NPRR #1066 · Revision Request
NPRR1066 Interconnection of Existing Generation Owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) Transferring Load into the ERCOT System
ReasonAddresses current operational issues
Created2021-02-11
Approved2021-04-13
Sections Affected
1.6.5 and 7.4
Summary
This Nodal Protocol Revision Request (NPRR) grants ERCOT the discretion to apply existing standards that are applicable to older Generation Resources registered with ERCOT (a “grandfathered” standard) to an existing generation unit owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) that is transferring Load into ERCOT and seeks to interconnect the existing generation unit to the ERCOT Transmission Grid in conjunction with the Load transfer. ERCOT will only apply a grandfathered standard if the MOU or EC provides a written explanation as to why it cannot comply with the standard imposed on new Generation Resources, and demonstrates to ERCOT’s satisfaction that allowing the generation unit to comply with the grandfathered standard is reasonable and will not create a risk to reliability of the ERCOT System. This NPRR also clarifies that, should an MOU or EC interconnect an older generation unit to the ERCOT Transmission System as part of a Load integration, the unit will not qualify the MOU or EC to receive Pre-Assigned Congestion Revenue Rights (PCRRs).
Action Log 4 milestones
-
Feb 11
PRSRecommended for Approval→ Impact Analysis Consideration
-
Mar 11
PRSRecommended for Approval→ Revision Request Consideration
-
Mar 24
TACRecommended for Approval→ Revision Request Consideration
-
Apr 13
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Feb 11 '21 | PRS | to recommend approval of NPRR1066 as revised by PRS | Passed |
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Mar 24 '21 | TAC | Motion Passes | 29 | 0 | 0 | xls |
| Mar 11 '21 | PRS | Motion Carries | 6 | 0 | 0 | xls |
| Feb 11 '21 | PRS | Motion Carries | 7 | 0 | 2 | xls |
Documents 9
| Name | Type | Posted | Classification |
|---|---|---|---|
| 1066NPRR-01 Interconnection of Existing Generation Owned by MOU or EC Transferring Load into ERCOT System 012721 | doc | Jan 27 '21 | Revision Request |
| 1066NPRR-02 Impact Analysis 012721 | doc | Jan 27 '21 | Staff Report |
| 1066NPRR-03 PRS Ballot 021121 | xls | Feb 15 '21 | Revision Request Ballot |
| 1066NPRR-04 PRS Report 021121 | doc | Feb 15 '21 | Committee Report |
| 1066NPRR-05 PRS Ballot 031121 | xls | Mar 16 '21 | Revision Request Ballot |
| 1066NPRR-06 PRS Report 031121 | doc | Mar 16 '21 | Committee Report |
| 1066NPRR-07 TAC Ballot 032421 | xls | Mar 29 '21 | Revision Request Ballot |
| 1066NPRR-08 TAC Report 032421 | doc | Mar 29 '21 | Committee Report |
| 1066NPRR-09 Board Report 041321 | doc | Apr 16 '21 | Committee Report |
Meetings That Took It Up 4
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Apr 13 '21 | Urgent Board of Directors Meeting – Teleconference Available by Webcast | BOARD | Concluded |
| Mar 24 '21 | TAC Meeting by Webex Only | TAC | Concluded |
| Mar 11 '21 | PRS Meeting by Webex Only | PRS | Concluded |
| Feb 11 '21 | PRS Meeting by Webex Only | PRS | Concluded |