NPRR #912 · Revision Request

NPRR912  Settlement of Switchable Generation Resources (SWGRs) Instructed to Switch to ERCOT

Approved sponsor ERCOT posted 2018-11-28 ercot.com
ReasonAddresses current operational issues; Market efficiencies or enhancements
Created2018-12-13
Approved2019-04-09
Sections Affected
2.25.5.25.7.4.1.15.7.7 (new)6.6.12 (new)6.6.12.1 (new)6.6.12.2 (new)6.6.12.3 (new)6.7.5and 9.14.9 (new)
Summary
This Nodal Protocol Revision Request (NPRR) addresses the Settlement of Switchable Generation Resources (SWGRs) that receive a Reliability Unit Commitment (RUC) instruction to switch from a non-ERCOT Control Area to the ERCOT Control Area. The NPRR provides a Make-Whole Payment for a SWGR when the SWGR’s Real-Time revenues in ERCOT are not sufficient to cover certain specified costs the SWGR may have incurred in complying with such a RUC instruction. As proposed in this NPRR, eligible costs include costs of starting up and operating, energy and Ancillary Service imbalance charges assessed by the non-ERCOT Control Area Operator, and additional fuel costs directly attributable to the switch. SWGRs may recover incremental startup and operating costs above those described below based on proxy costs created by ERCOT if the SWGR does not have approved verifiable costs. The SWGR Make-Whole Payment will include costs to shutdown in the non-ERCOT grid, start in ERCOT, shutdown in ERCOT, and re-start in the non-ERCOT grid, when the SWGR switches back to the non-ERCOT control area within 24 hours of being released from the RUC. To qualify for the Make-Whole Payment, the SWGR must be operating in the non-ERCOT Control Area at the time ERCOT issues the RUC instruction. Qualified Scheduling Entities (QSEs) representing SWGRs must file a Settlement and billing dispute to trigger the Make-Whole Payment calculation. Finally, ERCOT has included language that would codify ERCOT’s intention to issue a switch directive to an SWGR only in the limited circumstances in which both the SWGR is needed to address an actual or anticipated Emergency Condition and the non-ERCOT Control Area Operator has released the SWGR to ERCOT.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Feb 14 '19PRS to recommend approval of NPRR912 as amended by the 2/7/19 WMS commentsPassed
Mar 14 '19PRS to endorse and forward to TAC the 2/14/19 PRS Report as revised by PRS and the Impact Analysis for NPRR912Passed
Documents 18
NameTypePostedClassification
912NPRR-01 Settlement of SWGRs Instructed to Switch to ERCOT 112818 doc Nov 28 '18 Revision Request
912NPRR-02 Impact Analysis 112818 doc Nov 28 '18 Staff Report
912NPRR-03 Tenaska Energy Comments 121318 doc Dec 13 '18 Revision Request Comments
912NPRR-04 PRS Report 121318 doc Dec 14 '18 Committee Report
912NPRR-05 Tenaska Energy Comments 010419 doc Jan 4 '19 Revision Request Comments
912NPRR-06 GSEC Comments 010719 doc Jan 7 '19 Revision Request Comments
912NPRR-07 TCPA Comments 010819 doc Jan 8 '19 Revision Request Comments
912NPRR-08 ERCOT Comments 010819 doc Jan 8 '19 Revision Request Comments
912NPRR-09 WMS Comments 011019 doc Jan 10 '19 Revision Request Comments
912NPRR-10 Joint Comments 020419 doc Feb 4 '19 Revision Request Comments
912NPRR-11 Tenaska Comments 020519 doc Feb 5 '19 Revision Request Comments
912NPRR-12 ERCOT Comments 020619 doc Feb 6 '19 Revision Request Comments
912NPRR-13 WMS Comments 020719 doc Feb 7 '19 Revision Request Comments
912NPRR-14 WMS Voting Ballot 020719 xls Feb 7 '19 Revision Request Ballot
912NPRR-15 PRS Report 021419 doc Feb 18 '19 Committee Report
912NPRR-16 PRS Report 031419 doc Mar 19 '19 Committee Report
912NPRR-17 TAC Report 032719 doc Mar 28 '19 Committee Report
912NPRR-18 Board Report 040919 doc Apr 12 '19 Committee Report
Meetings That Took It Up 10
DateMeetingCommitteeStatus
May 6 '19 CMWG Meeting CMWG Concluded
Apr 9 '19 Board of Directors Meeting BOARD Concluded
Mar 27 '19 TAC Meeting TAC Concluded
Mar 14 '19 PRS Meeting PRS Concluded
Feb 14 '19 PRS Meeting PRS Concluded
Feb 6 '19 WMS Meeting WMS Concluded
Jan 25 '19 WMWG Meeting WMWG Concluded
Jan 17 '19 PRS Meeting PRS Concluded
Jan 9 '19 WMS Meeting WMS Concluded
Dec 13 '18 PRS Meeting PRS Concluded