NPRR1315 Changes to Process of Evaluating the Potential Needs for Additional Capacity and Mitigated Offer Cap
ReasonGeneral system and/or process improvement(s)
Created2026-01-14
Approved2026-07-09
Sections Affected
4.4.9.4.16.5.1.1
Summary
This Nodal Protocol Revision Request (NPRR) adds notification requirements for ERCOT to follow when ERCOT has determined that additional capacity is needed to prevent an imminent Emergency Condition or to restore the ERCOT Transmission Grid to a secure state in the event of an ERCOT Transmission Grid Emergency Condition. Under the revisions, ERCOT would notify PUCT when it has made such a determination and would also notify the PUCT prior to entering into any contract for additional capacity. To address additional capacity that is needed to address local constraint issues, this NPRR also extends the study horizon for evaluating and potentially contracting for capacity to prevent anticipated Load shed events. ERCOT proposes this study horizon extend up to two years instead of just the current or next Season. This NPRR specifies that ERCOT shall present its study assumptions (including Load forecast assumptions) to the ERCOT Board of Directors before any awards are made through the “Request for Proposal” (RFP) process. This NPRR also expands the set of eligible Resources that can respond to the RFPs to include new Resources and not be limited to existing Resources. Additionally, these revisions explain that an eligible Resource could be a Resource that is already planned to be interconnected and that, in such a case, if ERCOT is paying for an acceleration of such a Resource to interconnect, ERCOT must be provided with a detailed explanation that demonstrates that any payments to accelerate planned capacity is justifiable and reasonable, and that the acceleration would not have occurred otherwise. Additionally, this NPRR provides language that specifies contract length limit considerations for contracts to address local constraint issues. This NPRR also proposes edits to provide more information on the expected Settlement for Resources that were not previously mothballed, retired, or decommissioned. Finally, this NPRR modifies Section 4.4.9.4.1 and revises the Mitigated Offer Cap (MOC) calculation for those same Resources procured through Section 6.5.1.1. This approach sets the MOC curve so Security-Constrained Economic Dispatch (SCED) can dispatch contracted Resources if needed, with offers priced to ensure these Resources are dispatched after Resources in the market. The calculation factors in Shadow Price caps for relevant transmission constraints and system topology variations, targeting contracted Resource dispatch only after Resources in the market.
Action Log 5 milestones
-
Jan 14
PRSDeferred/Tabled→ Language Consideration
-
May 6
PRSRecommended for Approval→ Revision Request Consideration
-
May 13
TACRecommended for Approval→ Revision Request Consideration
-
Jun 2
BOARDRecommended for Approval→ Revision Request Consideration
-
Jul 9
PUCTApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| May 6 '26 | PRS | to grant NPRR1315 Urgent status; to recommend approval of NPRR1315 as amended by the 5/5/26 ERCOT comments as revised by PRS; and to forward to TAC NPRR1315 and the 12/19/25 Impact Analysis | Passed |
| May 13 '26 | TAC | to recommend approval of NPRR1315 as recommended by PRS in the 5/6/26 PRS Report as revised by TAC and the 5/12/26 Revised Impact Analysis with a recommended effective date of the day after PUCT approval | Passed |
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| May 13 '26 | TAC | Motion Passes | 24 | 1 | 5 | xls |
| May 6 '26 | PRS | Motion Carries | 6.5 | 0.5 | 4 | xls |
| Jan 14 '26 | PRS | Motion Carries | 7 | 0 | 0 | xls |
Documents 24
| Name | Type | Posted | Classification |
|---|---|---|---|
| 1315NPRR-01 Changes to Process of Evaluating the Potential Needs for Additional Capacity 121925 | docx | Dec 19 '25 | Revision Request |
| 1315NPRR-02 Impact Analysis 121925 | docx | Dec 19 '25 | Staff Report |
| 1315NPRR-03 PRS Ballot 011426 | xls | Jan 20 '26 | Revision Request Ballot |
| 1315NPRR-04 PRS Report 011426 | docx | Jan 20 '26 | Committee Report |
| 1315NPRR-05 ERCOT Comments 022526 | docx | Feb 25 '26 | Revision Request Comments |
| 1315NPRR-06 ERCOT Comments 030926 | docx | Mar 9 '26 | Revision Request Comments |
| 1315NPRR-07 Vistra Comments 032426 | docx | Mar 24 '26 | Revision Request Comments |
| 1315NPRR-08 IMM Comments 032426 | docx | Mar 24 '26 | Revision Request Comments |
| 1315NPRR-09 Tesla Comments 032426 | docx | Mar 24 '26 | Revision Request Comments |
| 1315NPRR-10 LCRA Comments 033126 | doc | Mar 31 '26 | Revision Request Comments |
| 1315NPRR-11 ERCOT Comments 040726 | docx | Apr 7 '26 | Revision Request Comments |
| 1315NPRR-12 WMS Leadership Comments 041326 | doc | Apr 13 '26 | Revision Request Comments |
| 1315NPRR-13 HEN Comments 041426 | doc | Apr 14 '26 | Revision Request Comments |
| 1315NPRR-14 ERCOT Comments 043026 | doc | May 1 '26 | Revision Request Comments |
| 1315NPRR-15 Invenergy Comments 050126 | doc | May 1 '26 | Revision Request Comments |
| 1315NPRR-16 ERCOT Comments 050526 | docx | May 5 '26 | Revision Request Comments |
| 1315NPRR-17 Vistra Comments 050526 | docx | May 5 '26 | Revision Request Comments |
| 1315NPRR-18 PRS Ballot 050626 | xls | May 7 '26 | Revision Request Ballot |
| 1315NPRR-19 PRS Report 050626 | docx | May 7 '26 | Committee Report |
| 1315NPRR-20 Revised Impact Analysis 051226 | docx | May 12 '26 | Staff Report |
| 1315NPRR-21 TAC Ballot 051326 | xls | May 18 '26 | Revision Request Ballot |
| 1315NPRR-22 TAC Report 051326 | docx | May 18 '26 | Committee Report |
| 1315NPRR-23 Board Report 060226 | docx | Jun 4 '26 | Committee Report |
| 1315NPRR-24 PUCT Report 070926 | docx | Jul 13 '26 | Committee Report |
Meetings That Took It Up 14
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Jun 1 '26 | Board of Directors Meeting | BOARD | Concluded |
| May 13 '26 | Special TAC Meeting | TAC | Concluded |
| May 8 '26 | WMS Meeting | WMS | Concluded |
| May 6 '26 | PRS Meeting | PRS | Concluded |
| Apr 29 '26 | TAC Meeting | TAC | Concluded |
| Apr 22 '26 | Special PRS Meeting | PRS | Concluded |
| Apr 15 '26 | PRS Meeting | PRS | Concluded |
| Apr 1 '26 | WMS Meeting | WMS | Concluded |
| Mar 27 '26 | NPRR1315 WMS Workshop | Concluded | |
| Mar 25 '26 | TAC Meeting | TAC | Concluded |
| Mar 11 '26 | PRS Meeting | PRS | Concluded |
| Mar 4 '26 | WMS Meeting | WMS | Concluded |
| Feb 11 '26 | PRS Meeting | PRS | Concluded |
| Jan 14 '26 | PRS Meeting | PRS | Concluded |