NPRR #968 · Revision Request
NPRR968 Revise EEA Level 3 Triggers from 1375 MW to 1430 MW to Align with New Most Severe Single Contingency Value
ReasonRegulatory requirements
Created2019-09-12
Approved2019-12-10
Sections Affected
6.5.9.4.2
Summary
This Nodal Protocol Revision Request (NPRR) updates Protocol language for compliance with North American Electric Reliability Corporation (NERC) Reliability Standards BAL-002-3, Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event, and EOP-011-1, Emergency Operations. The proposed language changes the Physical Responsive Capability (PRC) trigger for Energy Emergency Alert (EEA) Level 3 to match a new Most Severe Single Contingency (MSSC) of 1,430 MW, which ERCOT intends to implement on January 1, 2020. ERCOT is updating the MSSC value from the former value of 1,375 MW to more accurately reflect the expected impact of the loss of either of the South Texas Project nuclear generating units, based on additional data ERCOT has obtained. Attachment 1 of EOP-011-1 requires ERCOT to declare an EEA Level 3 if it is unable to maintain PRC above its minimum contingency reserve requirement, which is defined in Requirement R2 of BAL-002-3 to be the MSSC. ERCOT will modify its Operating Procedures and processes following the approval of this NPRR.
Action Log 4 milestones
-
Sep 12
PRSRecommended for Approval→ Impact Analysis Consideration
-
Oct 10
PRSRecommended for Approval→ Revision Request Consideration
-
Oct 23
TACRecommended for Approval→ Revision Request Consideration
-
Dec 10
BOARDApproved
Documents 6
| Name | Type | Posted | Classification |
|---|---|---|---|
| 968NPRR-01 Revise EEA Level 3 Triggers from 1375 MW to 1430 MW to Align with New Most Severe Single Contingency Value 082819 | doc | Aug 28 '19 | Revision Request |
| 968NPRR-02 Impact Analysis 082819 | doc | Aug 28 '19 | Staff Report |
| 968NPRR-03 PRS Report 091219 | doc | Sep 17 '19 | Committee Report |
| 968NPRR-04 PRS Report 101019 | doc | Oct 11 '19 | Committee Report |
| 968NPRR-05 TAC Report 102319 | doc | Oct 25 '19 | Committee Report |
| 968NPRR-06 Board Report 121019 | doc | Dec 11 '19 | Committee Report |
Meetings That Took It Up 4
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Dec 10 '19 | Board of Directors Meeting | BOARD | Concluded |
| Oct 23 '19 | TAC Meeting | TAC | Concluded |
| Oct 10 '19 | PRS Meeting | PRS | Concluded |
| Sep 12 '19 | PRS Meeting | PRS | Concluded |