NPRR968  Revise EEA Level 3 Triggers from 1375 MW to 1430 MW to Align with New Most Severe Single Contingency Value

Approved sponsor ERCOT posted 2019-08-28 ercot.com
ReasonRegulatory requirements
Created2019-09-12
Approved2019-12-10
Sections Affected
6.5.9.4.2
Summary
This Nodal Protocol Revision Request (NPRR) updates Protocol language for compliance with North American Electric Reliability Corporation (NERC) Reliability Standards BAL-002-3, Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event, and EOP-011-1, Emergency Operations. The proposed language changes the Physical Responsive Capability (PRC) trigger for Energy Emergency Alert (EEA) Level 3 to match a new Most Severe Single Contingency (MSSC) of 1,430 MW, which ERCOT intends to implement on January 1, 2020. ERCOT is updating the MSSC value from the former value of 1,375 MW to more accurately reflect the expected impact of the loss of either of the South Texas Project nuclear generating units, based on additional data ERCOT has obtained. Attachment 1 of EOP-011-1 requires ERCOT to declare an EEA Level 3 if it is unable to maintain PRC above its minimum contingency reserve requirement, which is defined in Requirement R2 of BAL-002-3 to be the MSSC. ERCOT will modify its Operating Procedures and processes following the approval of this NPRR.
Action Log 4 milestones
Documents 6
NameTypePostedClassification
968NPRR-01 Revise EEA Level 3 Triggers from 1375 MW to 1430 MW to Align with New Most Severe Single Contingency Value 082819 doc Aug 28 '19 Revision Request
968NPRR-02 Impact Analysis 082819 doc Aug 28 '19 Staff Report
968NPRR-03 PRS Report 091219 doc Sep 17 '19 Committee Report
968NPRR-04 PRS Report 101019 doc Oct 11 '19 Committee Report
968NPRR-05 TAC Report 102319 doc Oct 25 '19 Committee Report
968NPRR-06 Board Report 121019 doc Dec 11 '19 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Dec 10 '19 Board of Directors Meeting BOARD Concluded
Oct 23 '19 TAC Meeting TAC Concluded
Oct 10 '19 PRS Meeting PRS Concluded
Sep 12 '19 PRS Meeting PRS Concluded