NPRR #406 · Revision Request
NPRR406 Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level
ReasonNPRR305, Timeline for Calculating the Value of X, revised paragraph (a) of Section 5.6.1.1 to clarify that the effective date for the value of X is described in the Verifiable Cost Manual. However, similar changes to paragraph (2) of Section 5.6.1.2 were unintentionally omitted. This NPRR ensures consistency between these two provisions.
Created2011-09-22
Approved2011-12-12
Sections Affected
5.6.1.2
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that the effective date for the value of X as applied to fuel at the minimum energy level is described in the Verifiable Cost Manual. This clarification is consistent with paragraph (a) of Section 5.6.1.1, Verifiable Startup Costs, which also contains language that references the Verifiable Cost Manual for the effective date of the value of X.
Action Log 4 milestones
-
Sep 22
PRSRecommended for Approval→ PRS Impact Analysis review
-
Oct 20
PRSRecommended for Approval→ TAC consideration of NPRR406
-
Nov 3
TACRecommended for Approval→ ERCOT Board consideration of NPRR406
-
Dec 12
BOARDApproved
Documents 6
| Name | Type | Posted | Classification |
|---|---|---|---|
| 406NPRR-01 Clarification of the Timeline for Calculating the Val | doc | Sep 2 '11 | Revision Request |
| 406NPRR-02 Impact Analysis 090211 | doc | Sep 2 '11 | Staff Report |
| 406NPRR-03 PRS Report 092211 | doc | Sep 26 '11 | Committee Report |
| 406NPRR-04 PRS Report 102011 | doc | Oct 24 '11 | Committee Report |
| 406NPRR-05 TAC Report 110311 | doc | Nov 3 '11 | Committee Report |
| 406NPRR-06 Board Report 121211 | doc | Dec 12 '11 | Committee Report |
Meetings That Took It Up 4
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Dec 12 '11 | Board of Directors Meeting | BOARD | Concluded |
| Nov 3 '11 | TAC Meeting | TAC | Concluded |
| Oct 20 '11 | PRS Meeting | PRS | Concluded |
| Sep 22 '11 | PRS Meeting | PRS | Concluded |