NPRR425  Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR (formerly "Creation of a WGR Group for GREDP and Base Point Deviation Evaluation")

Approved sponsor ERCOT posted 2011-11-01 ercot.com
ReasonIn Protocol Revision Request (PRR) 830, Reactive Power Capability Requirement, ERCOT modified the definition of a "Wind-powered Generation Resource" in order to obtain a more accurate representation of the reactive capabilities of the aggregated turbines of the same model and size for reactive modeling purposes. However, for Dispatch purposes, many Qualified Scheduling Entities (QSEs) / Resource Entities representing WGRs are not able to independently Dispatch those WGRs due to control limitations. Therefore, ERCOT believes an acceptable solution to this problem is to create a WGR Group for Dispatch purposes while still maintaining the WGR definition for reactive modeling purposes. The creation of the WGR Group also addresses the Base Point Deviation treatment for these WGRs under their current operational capabilities. By allowing multiple wind turbine models or sizes to be combined in a single WGR, Market Participants may avoid the burden of having to register and operate additional WGRs due to the replacement of wind turbines if the replacement turbines have similar, if not exact characteristics, or due to the installation of a de minimis number of turbines that may have different characteristics from the majority of turbines in the WGR for the purpose of testing new technologies, so long as it does not reduce ERCOT’s ability to model pre- and post-contingency conditions on the ERCOT Transmission Grid.
Created2011-11-17
Approved2012-11-13
Sections Affected
2.13.10.7.26.6.5.28.1.1.4.1
Summary
This Nodal Protocol Revision Request (NPRR) provides that Wind-powered Generation Resources (WGRs) meeting registration requirements will be evaluated for Generation Resource Energy Deployment Performance (GREDP) and Base Point Deviation as groups of WGRs rather than individual WGRs. This NPRR also permits multiple wind turbine models or sizes to be combined in a single WGR if certain criteria are met.
Action Log 9 milestones
Amendments
DateBodyMotionResult
Feb 23 '12PRS To recommend approval of NPRR425 as amended by the 2/17/12 E.ON comments.Passed
Jun 21 '12PRS To endorse the 2/23/12 PRS Report as amended by the 6/11/12 ERCOT comments and to direct that NPRR425 and a revised Impact Analysis return to the July 2012 PRS meeting.Passed
Oct 4 '12TAC To recommend approval of NPRR425 as recommended by PRS in the 7/19/12 PRS Report and as amended by the 9/26/12 ERCOT comments and 9/27/12 Wind Coalition comments.
Documents 27
NameTypePostedClassification
425NPRR-01 Creation of a WGR Group for GREDP and Base Point Devi doc Nov 2 '11 Revision Request
425NPRR-02 Impact Analysis 110211 doc Nov 2 '11 Staff Report
425NPRR-03 WMS Comments 110911 doc Nov 9 '11 Revision Request Comments
425NPRR-04 PRS Report 111711 doc Feb 24 '12 Committee Report
425NPRR-05 WMS Comments 120911 doc Dec 9 '11 Revision Request Comments
425NPRR-06 E.ON Comments 021512 doc Feb 15 '12 Revision Request Comments
425NPRR-07 E.ON Comments 021712 doc Feb 24 '12 Revision Request Comments
425NPRR-08 WMS Comments 021712 doc Feb 17 '12 Revision Request Comments
425NPRR-09 PRS Report 022312 doc Mar 1 '12 Committee Report
425NPRR-10 Revised Impact Analysis 032112 doc Mar 21 '12 Staff Report
425NPRR-11 ERCOT Comments 032112 doc Mar 21 '12 Revision Request Comments
425NPRR-12 PRS Report 032212 doc Mar 26 '12 Committee Report
425NPRR-13 ERCOT Comments 041012 doc Apr 10 '12 Revision Request Comments
425NPRR-14 WMS Comments 041612 doc Apr 16 '12 Revision Request Comments
425NPRR-15 ROS Comments 041612 doc Apr 16 '12 Revision Request Comments
425NPRR-16 Oncor Electric Delivery Comments 041612 doc Apr 16 '12 Revision Request Comments
425NPRR-17 PRS Report 041912 doc Apr 23 '12 Committee Report
425NPRR-18 ERCOT Comments 061112 doc Jun 11 '12 Revision Request Comments
425NPRR-19 ROS Comments 061812 doc Jun 18 '12 Revision Request Comments
425NPRR-20 PRS Report 062112 doc Jun 22 '12 Committee Report
425NPRR-21 PRS Report 071912 doc Jul 20 '12 Committee Report
425NPRR-22 Revised Impact Analysis 090612 doc Sep 6 '12 Staff Report
425NPRR-23 TAC Report 090712 doc Sep 10 '12 Committee Report
425NPRR-24 ERCOT Comments 092612 doc Sep 26 '12 Revision Request Comments
425NPRR-25 Wind Coalition Comments 092712 doc Sep 27 '12 Revision Request Comments
425NPRR-26 TAC Report 100412 doc Oct 4 '12 Committee Report
425NPRR-27 Board Report 111312 doc Nov 13 '12 Committee Report
Meetings That Took It Up 31
DateMeetingCommitteeStatus
Sep 12 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Jul 30 '13 Resource Data Working Group RDWG Concluded
Nov 13 '12 Board of Directors Meeting BOARD Concluded
Oct 4 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Sep 7 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Jul 19 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Jun 27 '12 Steady State Working Group (SSWG) Meeting SSWG Concluded
Jun 21 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Jun 14 '12 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Jun 12 '12 Dynamics Working Group (DWG) Meeting DWG Concluded
May 17 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
May 9 '12 Steady State Working Group (SSWG) Bi-Weekly Meeting by WebEx Only SSWG Concluded
May 9 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
May 4 '12 Qualified Scheduling Entity Managers Working Group (QMWG) Meeting QMWG Concluded
Apr 30 '12 ROS - NPRR425 Workshop ROS Concluded
Apr 19 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Apr 12 '12 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Apr 11 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Mar 30 '12 NERC Reliability Working Group (NRWG) Meeting NRWG Concluded
Mar 22 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Feb 29 '12 Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting MCWG Concluded
Feb 23 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Feb 15 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Feb 8 '12 Qualified Scheduling Entity Managers Working Group (QMWG) Meeting QMWG Concluded
Jan 19 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Jan 11 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Jan 6 '12 Qualified Scheduling Entity Managers Working Group (QMWG) Meeting QMWG Concluded
Dec 15 '11 PRS Meeting PRS Concluded
Dec 7 '11 WMS Meeting WMS Concluded
Dec 2 '11 QMWG Meeting QMWG Concluded
Nov 17 '11 PRS Meeting PRS Concluded