NPRR #1005 · Revision Request
NPRR1005 Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB)
ReasonAddresses current operational issues; Market efficiencies or enhancements
Created2020-06-11
Approved2021-08-19
Sections Affected
2.12.23.2.6.2.23.10.3.13.10.7.23.10.7.33.10.7.5.23.153.15.13.15.26.5.7.710.3.2.3and 23K
Summary
This Nodal Protocol Revision Request (NPRR) proposes the following revisions: • Revises the definition of Point of Interconnection (POI) to refer to any physical location where a Generation Entity’s Facilities connect to a Transmission Service Provider’s (TSP’s) Facilities, and removes references to Load interconnections, since the only relevant Load connection points are those associated with the Generation Entity’s generators, which are included in the term “Generation Entity’s Facilities.” • Introduces the term “Point of Interconnection Bus (POIB)” to refer to the Electrical Bus in the substation that is closest to the Generation Resource’s POI, or any electrically equivalent Electrical Bus in that substation, for each TSP-owned substation to which the Generation Resource interconnects. • Changes POI to POIB throughout the Protocols in appropriate cases based on the above clarifications. • Removes the reference to POI in Section 2.1 in the definition of Aggregate Generation Resource because having a common Generator Step Up (GSU) transformer would aggregate output before the POI, and the generators’ separate outputs do not have separate POIs. • Clarifies Section 10.3.2.3 to specify that, at a given Generation Resource Facility, generation and associated Load must either be physically metered at each POI or Service Delivery Point, or loss-compensated to the applicable POI in accordance with Section 10.3.2.2. • Adds NPRR917, Nodal Pricing for Settlement Only Distribution Generators (SODGs) and Settlement Only Transmission Generators (SOTGs), greyboxed language to Section 10.3.2.3 and removes the greybox, as there is no system implementation required for language in Section 10.3.2.3. • Removes POI from Section 23, Form K because it is used there incorrectly.
Action Log 6 milestones
-
Jun 11
PRSDeferred/Tabled→ Language Consideration
-
May 13
PRSRecommended for Approval→ Impact Analysis Consideration
-
Jun 10
PRSRecommended for Approval→ Revision Request Consideration
-
Jun 23
TACRecommended for Approval→ Revision Request Consideration
-
Aug 10
BOARDRecommended for Approval→ PUCT for consideration
-
Aug 19
PUCTApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| May 13 '21 | PRS | to recommend approval of NPRR1005 as amended by the 4/7/21 Longhorn Power comments as revised by PRS | Passed |
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Jun 23 '21 | TAC | Motion Passes | 30 | 0 | 0 | xls |
| Jun 10 '21 | PRS | Motion Carries | 7 | 0 | 0 | xls |
| May 13 '21 | PRS | Motion Carries | 7 | 0 | 0 | xls |
Documents 16
| Name | Type | Posted | Classification |
|---|---|---|---|
| 1005NPRR-01 Clarify Definition of POI and Add Definition POIB 022620 | doc | Feb 26 '20 | Revision Request |
| 1005NPRR-02 Impact Analysis 022620 | docx | Feb 26 '20 | Staff Report |
| 1005NPRR-03 PRS Ballot 061120 | xls | Jun 16 '20 | Revision Request Ballot |
| 1005NPRR-04 PRS Report 061120 | doc | Jun 16 '20 | Committee Report |
| 1005NPRR-05 ERCOT Comments 020421 | doc | Feb 4 '21 | Revision Request Comments |
| 1005NPRR-06 TIEC Comments 031021 | doc | Mar 10 '21 | Revision Request Comments |
| 1005NPRR-07 CenterPoint Energy Comments 033021 | doc | Mar 30 '21 | Revision Request Comments |
| 1005NPRR-08 Longhorn Power Comments 040721 | doc | Apr 7 '21 | Revision Request Comments |
| 1005NPRR-09 PRS Ballot 051321 | xls | May 18 '21 | Revision Request Ballot |
| 1005NPRR-10 PRS Report 051321 | docx | May 18 '21 | Committee Report |
| 1005NPRR-11 PRS Ballot 061021 | xls | Jun 15 '21 | Revision Request Ballot |
| 1005NPRR-12 PRS Report 061021 | docx | Jun 15 '21 | Committee Report |
| 1005NPRR-13 TAC Ballot 062321 | xls | Jun 28 '21 | Revision Request Ballot |
| 1005NPRR-14 TAC Report 062321 | docx | Jun 28 '21 | Committee Report |
| 1005NPRR-15 Board Report 081021 | docx | Aug 12 '21 | Committee Report |
| 1005NPRR-16 PUCT Report 081921 | docx | Aug 24 '21 | Committee Report |
Meetings That Took It Up 32
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Aug 10 '21 | Urgent Board of Directors Meeting – Teleconference Available by Webcast | BOARD | Concluded |
| Jun 23 '21 | TAC Meeting by Webex Only | TAC | Concluded |
| Jun 10 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| May 26 '21 | TAC Meeting by Webex Only | TAC | Concluded |
| May 13 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| Apr 28 '21 | TAC Meeting by Webex Only | TAC | Concluded |
| Apr 15 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| Mar 24 '21 | TAC Meeting by Webex Only | TAC | Concluded |
| Mar 11 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| Feb 11 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| Jan 27 '21 | TAC Meeting by Webex Only | TAC | Concluded |
| Jan 14 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| Dec 10 '20 | PRS Meeting by Webex Only | PRS | Concluded |
| Nov 18 '20 | TAC Meeting by Webex Only | TAC | Concluded |
| Nov 11 '20 | PRS Meeting by Webex Only | PRS | Concluded |
| Oct 28 '20 | TAC Meeting by Webex Only | TAC | Concluded |
| Oct 15 '20 | PRS Meeting by Webex Only | PRS | Concluded |
| Oct 8 '20 | ROS Meeting by Webex Only | ROS | Concluded |
| Sep 10 '20 | PRS Meeting | PRS | Concluded |
| Sep 3 '20 | ROS Meeting | ROS | Concluded |
| Aug 13 '20 | PRS Meeting | PRS | Concluded |
| Aug 6 '20 | ROS Meeting | ROS | Concluded |
| Jul 16 '20 | PRS Meeting | PRS | Concluded |
| Jul 9 '20 | ROS Meeting | ROS | Concluded |
| Jun 18 '20 | OWG Meeting by Webex Only | OWG | Concluded |
| Jun 11 '20 | PRS Meeting | PRS | Concluded |
| Jun 4 '20 | ROS Meeting | ROS | Concluded |
| May 19 '20 | VPWG Meeting by Webex Only | VPWG | Concluded |
| May 13 '20 | PRS Meeting by Webex Only | PRS | Concluded |
| May 7 '20 | ROS Information Session - Webex Only | ROS | Concluded |
| Apr 16 '20 | PRS Information Session - WebEx Only | PRS | Concluded |
| Mar 25 '20 | PRS Information Session - WebEx only | PRS | Concluded |