NPRR #351 · Revision Request
NPRR351 SCED Look-Ahead Step 1: Pricing: Calculate Non-Binding Prices and Basepoints for Initial Research into SCED Look-Ahead and allow Consumers to have a Forward Price Projection (formerly "Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes")
ReasonERCOT expects this NPRR will be the first step of a multi-phase implementation of SCED Look-Ahead, with the results of this NPRR primarily being used for research purposes to determine how to best calculate prices and base points for future periods. In addition, the ERCOT Steel Mills and at least one retailer have expressed a strong desire to use the results to make Real-Time decisions on how to consume power in Real-Time based on prices. Primarily, this will be used to determine the accuracy (and improve it, if possible) of the SCED Look-Ahead Real-Time Dispatch process. At issue will be whether the improved algorithm delivers better results than the current one. There are a number of areas to analyze, including: · The predictability of the wind generation over the next hour. · How near-term Load growth and generator Dispatch will create binding contingencies over the next hour. · What sort of uplift costs will be created by the process, if any, once it becomes binding.
Created2011-05-19
Approved2011-12-12
Rejected2011-06-23
Sections Affected
6.3.26.5.7.3
Summary
Using the inputs specified in this Nodal Protocol Revision Request (NPRR), ERCOT will calculate prices and base points over the next hour, using an hour-long optimization instead of a five-minute optimization. These calculated prices and base points will initially be non-binding, although it is anticipated that these will become binding as Security-Constrained Economic Dispatch (SCED) Look-Ahead progresses in future phases. Not covered by this NPRR are the larger pieces of SCED Look-Ahead, like Real-Time commitment of generators and Load Resources (possibly replacing or eliminating the Non-Spinning Reserve (Non-Spin) product), Real-Time co-optimization of energy and Ancillary Services (including determining when the co-optimization occurs), whether to charge make-whole charges and to whom they should be charged to, and how these revisions will support the overall market design and Resource adequacy requirements.
Action Log 12 milestones
-
May 19
PRSDeferred/Tabled→ PRS language consideration
-
Jun 23
PRSRejected
-
Jul 7
Under Appeal→ TAC consideration of ERCOT Steel Mills appeal
-
Aug 4
TACRemanded→ PRS consideration of NPRR351
-
Aug 18
PRSRecommended for Approval→ PRS Impact Analysis review
-
Sep 22
PRSDeferred/Tabled→ PRS Impact Analysis review
-
Oct 20
PRS→ PRS Impact Analysis review
-
Nov 3
TACRemanded→ PRS consideration of NPRR351
-
Nov 17
PRSDeferred/Tabled→ PRS consideration of NPRR351
-
Nov 29
PRS→ TAC consideration of NPRR351
-
Dec 1
TACRecommended for Approval→ ERCOT Board consideration of NPRR351
-
Dec 12
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Aug 18 '11 | PRS | To recommend approval of NPRR351 as revised by PRS for the sole purpose of ERCOT’s preparation of an Impact Analysis for PRS review. | Passed |
| Nov 3 '11 | TAC | To grant the 10/20/11 ERCOT Steel Mills appeal and to remand NPRR351 to PRS as revised by TAC; to encourage WMS and PRS to continue discussions with ERCOT on the details of the SCED Look-Ahead project through workshops, special meetings, or other means; to instruct PRS to vote on either recommending approval or rejecting NPRR351 by the January 2012 PRS meeting and to report back to TAC; and to request that ERCOT provide more information to PRS at the 11/17/11 PRS meeting (or prior to the next TAC meeting if the PRS meeting is too soon) about its intentions on how to actually implement this NPRR in regards to wind forecasts, wind base points, ramp rates, State Estimator inputs, Dynamic Ratings, binding constraints, LDLs and HDLs, and the disclosure of forecasted base points to operators and the market. | Passed |
Documents 38
| Name | Type | Posted | Classification |
|---|---|---|---|
| 351NPRR-01 Calculate and Post Projected Non-Binding LMPs for the | doc | Apr 13 '11 | Revision Request |
| 351NPRR-02 ERCOT Comments 051911 | doc | May 19 '11 | Revision Request Comments |
| 351NPRR-03 PRS Report 051911 | doc | May 23 '11 | Committee Report |
| 351NPRR-04 Steel Companies Comments 060911 | doc | Jun 9 '11 | Revision Request Comments |
| 351NPRR-05 PRS Report 062311 | doc | Jun 27 '11 | Committee Report |
| 351NPRR-06 PRS Voting Ballot 062311 | xls | Jun 27 '11 | Revision Request Ballot |
| 351NPRR-07 ERCOT Steel Mills Appeal 070711 | doc | Jul 7 '11 | Revision Request Comments |
| 351NPRR-08 Bob Wittmeyer Comments 080311 | doc | Aug 3 '11 | Revision Request Comments |
| 351NPRR-09 TAC Report 080411 | doc | Aug 8 '11 | Committee Report |
| 351NPRR-10 TAC Voting Ballot 080411 | xls | Aug 5 '11 | Revision Request Ballot |
| 351NPRR-11 PRS Report 081811 | doc | Aug 19 '11 | Committee Report |
| 351NPRR-12 Trefny-Crockett Comments 092011 | doc | Sep 20 '11 | Revision Request Comments |
| 351NPRR-13 Preliminary Impact Analysis 092011 | doc | Sep 20 '11 | Staff Report |
| 351NPRR-14 ERCOT Comments 092111 | doc | Sep 21 '11 | Revision Request Comments |
| 351NPRR-15 PRS Report 092211 | doc | Sep 26 '11 | Committee Report |
| 351NPRR-16 ERCOT Comments 101111 | doc | Oct 11 '11 | Revision Request Comments |
| 351NPRR-17 ERCOT Comments 101311 | doc | Oct 13 '11 | Revision Request Comments |
| 351NPRR-18 WMS Comments 101711 | doc | Oct 17 '11 | Revision Request Comments |
| 351NPRR-19 PRS Report 102011 | doc | Oct 24 '11 | Committee Report |
| 351NPRR-20 PRS Voting Ballot 102011 | xls | Oct 24 '11 | Revision Request Ballot |
| 351NPRR-21 PRS Voting Ballot 102011 | xls | Oct 24 '11 | Revision Request Ballot |
| 351NPRR-22 ERCOT Steel Mills Appeal 102011 | doc | Oct 24 '11 | Legal filings and governance |
| 351NPRR-23 ERCOT Steel Mills Comments 102511 | doc | Oct 25 '11 | Revision Request Comments |
| 351NPRR-24 TIEC Comments 102711 | doc | Oct 27 '11 | Revision Request Comments |
| 351NPRR-25 Champion Energy Services Comments 110111 | doc | Nov 1 '11 | Revision Request Comments |
| 351NPRR-26 ERCOT Steel Mills Comments 110211 | doc | Nov 2 '11 | Revision Request Comments |
| 351NPRR-27 Reliant Energy Retail Services Comments 110211 | doc | Nov 2 '11 | Revision Request Comments |
| 351NPRR-28 TAC Report 110311 | doc | Nov 4 '11 | Committee Report |
| 351NPRR-29 TAC Voting Ballot 110311 | xls | Nov 4 '11 | Revision Request Ballot |
| 351NPRR-30 ERCOT Comments 111611 | doc | Nov 16 '11 | Revision Request Comments |
| 351NPRR-31 PRS Report 111711 | doc | Nov 21 '11 | Committee Report |
| 351NPRR-32 PRS Report 112911 | doc | Dec 1 '11 | Committee Report |
| 351NPRR-33 PRS Voting Ballot 112911 | xls | Nov 29 '11 | Revision Request Ballot |
| 351NPRR-34 PRS Voting Ballot 112911 | xls | Nov 29 '11 | Revision Request Ballot |
| 351NPRR-35 Impact Analysis 113011 | doc | Nov 30 '11 | Staff Report |
| 351NPRR-36 TAC Report 120111 | doc | Dec 1 '11 | Committee Report |
| 351NPRR-37 TAC Voting Ballot 120111 | xls | Dec 1 '11 | Revision Request Ballot |
| 351NPRR-38 Board Report 121211 | doc | Dec 12 '11 | Committee Report |
Meetings That Took It Up 20
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Nov 27 '12 | Market Enhancement Task Force (METF) Meeting | METF | Concluded |
| Aug 30 '12 | Market Enhancement Task Force (METF) Meeting | METF | Concluded |
| Jun 13 '12 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| May 9 '12 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| Dec 12 '11 | Board of Directors Meeting | BOARD | Concluded |
| Dec 1 '11 | TAC Meeting | TAC | Concluded |
| Nov 29 '11 | Special PRS Meeting | PRS | Concluded |
| Nov 28 '11 | Special WMS Meeting - Look-ahead SCED | WMS | Concluded |
| Nov 17 '11 | PRS Meeting | PRS | Concluded |
| Nov 3 '11 | TAC Meeting | TAC | Concluded |
| Oct 20 '11 | PRS Meeting | PRS | Concluded |
| Oct 12 '11 | WMS Meeting | WMS | Concluded |
| Oct 11 '11 | QMWG Meeting | QMWG | Concluded |
| Sep 22 '11 | PRS Meeting | PRS | Concluded |
| Sep 21 '11 | RMS Meeting | RMS | Concluded |
| Aug 18 '11 | PRS Meeting | PRS | Concluded |
| Aug 4 '11 | TAC Meeting | TAC | Concluded |
| Jul 7 '11 | TAC Meeting | TAC | Concluded |
| Jun 23 '11 | PRS Meeting | PRS | Concluded |
| May 19 '11 | PRS Meeting | PRS | Concluded |