NPRR314  Requirement to Post Generation Resources Temporal Constraints

Approved sponsor Luminant Energy Company, LLC posted 2011-02-01 ercot.com
ReasonThe posting of this information increases reliability by allowing Qualified Scheduling Entities (QSEs) with Resources the ability to verify the temporal constraints ERCOT is using in the RUC process so that commitment decisions will be made with accurate availability information. If ERCOT’s Security Sequence is utilizing changes to the telemetered Resource Status to detect the temporal condition of a Resource, there may be inadvertent changes to the Resource Status in the QSE’s control system that do not reflect the actual condition of the Generation Resource. Posting of the Resource’s current Off-Line hours and corresponding startup times will allow QSEs to verify the assumed condition used by RUC in the Security Sequence.
Created2011-03-24
Approved2011-07-19
Sections Affected
5.1
Summary
This Nodal Protocol Revision Request (NPRR) adds language to specify the need for ERCOT to post to the Market Information System (MIS) Certified Area the current time since a Generation Resource last went Off-Line (in hours) and the corresponding startup time ERCOT is using for of all Off-Line Generation Resources which may be considered in any Reliability Unit Commitment (RUC) process.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Apr 21 '11PRS To recommend approval of NPRR314 as amended by the 4/5/11 Luminant comments.Passed
Documents 11
NameTypePostedClassification
314NPRR-01 Requirement to Post Generation Resources Temporal Con doc Feb 1 '11 Revision Request
314NPRR-02 PRS Report 032411 doc Mar 28 '11 Committee Report
314NPRR-03 Luminant Comments 040511 doc Apr 5 '11 Revision Request Comments
314NPRR-04 WMS Comments 041111 doc Apr 11 '11 Revision Request Comments
314NPRR-05 Calpine Comments 041211 doc Apr 12 '11 Revision Request Comments
314NPRR-06 PRS Report 042111 doc Apr 22 '11 Committee Report
314NPRR-07 Impact Analysis 051211 doc May 12 '11 Staff Report
314NPRR-08 Cost Benefit Analysis 051811 xls May 18 '11 Staff Report
314NPRR-09 PRS Report 051911 doc May 20 '11 Committee Report
314NPRR-10 TAC Report 060211 doc Jun 3 '11 Committee Report
314NPRR-11 Board Report 071911 doc Jul 19 '11 Committee Report
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Jul 19 '11 Board of Directors Meeting BOARD Concluded
Jun 2 '11 TAC Meeting TAC Concluded
May 19 '11 PRS Meeting PRS Concluded
Apr 21 '11 PRS Meeting PRS Concluded
Apr 8 '11 WMS Meeting WMS Concluded
Apr 4 '11 QMWG Meeting QMWG Concluded
Mar 24 '11 PRS Meeting PRS Concluded