NPRR #620 · Revision Request

NPRR620  Collateral Requirements for Counter-Parties with No Load or Generation

Approved sponsor ERCOT posted 2014-04-30 ercot.com
ReasonThe existing Protocol methodology for computing exposure does not reflect the market risk profile of trading Counter-Parties that represent neither Load nor generation. In addition, under existing calculations, in certain circumstances Counter-Parties with neither Load nor generation may not have an MCE while continuing to operate in the Market.
Created2014-05-15
Approved2014-08-12
Sections Affected
16.11.4.116.11.4.216.11.4.3
Summary
This Nodal Protocol Revision Request (NPRR) revises the calculation of credit exposure for Counter-Parties that represent neither Load nor generation by adjusting the M1 factor for forward exposure risk to reflect the fact that these Counter-Parties do not have Mass Transition risk, reducing the 40-day "look back" period for certain exposure components to 20 days and specifying a Minimum Current Exposure (MCE) for these Counter-Parties that is also used as the Initial Estimated Liability.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Jun 11 '14PRS To endorse and forward the 5/15/14 PRS Report as amended by the 5/21/14 ERCOT and 5/28/14 Credit WG comments and the Impact Analysis to TAC with a recommended priority of 2014 and rank of 1160.Passed
Documents 8
NameTypePostedClassification
620NPRR-01 Collateral Requirements for Counter-Parties with No L doc Apr 30 '14 Revision Request
620NPRR-02 Impact Analysis 043014 doc May 2 '14 Staff Report
620NPRR-03 PRS Report 051514 doc May 19 '14 Committee Report
620NPRR-04 ERCOT Comments 052114 doc May 21 '14 Revision Request Comments
620NPRR-05 CWG Comments 052814 doc May 28 '14 Revision Request Comments
620NPRR-06 PRS Report 061114 doc Jun 16 '14 Committee Report
620NPRR-07 TAC Report 062614 doc Jun 30 '14 Committee Report
620NPRR-08 Board Report 081214 doc Aug 13 '14 Committee Report
Meetings That Took It Up 5
DateMeetingCommitteeStatus
Aug 12 '14 Board of Directors Meeting BOARD Concluded
Jun 26 '14 TAC Meeting TAC Concluded
Jun 11 '14 PRS Meeting PRS Concluded
May 22 '14 Joint CWG/MCWG Meeting CREDITWG Concluded
May 15 '14 PRS Meeting PRS Concluded