ERCOT·WATCH Search ercot.com  ⌕
NPRR #1315 · Revision Request

NPRR1315  Changes to Process of Evaluating the Potential Needs for Additional Capacity and Mitigated Offer Cap

Approved Urgent sponsor ERCOT posted 2025-12-19 ercot.com
ReasonGeneral system and/or process improvement(s)
Created2026-01-14
Approved2026-07-09
Sections Affected
4.4.9.4.16.5.1.1
Summary
This Nodal Protocol Revision Request (NPRR) adds notification requirements for ERCOT to follow when ERCOT has determined that additional capacity is needed to prevent an imminent Emergency Condition or to restore the ERCOT Transmission Grid to a secure state in the event of an ERCOT Transmission Grid Emergency Condition. Under the revisions, ERCOT would notify PUCT when it has made such a determination and would also notify the PUCT prior to entering into any contract for additional capacity. To address additional capacity that is needed to address local constraint issues, this NPRR also extends the study horizon for evaluating and potentially contracting for capacity to prevent anticipated Load shed events. ERCOT proposes this study horizon extend up to two years instead of just the current or next Season. This NPRR specifies that ERCOT shall present its study assumptions (including Load forecast assumptions) to the ERCOT Board of Directors before any awards are made through the “Request for Proposal” (RFP) process. This NPRR also expands the set of eligible Resources that can respond to the RFPs to include new Resources and not be limited to existing Resources. Additionally, these revisions explain that an eligible Resource could be a Resource that is already planned to be interconnected and that, in such a case, if ERCOT is paying for an acceleration of such a Resource to interconnect, ERCOT must be provided with a detailed explanation that demonstrates that any payments to accelerate planned capacity is justifiable and reasonable, and that the acceleration would not have occurred otherwise. Additionally, this NPRR provides language that specifies contract length limit considerations for contracts to address local constraint issues. This NPRR also proposes edits to provide more information on the expected Settlement for Resources that were not previously mothballed, retired, or decommissioned. Finally, this NPRR modifies Section 4.4.9.4.1 and revises the Mitigated Offer Cap (MOC) calculation for those same Resources procured through Section 6.5.1.1. This approach sets the MOC curve so Security-Constrained Economic Dispatch (SCED) can dispatch contracted Resources if needed, with offers priced to ensure these Resources are dispatched after Resources in the market. The calculation factors in Shadow Price caps for relevant transmission constraints and system topology variations, targeting contracted Resource dispatch only after Resources in the market.
Action Log 5 milestones
Amendments
DateBodyMotionResult
May 6 '26PRS to grant NPRR1315 Urgent status; to recommend approval of NPRR1315 as amended by the 5/5/26 ERCOT comments as revised by PRS; and to forward to TAC NPRR1315 and the 12/19/25 Impact AnalysisPassed
May 13 '26TAC to recommend approval of NPRR1315 as recommended by PRS in the 5/6/26 PRS Report as revised by TAC and the 5/12/26 Revised Impact Analysis with a recommended effective date of the day after PUCT approvalPassed
Ballots
DateBodyResultYesNoAbstain
May 13 '26 TAC Motion Passes 24 1 5 xls
May 6 '26 PRS Motion Carries 6.5 0.5 4 xls
Jan 14 '26 PRS Motion Carries 7 0 0 xls
Documents 24
NameTypePostedClassification
1315NPRR-01 Changes to Process of Evaluating the Potential Needs for Additional Capacity 121925 docx Dec 19 '25 Revision Request
1315NPRR-02 Impact Analysis 121925 docx Dec 19 '25 Staff Report
1315NPRR-03 PRS Ballot 011426 xls Jan 20 '26 Revision Request Ballot
1315NPRR-04 PRS Report 011426 docx Jan 20 '26 Committee Report
1315NPRR-05 ERCOT Comments 022526 docx Feb 25 '26 Revision Request Comments
1315NPRR-06 ERCOT Comments 030926 docx Mar 9 '26 Revision Request Comments
1315NPRR-07 Vistra Comments 032426 docx Mar 24 '26 Revision Request Comments
1315NPRR-08 IMM Comments 032426 docx Mar 24 '26 Revision Request Comments
1315NPRR-09 Tesla Comments 032426 docx Mar 24 '26 Revision Request Comments
1315NPRR-10 LCRA Comments 033126 doc Mar 31 '26 Revision Request Comments
1315NPRR-11 ERCOT Comments 040726 docx Apr 7 '26 Revision Request Comments
1315NPRR-12 WMS Leadership Comments 041326 doc Apr 13 '26 Revision Request Comments
1315NPRR-13 HEN Comments 041426 doc Apr 14 '26 Revision Request Comments
1315NPRR-14 ERCOT Comments 043026 doc May 1 '26 Revision Request Comments
1315NPRR-15 Invenergy Comments 050126 doc May 1 '26 Revision Request Comments
1315NPRR-16 ERCOT Comments 050526 docx May 5 '26 Revision Request Comments
1315NPRR-17 Vistra Comments 050526 docx May 5 '26 Revision Request Comments
1315NPRR-18 PRS Ballot 050626 xls May 7 '26 Revision Request Ballot
1315NPRR-19 PRS Report 050626 docx May 7 '26 Committee Report
1315NPRR-20 Revised Impact Analysis 051226 docx May 12 '26 Staff Report
1315NPRR-21 TAC Ballot 051326 xls May 18 '26 Revision Request Ballot
1315NPRR-22 TAC Report 051326 docx May 18 '26 Committee Report
1315NPRR-23 Board Report 060226 docx Jun 4 '26 Committee Report
1315NPRR-24 PUCT Report 070926 docx Jul 13 '26 Committee Report
Meetings That Took It Up 14
DateMeetingCommitteeStatus
Jun 1 '26 Board of Directors Meeting BOARD Concluded
May 13 '26 Special TAC Meeting TAC Concluded
May 8 '26 WMS Meeting WMS Concluded
May 6 '26 PRS Meeting PRS Concluded
Apr 29 '26 TAC Meeting TAC Concluded
Apr 22 '26 Special PRS Meeting PRS Concluded
Apr 15 '26 PRS Meeting PRS Concluded
Apr 1 '26 WMS Meeting WMS Concluded
Mar 27 '26 NPRR1315 WMS Workshop Concluded
Mar 25 '26 TAC Meeting TAC Concluded
Mar 11 '26 PRS Meeting PRS Concluded
Mar 4 '26 WMS Meeting WMS Concluded
Feb 11 '26 PRS Meeting PRS Concluded
Jan 14 '26 PRS Meeting PRS Concluded