NPRR #35 · Revision Request

NPRR035  Nodal Protocol Clarifications Required For Net Metering Provisions

Approved sponsor TPTF posted 2006-11-06 ercot.com
ReasonThese changes are required to port the existing net metering provisions of the zonal market to the nodal market implementation. Additionally, these changes clarify that Generation Resource’s must provide net generation output for use by the ERCOT systems.
Created2006-11-28
Approved2007-07-17
Sections Affected
1.3.1.13.7.1.16.5.5.26.6.3.110.3.2.3
Summary
Revision to Protocol Section 1.3.1.1(w) adds the submittals to ERCOT by affected Entities that are required under the provisions of Protocol Section 10.3.2.3. This change captures as protected information the descriptions of the metering facilities of all Common Switchyards that contain multiple points of interconnection of Loads (ESIDs) and generation meters (EPS). Revisions to Protocol Section 3.7.1.1 add the requirement to include within the Resource Parameters submittal the methodology and, if utilized, the values of constants in any underlying net injection calculation for each Resource. Revision to Protocol Section 6.5.5.2 clarifies that net power output from generation resources may be provided to ERCOT systems as a measured or calculated value. Revisions to Protocol Section 6.6.3.1, Real-Time Energy Imbalance Payment or Charge at a Resource Node incorporate settlement methodology to be applied in the situation of a net metering installation. Revisions to Protocol Section 10.3.2.3: memorializes the requirement that affected entities provide to ERCOT metering diagrams; and adds the requirement that all Load(s) included in a net metering arrangement for an EPS Metering Facility shall only be electrically connected to the ERCOT grid through the EPS Metering point(s) for such Facility and that these Loads shall not be electrically connected to the ERCOT Grid through electrical connections that are not metered by the EPS metering point(s) for the Facility.
Action Log 6 milestones
Amendments
DateBodyMotionResult
Feb 22 '07PRS To recommend approval of NPRR035 as amended by ERCOT Staff comments [dated 2/14/07].Passed
May 17 '07PRS To recommend approval of NPRR035 as revised by ERCOT Staff comments dated 5/9/07.Passed
Nov 28 '06TPTF To recommend approval of NPRR035 as revised by ERCOT comments and TPTF.Passed
Documents 16
NameTypePostedClassification
035NPRR-01 Nodal Protocol Clarifications Required For Net Meteri doc Nov 6 '06 Revision Request
035NPRR-02 ERCOT Staff Comments 112106 doc Nov 21 '06 Revision Request Comments
035NPRR-03 LCRA Comments 112106 doc Nov 21 '06 Revision Request Comments
035NPRR-04 TPTF Comments 120606 doc Dec 6 '06 Revision Request Comments
035NPRR-05 Preliminary IA 011707 doc Jan 17 '07 Staff Report
035NPRR-06 ERCOT Staff Comments 012907 doc Jan 29 '07 Revision Request Comments
035NPRR-07 ERCOT Staff Comments 021407 doc Feb 14 '07 Revision Request Comments
035NPRR-08 PRS Recommendation Report 022207 doc Feb 23 '07 Committee Report
035NPRR-09 ERCOT Staff Comments 050907 doc May 9 '07 Revision Request Comments
035NPRR-10 PRS Recommendation Report 051707 doc May 22 '07 Committee Report
035NPRR-11 Impact Analysis 060807 doc Jun 8 '07 Staff Report
035NPRR-12 B1G2 Impact Analysis 061207 doc Jun 13 '07 Staff Report
035NPRR-13 PRS Recommendation Report 061207 doc Jun 13 '07 Committee Report
035NPRR-14 TAC Recommendation Report 062807 doc Jul 13 '07 Committee Report
035NPRR-15 Board Action Report 071707 doc Jul 19 '07 Committee Report
Vote-NPRR035_TPTF_112806 corrected 010208 xls Jan 2 '08 Revision Request Ballot
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Jun 12 '07 PRS and TPTF: Joint Meeting PRS Concluded
May 17 '07 PRS Meeting PRS Concluded
Feb 22 '07 PRS Meeting PRS Concluded
Feb 5 '07 TPTF Meeting TPTF Concluded
Jan 22 '07 PRS Meeting PRS Concluded
Dec 14 '06 PRS Meeting PRS Concluded
Nov 28 '06 TPTF Meeting TPTF Concluded