NPRR #483 · Revision Request

NPRR483  REC Program Renewable Resource Self-Reporting MWH Production Data and Metering Requirements

Approved sponsor ERCOT posted 2012-09-14 ercot.com
ReasonThis NPRR aligns the Protocols with P.U.C. Subst. R. 25.173, Goal for Renewable Energy, in regards to awarding RECs to renewable All-Inclusive Generation Resources for MWh production. Metering that is located at the ERCOT Point of Interconnection (POI) records net energy flows and there are instances in which the output from a renewable All-Inclusive Generation Resource serves on-site Load. If generation data is in the ERCOT Settlement systems for a renewable All-Inclusive Generation Resource, current Protocol language has a requirement that the data be utilized for awarding RECs. In instances where on-site Load is being served by the renewable All-Inclusive Generation Resource, the data in ERCOT Settlement systems would not account for all the MWh production data.
Created2012-10-18
Approved2012-12-11
Sections Affected
14.5.1
Summary
This Nodal Protocol Revision Request (NPRR) provides an option for a renewable All-Inclusive Generation Resource to self-report quarterly MWh production data to ERCOT for use in the Renewable Energy Credit (REC) Program. In addition, this NPRR establishes metering requirements for any renewable All-Inclusive Generation Resource choosing to self-report MWh production data for use in the REC Trading Program.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Oct 18 '12PRS To recommend approval of NPRR483 as amended by the 9/20/12 CenterPoint Energy comments.Passed
Documents 7
NameTypePostedClassification
483NPRR-01 REC Program Renewable Resource Self-Reporting MWH Pro doc Sep 14 '12 Revision Request
483NPRR-02 Impact Analysis 091412 doc Sep 14 '12 Staff Report
483NPRR-03 CenterPoint Energy Comments 092012 doc Sep 20 '12 Revision Request Comments
483NPRR-04 PRS Report 101812 doc Oct 23 '12 Committee Report
483NPRR-05 PRS Report 111512 doc Nov 20 '12 Committee Report
483NPRR-06 TAC Report 112912 doc Nov 30 '12 Committee Report
483NPRR-07 Board Report 121112 doc Dec 13 '12 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Dec 11 '12 Board of Directors Meeting BOARD Concluded
Nov 29 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Nov 15 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded