NPRR #487 · Revision Request
NPRR487 QSGR Dispatch Adjustment
ReasonThe amount of time that QSGRs are being called upon to resolve congestion has highlighted a localized Locational Marginal Price (LMP) formation problem that this NPRR seeks to resolve. When a transmission constraint becomes active in SCED that requires a Base Point to a QSGR that is less than its physical Low Sustained Limit (LSL) (e.g., Base Point to 5 MW when its physical LSL is 45 MW), the QSGR is brought On-Line to its physical LSL within ten minutes to comply with the Base Point. The LMP at the QSGR bus when the initial positive Base Point is issued corresponds to the Mitigated Offer Cap of the QSGR (assuming the constraint is non-competitive); however, after the QSGR reaches its physical LSL, SCED will often no longer bind for long periods of time on the transmission constraint (i.e. the constraint becomes "inactive") because the amount of generation needed at the QSGR site to resolve the constraint was less than the physical LSL of the QSGR (e.g., 40 MW less using the 5 MW Base Point and 45 MW LSL described above). While this situation is occurring, LMPs at the QSGR site are clearing below the Mitigated Offer Cap of the QSGR, which means the QSGR is likely operating at a short-run marginal cost loss to allow SCED to manage congestion. With the 9/12/12 WMS vote to revise the Verifiable Cost Manual formula that establishes the Mitigated Offer Cap for QSGRs to amortize a QSGR’s start cost across all hours of historic run time during a defined period, including those at which it was being called upon to operate at a short-run marginal cost loss for the reasons outlined above, it is important to correct this localized pricing problem as quickly as possible.
Created2012-10-18
Approved2013-03-19
Sections Affected
3.8.36.6.5.38.1.1.4.1
Summary
This Nodal Protocol Revision Request (NPRR) modifies the emergency energy Settlement treatment of a Quick Start Generation Resource (QSGR) that is brought On-Line with a Base Point less than or equal to its Resource registration applicable Seasonal net minimum sustainable rating. The changes remove the limitation for compensation using an Energy Offer Curve price that is capped by the Mitigated Offer Cap (adjusted to include variable Operations and Maintenance (O&M)). Currently the limitation is two "q" Settlement Intervals. The NPRR would allow this compensation until Security-Constrained Economic Dispatch (SCED) no longer needs the QSGR to generate, subject to performance of the QSGR Decommitment Decision Process. The NPRR also details the QSGR Decommitment Decision Process.
Action Log 7 milestones
-
Oct 18
PRSRecommended for Approval→ PRS for Impact Analysis review.
-
Nov 15
PRSDeferred/Tabled→ PRS for consideration.
-
Dec 13
PRSDeferred/Tabled→ PRS for consideration.
-
Jan 17
PRSRecommended for Approval→ TAC Consideration
-
Feb 7
TACRecommended for Approval→ TAC for review of the Impact Analysis.
-
Mar 7
TACRecommended for Approval→ ERCOT Board for consideration.
-
Mar 19
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Jan 17 '13 | PRS | To endorse and forward the 12/13/12 PRS Report as amended by the 1/17/13 Luminant Energy Company LLC comments to TAC | Passed |
| Feb 7 '13 | TAC | To recommend approval of NPRR487 as recommended by PRS in the 1/17/13 PRS Report, as amended by the 2/6/13 Luminant Energy Company LLC comments and as revised by TAC; and to request that a revised Impact Analysis be brought back to TAC for consideration. | Passed |
Documents 21
| Name | Type | Posted | Classification |
|---|---|---|---|
| 487NPRR-01 QSGR Dispatch Adjustment 100312 | doc | Oct 3 '12 | Revision Request |
| 487NPRR-02 WMS Comments 101212 | doc | Oct 12 '12 | Revision Request Comments |
| 487NPRR-03 ERCOT Comments 101712 | doc | Oct 17 '12 | Revision Request Comments |
| 487NPRR-04 PRS Report 101812 | doc | Oct 23 '12 | Committee Report |
| 487NPRR-05 Luminant Energy Company LLC 110812 | doc | Dec 11 '12 | Revision Request Comments |
| 487NPRR-06 Impact Analysis 110812 | doc | Nov 8 '12 | Staff Report |
| 487NPRR-07 ERCOT Comments 111312 | doc | Nov 13 '12 | Revision Request Comments |
| 487NPRR-08 PRS Report 111512 | doc | Nov 20 '12 | Committee Report |
| 487NPRR-09 Luminant Energy Company LLC 121012 | doc | Dec 11 '12 | Revision Request Comments |
| 487NPRR-10 ERCOT Comments 121312 | doc | Dec 13 '12 | Revision Request Comments |
| 487NPRR-11 PRS Report 121312 | doc | Dec 18 '12 | Committee Report |
| 487NPRR-12 ERCOT Comments 011613 | doc | Jan 16 '13 | Revision Request Comments |
| 487NPRR-13 Citigroup Energy, Inc. Comments 011613 | doc | Jan 16 '13 | Revision Request Comments |
| 487NPRR-14 Luminant Energy Company LLC Comments 011713 | doc | Jan 17 '13 | Revision Request Comments |
| 487NPRR-15 PRS Report 011713 | doc | Jan 22 '13 | Committee Report |
| 487NPRR-16 ERCOT Comments 020413 | doc | Feb 4 '13 | Revision Request Comments |
| 487NPRR-17 Luminant Energy Company LLC Comments 020613 | doc | Feb 6 '13 | Revision Request Comments |
| 487NPRR-18 TAC Report 020713 | doc | Feb 11 '13 | Committee Report |
| 487NPRR-19 Revised Impact Analysis 022813 | doc | Feb 28 '13 | Staff Report |
| 487NPRR-20 TAC Report 030713 | doc | Mar 7 '13 | Committee Report |
| 487NPRR-21 Board Report 031913 | doc | Mar 21 '13 | Committee Report |
Meetings That Took It Up 9
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Mar 19 '13 | Board of Directors Meeting | BOARD | Concluded |
| Mar 7 '13 | Technical Advisory Committee (TAC) Meeting | TAC | Concluded |
| Feb 7 '13 | Technical Advisory Committee (TAC) Meeting | TAC | Concluded |
| Jan 17 '13 | Protocol Revision Subcommittee (PRS) Meeting | PRS | Concluded |
| Dec 13 '12 | Protocol Revision Subcommittee (PRS) Meeting | PRS | Concluded |
| Nov 15 '12 | Protocol Revision Subcommittee (PRS) Meeting | PRS | Concluded |
| Oct 18 '12 | Protocol Revision Subcommittee (PRS) Meeting | PRS | Concluded |
| Oct 10 '12 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| Oct 8 '12 | Qualified Scheduling Entity Managers Working Group (QMWG) Meeting | QMWG | Concluded |