NPRR #483 · Revision Request
NPRR483 REC Program Renewable Resource Self-Reporting MWH Production Data and Metering Requirements
- PRS Nov 15 '12
- TAC Nov 29 '12
- BOARD Dec 11 '12
- PUCT —
ReasonThis NPRR aligns the Protocols with P.U.C. Subst. R. 25.173, Goal for Renewable Energy, in regards to awarding RECs to renewable All-Inclusive Generation Resources for MWh production. Metering that is located at the ERCOT Point of Interconnection (POI) records net energy flows and there are instances in which the output from a renewable All-Inclusive Generation Resource serves on-site Load. If generation data is in the ERCOT Settlement systems for a renewable All-Inclusive Generation Resource, current Protocol language has a requirement that the data be utilized for awarding RECs. In instances where on-site Load is being served by the renewable All-Inclusive Generation Resource, the data in ERCOT Settlement systems would not account for all the MWh production data.
Created2012-10-18
Approved2012-12-11
Sections Affected
14.5.1
Summary
This Nodal Protocol Revision Request (NPRR) provides an option for a renewable All-Inclusive Generation Resource to self-report quarterly MWh production data to ERCOT for use in the Renewable Energy Credit (REC) Program. In addition, this NPRR establishes metering requirements for any renewable All-Inclusive Generation Resource choosing to self-report MWh production data for use in the REC Trading Program.
Timeline
- Sep 14
-
Oct 18
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Amended by the Sep 20 '12 CenterPoint Energy comments“To recommend approval of NPRR483 as amended by the 9/20/12 CenterPoint Energy comments.” — Passed→ PRS for Impact Analysis review.
-
Nov 15
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Forwarded → TAC“To endorse and forward the 10/18/12 PRS Report and Impact Analysis for NPRR483 to TAC.” — Passed→ TAC for consideration.
-
Nov 29
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval“To recommend approval of NPRR483 as recommended by PRS in the 11/15/12 PRS Report.” — Passed→ ERCOT Board for consideration.
-
Dec 11
BOARD Board of Directors MeetingBOARDApproved“To approve NPRR483 as recommended by TAC in the 11/29/12 TAC Report.” — Passed
-
—
Posted since the last meeting