NPRR282  Dynamic Ramp Rates Use in SCED

Approved sponsor Calpine posted 2010-09-28 ercot.com
ReasonMarket trials demonstrate that plants are Dispatched at levels that are unachievable during the five-minute SCED intervals. These situations occur when SCED uses a declared static ramp rate for an output level that does not apply over the output range implicated by the new telemetered Base Point.
Created2010-10-21
Approved2011-01-18
Sections Affected
2.16.5.7.1.126.5.7.2
Summary
This Nodal Protocol Revision Request (NPRR) proposes revisions that are intended to result in more reasonable Dispatch of Generation Resources when a telemetered Base Point requires the Resource to employ technologies that in turn change the Resource’s ramp rate. For example, when Security-Constrained Economic Dispatch (SCED) generates a new Base Point for a unit that is currently at baseload, SCED uses a static ramp rate found in the Resource Parameters database that does not accurately reflect the dynamic ramp rate that the unit can deliver as it leaves baseload status (ten MW/min. for some units) and goes into duct burners (one MW/min. for some units) or through duct burners into other technologies such as certain forms of power augmentation. Instead of using the declared static ramp rates at designated output levels, SCED should use a dynamic ramp rate that can be telemetered by the Qualified Scheduling Entity (QSE) to ERCOT using the Inter-Control Center Communications Protocol (ICCP) database with an update rate of two or four seconds, which will better match the unit’s ramp rate capability during the SCED execution. The up and down ranges of this telemetered dynamic ramp rate are best defined by ERCOT based on its experience in the Nodal Market trials and its view of the SCED Base Point outcomes and its analysis of the Generation Resource Energy Deployment Performance (GREDP) scores and Regulation Service deployed.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Oct 21 '10PRS To recommend approval of NPRR282 as amended by the 10/18/10 Luminant Energy Company LLC comments.Passed
Documents 15
NameTypePostedClassification
282NPRR-01 Dynamic Ramp Rates Use in SCED 092810 doc Sep 28 '10 Revision Request
282NPRR-02 CEO Revision Request Review 092810 doc Sep 28 '10 Committee Report
282NPRR-03 Luminant Energy Company LLC Comments 101810 doc Oct 18 '10 Revision Request Comments
282NPRR-04 ERCOT Comments 102010 doc Oct 20 '10 Revision Request Comments
282NPRR-05 PRS Report 102110 doc Oct 26 '10 Committee Report
282NPRR-06 Impact Analysis 111110 doc Nov 11 '10 Staff Report
282NPRR-07 PRS Report 111810 doc Nov 22 '10 Committee Report
282NPRR-08 TAC Report 120610 doc Dec 7 '10 Committee Report
282NPRR-09 Board Report 011811 doc Jan 18 '11 Committee Report
282NPRR-10 Revised Impact Analysis 021011 doc Feb 10 '11 Staff Report
282NPRR-11 Cost Benefit Analysis 021011 xls Feb 10 '11 Staff Report
282NPRR-12 PRS Report - Impact Assessment 021711 doc Feb 22 '11 Committee Report
282NPRR-13 Revised Impact Analysis 022411 doc Feb 24 '11 Staff Report
282NPRR-14 TAC Report - Impact Assessment 030311 doc Mar 4 '11 Committee Report
282NPRR-15 Board Report - Impact Assessment 032211 doc Mar 25 '11 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Jun 15 '11 WMS Meeting WMS Concluded
Mar 3 '11 TAC Meeting TAC Concluded
Feb 17 '11 PRS Meeting PRS Concluded
Dec 6 '10 TAC Meeting TAC Concluded
Nov 18 '10 PRS Meeting PRS Concluded
Oct 21 '10 PRS Meeting PRS Concluded