NPRR #640 · Revision Request

NPRR640  As-Built Clarification of Load Resource Participation in SCED and Non-Spin Qualification

Approved sponsor ERCOT posted 2014-07-10 ercot.com
ReasonClarifies and aligns Protocol language with current ERCOT systems and processes.
Created2014-08-14
Approved2014-12-09
Sections Affected
3.6.18.1.1.2.1.3
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that a Qualified Scheduling Entity (QSE) representing a Load Resource and submitting a bid to buy for participation in Security-Constrained Economic Dispatch (SCED) must also represent all Load Serving Entities (LSEs) for all sites within the Load Resource. The NPRR also aligns Section 8.1.1.2.1.3 with the current requirement that a Load Resource may only qualify to provide Non-Spinning Reserve (Non-Spin) if they are a Controllable Load Resource qualified to participate in SCED.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Sep 11 '14PRS To recommend approval of NPRR640 as amended by the 9/2/14 ERCOT commentsPassed
Documents 8
NameTypePostedClassification
640NPRR-01 As-Built Clarification of Load Resource SCED Particip doc Jul 10 '14 Revision Request
640NPRR-02 Impact Analysis 071014 doc Jul 10 '14 Staff Report
640NPRR-03 PRS Report 081414 doc Aug 18 '14 Committee Report
640NPRR-04 ERCOT Comments 090214 doc Sep 2 '14 Revision Request Comments
640NPRR-05 PRS Report 091114 doc Sep 15 '14 Committee Report
640NPRR-06 PRS Report 100914 doc Oct 13 '14 Committee Report
640NPRR-07 TAC Report 102314 doc Oct 24 '14 Committee Report
640NPRR-08 Board Report 120914 doc Dec 9 '14 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Dec 9 '14 Board of Directors Meeting BOARD Concluded
Oct 23 '14 TAC Meeting TAC Concluded
Oct 9 '14 PRS Meeting PRS Concluded
Sep 17 '14 Joint CWG/MCWG Meeting CREDITWG Concluded
Sep 11 '14 PRS Meeting PRS Concluded
Aug 14 '14 PRS Meeting PRS Concluded