ERCOT·WATCH Search ercot.com  ⌕
NPRR #621 · Revision Request

NPRR621  Counter-Party Specific Calculations for M1 Variable

Approved sponsor ERCOT posted 2014-04-30 ercot.com
ReasonThe existing Protocol methodology for computing Mass Transition risk does not reflect the market risk profile. The time required for Mass Transition will differ greatly depending on the number of Electric Service Identifiers (ESI IDs) held by a Counter-Party. In addition, Counter-Parties with neither Load nor Generation will not have transition risk.
Created2014-05-15
Approved2014-08-12
Sections Affected
16.11.4.116.11.4.3
Summary
This Nodal Protocol Revision Request (NPRR) replaces the fixed value for M1 with a calculation that will be specific to each Counter-Party. This revision defines M1 as the minimum of the existing value of 20 and the sum of two components: · M1a -- Time period required to cover any termination event · M1b -- Time period to cover Mass Transitions onlyThe M1a component is applicable to all Counter-Parties. However, the M1b component will be applicable only to Counter-Parties with Load or generation.
Action Log 4 milestones
Amendments
DateBodyMotionResult
May 15 '14PRS To recommend approval of NPRR621 as revised by PRS.Passed
Aug 12 '14BOARD To approve NPRR621 as recommended by TAC in the 6/26/14 TAC Report and as amended by the 7/23/14 ERCOT comments.Passed
Documents 10
NameTypePostedClassification
621NPRR-01 Counter-Party Specific Calculations for M1 Variable 0 doc Apr 30 '14 Revision Request
621NPRR-02 Impact Analysis 043014 doc Apr 30 '14 Staff Report
621NPRR-03 PRS Report 051514 doc May 19 '14 Committee Report
621NPRR-04 CWG Comments 052714 doc May 27 '14 Revision Request Comments
621NPRR-05 Revised Impact Analysis 060914 doc Jun 9 '14 Staff Report
621NPRR-06 PRS Report 061114 doc Jun 13 '14 Committee Report
621NPRR-07 TAC Report 062614 doc Jun 30 '14 Committee Report
621NPRR-08 ERCOT Comments 072314 doc Jul 23 '14 Revision Request Comments
621NPRR-09 TAC Comments 073114 doc Jul 31 '14 Revision Request Comments
621NPRR-10 Board Report 081214 doc Aug 13 '14 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Aug 12 '14 Board of Directors Meeting BOARD Concluded
Jul 31 '14 TAC Meeting TAC Concluded
Jun 26 '14 TAC Meeting TAC Concluded
Jun 11 '14 PRS Meeting PRS Concluded
May 22 '14 Joint CWG/MCWG Meeting CREDITWG Concluded
May 15 '14 PRS Meeting PRS Concluded