ERCOT·WATCH Search ercot.com  ⌕
NPRR #613 · Revision Request

NPRR613  Clarification of Fuel Adder into the Mitigated Offer Cap

Approved sponsor ERCOT posted 2014-03-26 ercot.com
ReasonRemoves potentially vague Protocol language with a clear and concise description of the application of the fuel adder into the Mitigated Offer Cap.
Created2014-04-10
Approved2014-06-10
Sections Affected
4.4.9.4.1
Summary
This Nodal Protocol Revision Request (NPRR) clarifies the implementation of the fuel adder into the Mitigated Offer Cap as provided in NPRR485, Clarification for Fuel Adder Provisions, approved by ERCOT Board of Directors 11/13/2012, and as planned to take effect upon ERCOT’s implementation of the automated solution of NPRR485. Additional Background: NPRR485 introduced the concept of a verifiable fuel adder to be used in the calculation of the Mitigated Offer Cap and Verifiable Startup and minimum energy costs. When NPRR485 was approved on November 13, 2012, the specific calculation of how the fuel adder would be used in the Mitigated Offer Cap was not yet determined. Per Appendix 6 and 7 of the Verifiable Cost Manual, as an interim step and manual work around, Quick Start Generation Resources (QSGRs) had the fuel adder incorporated into their verifiable Incremental Heat Rate (IHR) points. All other Generation Resources were not eligible to get the fuel adder until ERCOT determined the automated solution needed to incorporate the fuel adder into the Mitigated Offer Cap and implemented that solution into its systems.
Action Log 4 milestones
Documents 6
NameTypePostedClassification
613NPRR-01 Implementation of Fuel Adder into Mitigated Offer Cap doc Mar 26 '14 Revision Request
613NPRR-02 Impact Analysis 032614 doc Mar 26 '14 Staff Report
613NPRR-03 PRS Report 041014 doc Apr 14 '14 Committee Report
613NPRR-04 PRS Report 051514 doc May 19 '14 Committee Report
613NPRR-05 TAC Report 052914 doc May 30 '14 Committee Report
613NPRR-06 Board Report 061014 doc Jun 12 '14 Committee Report
Meetings That Took It Up 5
DateMeetingCommitteeStatus
Jun 10 '14 Board of Directors Meeting BOARD Concluded
May 29 '14 TAC Meeting TAC Concluded
May 15 '14 PRS Meeting PRS Concluded
Apr 16 '14 Joint CWG/MCWG Meeting CREDITWG Concluded
Apr 10 '14 PRS Meeting PRS Concluded