NPRR #475 · Revision Request
NPRR475 EPS Metering Exception for ERS Generation
- PRS Oct 18 '12
- TAC Nov 1 '12
- BOARD Dec 11 '12
- PUCT —
ReasonThis NPRR reduces the market costs for metering associated with transmission connected generation participating in the ERS program.
Created2012-08-23
Approved2012-12-11
Sections Affected
10.2.210.2.3
Summary
This Nodal Protocol Revision Request (NPRR) allows transmission connected generators providing Emergency Response Service (ERS) to be exempt from the requirements for ERCOT-Polled Settlement (EPS) Metering if their energy exports to the ERCOT System occur only during ERS deployments or tests; and requires that Transmission Service Provider (TSP) and Distribution Service Provider (DSP) metering be installed to measure any energy exported to the ERCOT Transmission Grid and the TDSP would submit data to ERCOT for Settlement.
Timeline
- Aug 8
-
Aug 23
PRS Protocol Revision Subcommittee (PRS) MeetingPRSDeferred/Tabled Referred → WMS“To table NPRR475 and refer the issue to WMS and to support ERCOT continuing to extend or grant temporary exemptions necessary for ERS Contract Periods while NPRR475 is pending.” — Passed→ PRS for consideration.
- Sep 12
-
Sep 20
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval“To recommend approval of NPRR475 as submitted.” — Passed→ PRS for Impact Analysis review.
-
Oct 18
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Forwarded → TAC“To endorse and forward the 9/20/12 PRS Report and Impact Analysis for NPRR475 to TAC.” — Passed→ TAC for consideration.
-
Nov 1
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval“To recommend approval of NPRR475 as recommended by PRS in the 10/18/12 PRS Report.” — Passed→ ERCOT Board for consideration.
-
Dec 11
BOARD Board of Directors MeetingBOARDApproved“To approve NPRR475 as recommended by TAC in the 11/1/12 TAC Report.” — Passed
-
—
Posted since the last meeting