 ercot.com
ReasonTo address the Commission’s discussion raised at the October 27, 2011 Public Utility Commission of Texas (PUCT) Open Meeting regarding Project No. 37897, PUC Proceeding Relating to Resource and Reserve Adequacy and Shortage Pricing.
Created2011-11-17
Approved2011-12-12
Sections Affected
6.4.3.1
Summary
This Nodal Protocol Revision Request (NPRR) adds a requirement for the Energy Offer Curve to be at or above $120 for On-Line Non-Spinning Reserve (Non-Spin) capacity and at or above $180 for Off-Line Non-Spin capacity. If Non-Spin Ancillary Service Resource Responsibility is reassigned to a Generation Resource during the Adjustment Period in accordance with Section 6.4.6, QSE-Requested Decommitment of Resources and Changes to Ancillary Service Resource Responsibility of Resources, the Qualified Scheduling Entity (QSE) shall submit an Energy Offer Curve that meets the requirements of Section 6.4.3.1 for the Generation Resource newly assigned Ancillary Service Resource Responsibility for Non-Spin prior to the end of the Adjustment Period. If the Ancillary Service Resource Responsibility for Non-Spin is reassigned in accordance with Section 6.4.6 from a Generation Resource that experiences a Forced Outage, Derate, or Startup Loading Failure during the Operating Period, the QSE shall submit an Energy Offer Curve that meets the requirements of Section 6.4.3.1 as soon as reasonably practicable after the event. QSE updates to an Energy Offer Curve entered at the end of the Adjustment Period become effective in ERCOT systems at the next Operating Period. Therefore, if Non-Spin is moved from one Generation Resource to another in the QSE's portfolio during an Operating Hour, any change to the Energy Offer Curve will be effective in the next Operating Period. There will not be any validation rules to verify the requirements added by this NPRR. The onus is on all QSEs to make the submission/telemetry changes needed to implement these new requirements.
Action Log 3 milestones
Amendments
DateBodyMotionResult
Nov 17 '11PRS To recommend approval of NPRR428 as revised by PRS; an effective date of January 5, 2012; and to forward NPRR428 to TACPassed
Dec 1 '11TAC To recommend approval of NPRR428 as recommended by PRS in the 11/17/11 PRS Report, as amended by the 11/29/11 ERCOT comments and as revised by TACPassed
Documents 8
NameTypePostedClassification
428NPRR-01 Energy Offer Curve Requirements for Generation Resour doc Nov 9 '11 Revision Request
428NPRR-02 Impact Analysis 110911 doc Nov 9 '11 Staff Report
428NPRR-03 Austin Energy Comments 111611 doc Nov 16 '11 Revision Request Comments
428NPRR-04 PRS Report 111711 doc Nov 21 '11 Committee Report
428NPRR-05 ERCOT Comments 112911 doc Nov 29 '11 Revision Request Comments
428NPRR-06 STEC Comments 113011 doc Nov 30 '11 Revision Request Comments
428NPRR-07 TAC Report 120111 doc Dec 2 '11 Committee Report
428NPRR-08 Board Report 121211 doc Dec 12 '11 Committee Report
Meetings That Took It Up 3
DateMeetingCommitteeStatus
Dec 12 '11 Board of Directors Meeting BOARD Concluded
Dec 1 '11 TAC Meeting TAC Concluded
Nov 17 '11 PRS Meeting PRS Concluded