NPRR #28 · Revision Request

NPRR028  CRR Trading in Blocks Only

Approved sponsor ERCOT Staff posted 2006-09-14 ercot.com
ReasonThe vendor (Nexant) CRR system does not support the flexibility of bilaterally trading CRRs for each hour and offering CRRs for particular hour or hours (except time-of-use blocks in Section 7.3 (6)) in CRR Auctions. Vendor estimates a cost of $395,000 for adding this flexibility to their system due to required fundamental changes in the following: data interfaces; Market User Interface functionality (new Java based editor, bilateral trading system, portfolio editor, downloads): Market Operator Interface functionality (command manager); Database Subsystem; testing; and documentation. In addition to the development costs, the CRR team believes there might be other long-term costs associated with the maintenance of the CRR System due to increased complexity, possible need for increased H/W costs for performance and storage, increased auditing overhead, archiving requirements, etc. These long-term costs are not very easy to assess and have not yet been quantified.
Created2006-09-21
Approved2006-10-17
Sections Affected
7.27.5.2.17.5.3.17.8
Summary
Revise how CRRs may be traded in the bilateral market and in CRR Auctions. This revision would limit CRR trading to time-of-use blocks for a particular date and CRR Offers in CRR Auctions to time-of-use blocks. With this revision, CRR Account Holders would not be able to trade a particular hour or a block of hours that is not one of the defined time-of-use blocks in Section 7.3 (6).
Action Log 5 milestones
Documents 7
NameTypePostedClassification
028NPRR-01 CRR Trading in Blocks Only 091406 doc Sep 14 '06 Revision Request
028NPRR-02 Impact Analysis 091406 doc Sep 14 '06 Staff Report
028NPRR-03 PRS Recommendation Report 092106 doc Sep 26 '06 Committee Report
028NPRR-04 TAC Recommendation Report 100606 doc Oct 6 '06 Committee Report
028NPRR-05 BOD Action Report 101706 doc Oct 19 '06 Committee Report
028NPRR-06 B1G1 Impact Analysis 060507 doc Jun 13 '07 Staff Report
028NPRR-07 PRS Recommendation Report 061207 doc Jun 14 '07 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Jun 12 '07 PRS and TPTF: Joint Meeting PRS Concluded
Oct 17 '06 ERCOT Board of Directors Meeting BOARD Concluded
Oct 6 '06 TAC Meeting TAC Concluded
Sep 21 '06 PRS Meeting PRS Concluded