ERCOT·WATCH Search ercot.com  ⌕
NPRR #451 · Revision Request

NPRR451  Implementation of New P.U.C. Subst. Rule 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Response Service (ERS)

Approved Urgent sponsor ERCOT posted 2012-03-15 ercot.com
ReasonProject 39948 proposes a repeal of P.U.C. Subst. Rule 25.507 provisions governing EILS, to be replaced with the renamed product Emergency Response Service (ERS). The purpose of ERS, as stated in the Project 39948, is to "promote reliability during energy emergencies through provisions that provide ERCOT flexibility in the implementation and administration of ERS." A large portion of the existing Protocols related to EILS will be maintained over the transition to ERS. The most significant changes enabled by the new P.U.C. Subst. Rule 25.507 and by this NPRR are as follows: Allows participation by generators and defines the types of generation units that will be eligible to participate and establishes performance criteria for deployment events, availability, and testing. The minimum amount that may be offered for ERS is changed from one MW to one-tenth (0.1) MW. The current ceiling of 1,000 MW for procurement of ERS is removed. Establishes processes for enabling ERCOT to initiate additional ERS Contract Periods in cases where ERS Resources’ obligations are exhausted, such as they were during the February 2-3, 2011, EILS deployment. Qualified Scheduling Entities (QSEs) will be allowed to designate ERS Resources for automatic renewal, under similar terms as the original contract, in order to maintain the maximum number of reliability tools during sustained weather events or other capacity-short situations. Creates a more equitable system for compliance with the Protocols by requiring ERCOT to evaluate QSE ERS portfolio performance as the first step in determining compliance. Deletes Appendices A and B of Section 22G - The provisions of these contract-related documents are adequately covered elsewhere and are not required to be part of the Nodal Protocols.
Created2012-03-22
Approved2012-04-17
Sections Affected
2.12.13.143.14.33.14.3.1 (new)3.14.3.2 (new)3.14.3.3 (new)3.14.3.4 (new)6.5.9.46.5.9.4.26.5.9.4.36.6.116.6.11.16.6.11.28.1.38.1.3.18.1.3.1.1 (new)8.1.3.1.2 (new)8.1.3.1.3 (new)8.1.3.1.3.1 (new)8.1.3.1.3.2 (new)8.1.3.1.3.3 (new)8.1.3.1.4 (new)8.1.3.2
Summary
This NPRR is required to implement the provisions of the newly revised P.U.C. Subst. R. 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Interruptible Load Service (EILS). Project 39948, Rulemaking to Electric Reliability Council of Texas (ERCOT) Emergency Interruptible Load Service (EILS), was adopted by the Public Utility Commission of Texas (PUCT) on March 22, 2012.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Mar 29 '12PRS To recommend approval of NPRR451 as amended by the 3/27/12 ERCOT comments as revised by PRS and to forward NPRR451 to TACPassed
Apr 5 '12TAC To recommend approval of NPRR451 as recommended by PRS in the 3/29/12 PRS Report and as amended by the 4/3/12 ERCOT commentsPassed
Apr 17 '12BOARD To approve NPRR451 as recommended by TAC in the 4/5/12 TAC Report and as amended by the 4/9/12 ERCOT commentsPassed
Documents 19
NameTypePostedClassification
451NPRR-01 Implementation of New P.U.C. Subst. Rule 25.507, Elec doc Mar 15 '12 Revision Request
451NPRR-02 Impact Analysis 031512 doc Mar 15 '12 Staff Report
451NPRR-03 Austin Energy Comments 031812 doc Mar 19 '12 Revision Request Comments
451NPRR-04 Sierra Club, Lone Star Chapter Comments 031912 doc Mar 19 '12 Revision Request Comments
451NPRR-05 Oncor Comments 032112 doc Mar 21 '12 Revision Request Comments
451NPRR-06 NRG Companies Comments 032112 doc Mar 21 '12 Revision Request Comments
451NPRR-07 PRS Report 032212 doc Mar 23 '12 Committee Report
451NPRR-08 Energyconnect Inc Comments 032712 doc Mar 27 '12 Revision Request Comments
451NPRR-09 ERCOT Comments 032712 doc Mar 27 '12 Revision Request Comments
451NPRR-10 Sierra Club, Lone Star Chapter Comments 032812 doc Mar 28 '12 Revision Request Comments
451NPRR-11 Public Citizen, Inc. Comments 032812 doc Mar 28 '12 Revision Request Comments
451NPRR-12 North America Power Partners Comments 032812 doc Mar 28 '12 Revision Request Comments
451NPRR-13 PRS Report 032912 doc Mar 29 '12 Committee Report
451NPRR-14 ERCOT Comments 040312 doc Apr 3 '12 Revision Request Comments
451NPRR-15 Enchanted Rock Reliability Services, LLC. Comments 04 doc Apr 3 '12 Revision Request Comments
451NPRR-16 Enchanted Rock Reliability Services, LLC. Comments 04 doc Apr 4 '12 Revision Request Comments
451NPRR-17 TAC Report 040512 doc Apr 5 '12 Committee Report
451NPRR-18 ERCOT Comments 040912 doc Apr 9 '12 Revision Request Comments
451NPRR-19 Board Report 041712 doc Apr 18 '12 Committee Report
Meetings That Took It Up 9
DateMeetingCommitteeStatus
Jun 12 '12 Dynamics Working Group (DWG) Meeting DWG Concluded
Jun 7 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Apr 18 '12 Operations Working Group (OWG) Meeting OWG Concluded
Apr 16 '12 Board of Directors Meeting BOARD Concluded
Apr 12 '12 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Apr 5 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Mar 30 '12 Demand Side Working Group (DSWG) Meeting DSWG Concluded
Mar 29 '12 Special Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Mar 22 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded