ERCOT·WATCH Search ercot.com  ⌕
NPRR #435 · Revision Request

NPRR435  Requirements for Energy Offer Curves in the Real Time SCED for Generation Resources Committed in RUC

Approved Urgent sponsor ERCOT posted 2012-01-03 ercot.com
ReasonTo address concerns raised at the December 8, 2011 Public Utility Commission of Texas (PUCT) Open Meeting regarding Project No. 37897, PUC Proceeding Relating to Resource and Reserve Adequacy and Shortage Pricing.
Created2012-01-19
Approved2012-02-21
Sections Affected
6.4.3.1 (new)
Summary
This Nodal Protocol Revision Request (NPRR) adds a requirement for the Qualified Scheduling Entity (QSE) of a Generation Resource committed by the Reliability Unit Commitment (RUC) process to submit an Energy Offer Curve that prices all energy from Low Sustained Limit (LSL) to High Sustained Limit (HSL) at the System-Wide Offer Cap (SWCAP) for RUC committed intervals. When Generation Resources are committed in the Day Ahead or during the Adjustment Period in the RUC process, the QSE shall submit an Energy Offer Curve for the Generation Resource that meets the above requirements no later than the end of the Adjustment Period immediately preceding the Operating Period that includes an Operating Hour coincident with the first hour of the RUC Dispatch Instruction. QSE updates to an Energy Offer Curve entered at the end of the Adjustment Period become effective in ERCOT systems at the start of the next Operating Period. Therefore, if a Generation Resource is committed by an ERCOT Operator issued Verbal Dispatch Instruction(VDI) for the Operating Hour in the immediate Operating Period, then it is expected that the QSE shall submit an Energy Offer Curve that meets the requirements described above as soon as reasonably practicable after receipt of the VDI. ERCOT systems will not validate that the Energy Offer Curve for RUC-committed Generation Resources meet the requirements described above. QSEs are solely responsible to make the submission changes needed to implement the Protocol requirements described in this NPRR.
Action Log 3 milestones
Amendments
DateBodyMotionResult
Jan 19 '12PRS To recommend approval of NPRR435 as amended by the 1/10/12 Luminant-Exelon comments and as revised by PRS and to forward NPRR435 and the Impact Analysis to TAC.Passed
Feb 2 '12TAC To recommend approval of NPRR435 as recommended by PRS in the 1/19/12 PRS Report and as revised by TAC.Passed
Ballots
DateBodyResultYesNoAbstain
Jan 11 '12 WMS Motion Fails 3.5 4 2 xls
Jan 11 '12 WMS 17 7 1 xls
Documents 13
NameTypePostedClassification
435NPRR-01 Requirements for Energy Offer Curves in the Real Time doc Jan 3 '12 Revision Request
435NPRR-02 Impact Analysis 010312 doc Jan 3 '12 Staff Report
435NPRR-03 Calpine Comments 010912 doc Jan 9 '12 Revision Request Comments
435NPRR-04 Luminant-Exelon Comments 011012 doc Jan 10 '12 Revision Request Comments
435NPRR-05 WMS Comments 011212 doc Jan 12 '12 Revision Request Comments
435NPRR-06 WMS Voting Ballot 011212 xls Jan 12 '12 Revision Request Ballot
435NPRR-07 TIEC Comments 011712 doc Jan 17 '12 Revision Request Comments
435NPRR-08 PRS Report 011912 doc Jan 24 '12 Committee Report
435NPRR-09 Credit WG Comments 012612 doc Jan 26 '12 Revision Request Comments
435NPRR-10 ERCOT Steel Companies Comments 013112 doc Jan 31 '12 Revision Request Comments
435NPRR-11 TAC Report 020212 doc Feb 3 '12 Committee Report
435NPRR-12 TAC Voting Ballot 020212 xls Feb 3 '12 Revision Request Ballot
435NPRR-13 Board Report 022112 doc Feb 21 '12 Committee Report
Meetings That Took It Up 5
DateMeetingCommitteeStatus
Feb 21 '12 Board of Directors Meeting BOARD Concluded
Feb 2 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Jan 26 '12 Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting CREDITWG Concluded
Jan 19 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Jan 11 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded