ERCOT·WATCH Search ercot.com  ⌕
NPRR #909 · Revision Request

NPRR909  Address Unavailability Gap for ERS and Other Minor Clarifications

Approved sponsor ERCOT posted 2018-11-20 ercot.com
Created2018-12-13
Approved2019-04-09
Sections Affected
3.14.3.13.14.3.38.1.3.1.18.1.3.1.28.1.3.1.3.18.1.3.1.3.28.1.3.1.48.1.3.4
Summary
This Nodal Protocol Revision Request (NPRR): • Addresses periods of unavailability due to unplanned unavailability for Loads and Generators; • Changes the name reference of “Default Baseline Methodology” to “Demand Response Baseline Methodologies”; • Deletes the reference to post the Qualified Scheduling Entity (QSE) portfolio–level report since it is already listed under required reports in paragraph (3) of Section 3.14.3.4; • Addresses what happens if a generator fails an event as the current language only addresses failures for a test; • Deletes a sentence that is duplicated in paragraph (2) of Section 8.1.3.1.3.2 about meter data for generator availability which is in the event performance section; • Adds language to qualify as a co-located generator as all Time-Periods must match between the Load and generator; • Adds clarifying language about when the recovery period starts; • Specifies the use of the Maximum Megawatt (MW) from all offered Time-Periods for weather sensitive Resources; • Adds clarifying language to specify that weather sensitive Resource testing does not count towards the cumulative deployment limit of eight hours; and • Removes language regarding when to return to normal operations since the language is specific to paragraph (3) of Section 3.14.3.3.
Action Log 5 milestones
Documents 8
NameTypePostedClassification
909NPRR-01 Address Unavailability Gap for ERS and Other Minor Clarifications 112018 doc Nov 20 '18 Revision Request
909NPRR-02 Impact Analysis 112018 doc Nov 20 '18 Staff Report
909NPRR-03 PRS Report 121318 doc Dec 14 '18 Committee Report
909NPRR-04 WMS Comments 011019 doc Jan 10 '19 Revision Request Comments
909NPRR-05 PRS Report 011719 doc Jan 21 '19 Committee Report
909NPRR-06 PRS Report 021419 doc Feb 15 '19 Committee Report
909NPRR-07 TAC Report 032719 doc Mar 28 '19 Committee Report
909NPRR-08 Board Report 040919 doc Apr 12 '19 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Apr 9 '19 Board of Directors Meeting BOARD Concluded
Mar 27 '19 TAC Meeting TAC Concluded
Feb 14 '19 PRS Meeting PRS Concluded
Jan 17 '19 PRS Meeting PRS Concluded
Jan 9 '19 WMS Meeting WMS Concluded
Dec 13 '18 PRS Meeting PRS Concluded