NPRR #1077 · Revision Request
NPRR1077 Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs
- PRS Nov 10 '21
- TAC Nov 29 '21
- BOARD Dec 10 '21
- PUCT Dec 16 '21
ReasonAddresses current operational issues; Market efficiencies or enhancements
Created2021-06-10
Approved2021-12-16
Sections Affected
2.12.23.8.76.3.26.5.5.2and 16.11.4.3.2
Summary
This Nodal Protocol Revision Request (NPRR) expands the Self-Limiting Facility concept introduced in NPRR1026, BESTF-7 Self-Limiting Facilities, to include sites with one or more Settlement Only Generators (SOGs). This NPRR also introduces a number of additional revisions to fully address requirements for generators and Energy Storage Systems (ESSs) that are connected at distribution voltage. In order to ensure that SOGs in Self-Limiting Facilities abide by established MW Injection and MW Withdrawal limits, and in order to ensure that ERCOT operators and system planners have clear visibility into the performance of SOGs, this NPRR requires the Qualified Scheduling Entity (QSE) for any SOG to provide telemetry of the injection or withdrawal at the Point of Interconnection (POI) (for transmission-connected sites) or Point of Common Coupling (POCC) (for distribution-connected sites) as well as telemetry of gross real power injection and withdrawal at the generator terminals and the status of each SOG’s breaker. Self-Limiting Facilities that include SOGs would be subject to the same consequences as other Self-Limiting Facilities when the MW Injection or MW Withdrawal limit is exceeded.
Timeline
- May 19
- Jun 3
-
Jun 10
PRS PRS Meeting by Webex OnlyPRSDeferred/Tabled Referred → ROS Referred → WMS“To table NPRR1077 and refer the issue to ROS and WMS” — Passed→ Language Consideration
- Jun 15
-
Jun 21
Listed without action at 3 meetings (Jun 21 '21 – Jul 8 '21)
- Jul 13
-
Jul 15
Listed without action at 2 meetings (Jul 15 '21 – Jul 22 '21)
- Aug 4
-
Aug 5
Listed without action at 2 meetings (Aug 5 '21 – Aug 12 '21)
- Aug 19
-
Aug 20
Listed without action at 1 meeting
- Sep 1
- Sep 2
- Sep 16
-
Oct 7
Listed without action at 1 meeting
-
Oct 14
PRS PRS Meeting by Webex OnlyPRSRecommended for Approval Amended by the Aug 16 '21 ERCOT comments“To recommend approval of NPRR1077 as amended by the 8/16/21 ERCOT comments” — Passed→ Impact Analysis Consideration
-
Nov 10
PRS PRS Meeting by Webex OnlyPRSRecommended for Approval Forwarded → TAC priority 2022 · rank 3550“To endorse and forward to TAC the 10/14/21 PRS Report and Revised Impact Analysis for NPRR1077 with a recommended priority of 2022 and rank of 3550”→ Revision Request Consideration
-
Nov 29
TAC TAC Meeting by Webex OnlyTACRecommended for Approval Amended by the Nov 22 '21 ERCOT comments“To recommend approval of NPRR1077 as recommended by PRS in the 11/10/21 PRS Report as amended by the 11/22/21 ERCOT comments.” — Passed→ Revision Request Consideration
-
Dec 10
BOARDEmail Vote / Unlisted MeetingBOARDRecommended for Approval“to recommend approval of NPRR1077 as recommended by TAC in the 11/29/21 TAC Report.” — Passed→ Revision Request Consideration
-
Dec 16
PUCTPUCTApproved“to approve NPRR1077 and accompanying ERCOT Market Impact Statement as presented in Project No. 52307, Review of Rules Adopted by the Independent Organization in Calendar Year 2021” — Passed