NPRR #406 · Revision Request

NPRR406  Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level

Approved sponsor ERCOT posted 2011-09-02 ercot.com
ReasonNPRR305, Timeline for Calculating the Value of X, revised paragraph (a) of Section 5.6.1.1 to clarify that the effective date for the value of X is described in the Verifiable Cost Manual. However, similar changes to paragraph (2) of Section 5.6.1.2 were unintentionally omitted. This NPRR ensures consistency between these two provisions.
Created2011-09-22
Approved2011-12-12
Sections Affected
5.6.1.2
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that the effective date for the value of X as applied to fuel at the minimum energy level is described in the Verifiable Cost Manual. This clarification is consistent with paragraph (a) of Section 5.6.1.1, Verifiable Startup Costs, which also contains language that references the Verifiable Cost Manual for the effective date of the value of X.
Action Log 4 milestones
Documents 6
NameTypePostedClassification
406NPRR-01 Clarification of the Timeline for Calculating the Val doc Sep 2 '11 Revision Request
406NPRR-02 Impact Analysis 090211 doc Sep 2 '11 Staff Report
406NPRR-03 PRS Report 092211 doc Sep 26 '11 Committee Report
406NPRR-04 PRS Report 102011 doc Oct 24 '11 Committee Report
406NPRR-05 TAC Report 110311 doc Nov 3 '11 Committee Report
406NPRR-06 Board Report 121211 doc Dec 12 '11 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Dec 12 '11 Board of Directors Meeting BOARD Concluded
Nov 3 '11 TAC Meeting TAC Concluded
Oct 20 '11 PRS Meeting PRS Concluded
Sep 22 '11 PRS Meeting PRS Concluded