NPRR #514 · Revision Request

NPRR514  Seasonal Generation Resource

Approved Urgent sponsor Luminant Energy Company LLC posted 2013-02-04 ercot.com
ReasonThe current ERCOT Protocols do not have a designation that accurately reflects the status of a unit that intends to operate every summer but not be available at other times of the year. Because such seasonal operation may mean that the Resource would not be in operation for more than 180 days, the existing ERCOT process to "mothball" a Generation Resource comes into effect. That process requires substantial efforts on the part of both ERCOT and the Resource Entity to "mothball" then "un-mothball" the Resource when it returns to service. This NPRR creates a more efficient process by allowing the Generation Resource to remain modeled in the ERCOT systems while it is not available for operation and allows the Generation Resource to be shown as on Planned Outage in the Outage Scheduler during the period that it is not available for operation. To facilitate these changes, this NPRR adds a new checkbox on the Notification of Suspension of Operations form notifying ERCOT (and through the existing posting process, ERCOT Market Participants as well) that a Generation Resource owner plans to seasonally operate the Resource for a specific period of time. It also creates a new checkbox on the Notification of Change of Generation Resource Designation form to allow a Generation Resource to change from seasonal operation back to year-round operation if desired. This form is also revised to provide a Market Notice if the Generation Resource needs to modify its summer Operating Period (i.e., to start earlier than June 1 or to end later than September 30). The changes described in this NPRR will provide transparency to the market and simplify the process to allow Generation Resources to operate seasonally without all the complications of the existing mothball process.
Created2013-02-21
Approved2013-05-14
Sections Affected
2.13.9.13.14.1.13.14.1.922-E22-H
Summary
This Nodal Protocol Revision Request (NPRR) creates a new variation of ERCOT’s existing mothball process to allow Resource Entities to operate their Facilities during summer peak Load periods without having to go through the existing mothballing process each year. This NPRR modifies the Protocols to allow a Resource Entity to designate that its Generation Resource will operate only on a seasonal basis (i.e., at least during the period June 1 to September 30). Additional language changes are provided to describe the process for ERCOT to review the request to operate seasonally and to allow ERCOT to request the Generation Resource to become available earlier than June 1 or remain available after September 30 if ERCOT determines that the Generation Resource is needed for reliability reasons.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Apr 18 '13PRS To grant Urgent status to NPRR514, to recommend approval of NPRR514 as amended by the 4/15/13 WMS comments, and to forward NPRR514 to TAC.Passed
May 2 '13TAC To recommend approval of NPRR514 as recommended by PRS in the 4/18/13 PRS Report as amended by the 4/30/13 Luminant comments and as revised by TAC with a recommended priority of 2013 and rank of 395; and requested the ERCOT Board remand NPRR514 to TAC if the Impact Analysis is greater than $100k.Passed
Documents 12
NameTypePostedClassification
514NPRR-01 Seasonal Generation Resource 020413 doc Feb 4 '13 Revision Request
514NPRR-02 PRS Report 022113 doc Mar 13 '13 Committee Report
514NPRR-03 ERCOT Comments 031813 doc Mar 18 '13 Revision Request Comments
514NPRR-04 Luminant Energy Company LLC Comments 032013 doc Mar 20 '13 Revision Request Comments
514NPRR-05 PRS Report 032113 doc Mar 26 '13 Committee Report
514NPRR-06 WMS Comments 041513 doc Apr 15 '13 Revision Request Comments
514NPRR-07 PRS Report 041813 doc Apr 22 '13 Committee Report
514NPRR-08 ERCOT Comments 043013 doc Apr 30 '13 Revision Request Comments
514NPRR-09 Luminant Comments 043013 doc Apr 30 '13 Revision Request Comments
514NPRR-10 TAC Report 050213 doc May 3 '13 Committee Report
514NPRR-11 Impact Analysis 050313 doc May 3 '13 Staff Report
514NPRR-12 Board Report 051413 doc May 16 '13 Committee Report
Meetings That Took It Up 7
DateMeetingCommitteeStatus
May 14 '13 Board of Directors Meeting BOARD Concluded
May 2 '13 Technical Advisory Committee (TAC) Meeting TAC Concluded
Apr 24 '13 Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting CREDITWG Concluded
Apr 18 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Apr 12 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Mar 21 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Feb 21 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded