NPRR868  As-Built Hub and Load Zone Calculation

Approved Urgent sponsor ERCOT posted 2018-03-01 ercot.com
ReasonAddresses current operational issues
Created2018-03-08
Approved2018-04-10
Sections Affected
2.13.43.5.2.13.5.2.23.5.2.33.5.2.43.5.2.64.5.14.6.1.2and 7.5.1
Summary
This NPRR modifies the Hub Bus and Load Zone definitions and price calculations to account for the current usage of power flow buses as opposed to Electrical Buses in the DAM and CRR Auction systems. In some cases there can be differences between power flow buses and Electrical Buses, and it is more suitable for power flow buses to be used. Real-Time currently uses Electrical Buses for the Hub and Load Zone calculations. Further, the rewritten formulas provide clarification for the scenario when buses are de-energized in contingency analysis.
Action Log 3 milestones
Documents 5
NameTypePostedClassification
868NPRR-01 As Built Hub and Load Zone Calculation 030118 docx Mar 1 '18 Revision Request
868NPRR-02 Impact Analysis 030118 doc Mar 1 '18 Staff Report
868NPRR-03 PRS Report 030818 docx Mar 9 '18 Committee Report
868NPRR-04 TAC Report 032218 docx Mar 22 '18 Committee Report
868NPRR-05 Board Report 041018 docx Apr 10 '18 Committee Report
Meetings That Took It Up 3