ERCOT·WATCH Search ercot.com  ⌕
NPRR #91 · Revision Request

NPRR091  Scarcity Pricing and Mitigated Offer Cap During the Period Commencing on the Nodal Market Implementation Date and Continuing for a Total of 45 Days

Approved sponsor TPTF posted 2007-12-05 ercot.com
Reason(1) The purpose of these changes is to add safeguards during an initial shake-down period of nodal market operations to limit the economic consequences of bids and offers as reflected in the Day Ahead Market (DAM) and Real Time Settlement Point Prices. The shake-down period has been selected to allow Market Participants sufficient time to build experience by becoming familiar with the operation of the DAM and Real Time nodal market systems. The methodology selected implements the safeguards described in this NPRR by utilizing the existing ERCOT nodal system designs and will not, and are not intended, to require ERCOT to change or modify the market system design. In all cases, either during this shake-down period or during normal operation of the nodal market systems, all DAM and Adjustment Period and Real Time Energy Offers and DAM Ancillary Service Offers are validated against the SWCAP to assure that no offers used in the nodal price calculations for energy or ancillary service capacity exceed the SWCAP in both the DAM and Real Time Market. Therefore, no special changes are required to the functionality of ERCOT or Market Participant systems during the initial shake-down period or upon its expiration and the assumption of normal system operations. (2) This NPRR creates a set of offer caps for the 45 day period after Nodal startup. (3) This NPRR incorporates the concept into the Nodal Protocols of the Nodal Startup Transition Rules proposal from the Independent Market Monitor (IMM), which was approved by TPTF on September 25, 2007.(4) This NPRR incorporates into nodal Protocols a set of Nodal Startup Transition Rules in response to the PUCT Chairman Memo of July 28, 2005 (filed in PUCT Project 28500, Activities Related to the Implementation of a Nodal Market for the Electric Reliability Council of Texas) and "requiring cost based offer limitations for an appropriate time period."
Created2007-12-13
Approved2010-08-17
Sections Affected
3.194.4.11.2
Summary
This Nodal Protocol Revision Request (NPRR) adds: (1) A provision to Section 3.19 that all transmission constraints are treated as non-competitive constraints during an initial 45 Operating Day period, beginning with the Texas Nodal Market Implementation Date (TNMID). (2) New Section 4.4.11.2, which requires that the System-Wide Offer Cap (SWCAP) be set to the higher of $180 per MWh or 18 mmBtu per MWh times the Fuel Index Price (FIP) during an initial 45 Operating Day period, beginning with the TNMID, provided that a Market Participant who burns fuel oil rather than natural gas may dispute the use of $180 per MWh or 18 mmBtu heat rate per MWh times FIP if the Generation Resource’s Settlement Point Price does not cover the cost incurred by the Market Participant to provide energy or Ancillary Services. This new section also establishes an Energy Offer Curve floor adjusted to -$50 per MWh.
Action Log 16 milestones
Amendments
DateBodyMotionResult
Jun 3 '10TAC To recommend approval of NPRR091 as amended by the 5/26/10 WMS comments.Passed
Apr 8 '10TAC To recommend approval of NPRR091 as recommended by PRS in the 7/17/08 PRS Report and as amended by the 3/29/10 WMS comments.Passed
Aug 7 '08TAC To table NPRR091 until the TAC meeting following the establishment of a revised Texas Nodal Market Implementation Date.Passed
Ballots
DateBodyResultYesNoAbstain
Feb 4 '10 TAC Motion Fails 8 13 8 xls
Documents 45
NameTypePostedClassification
091NPRR-01 Scarcity Pricing and Mitigated Offer Cap During 12050 doc Dec 5 '07 Revision Request
091NPRR-02 TPTF Vote Tally 112707 xls Dec 5 '07 Revision Request Ballot
091NPRR-03 NRG Texas LLC Comments 121007 doc Dec 10 '07 Revision Request Comments
091NPRR-04 PRS Action Report 121307 doc Dec 17 '07 Committee Report
091NPRR-05 Calpine Comments 121907 doc Dec 19 '07 Revision Request Comments
091NPRR-06 TPTF Vote Tally 121807 xls Dec 20 '07 Revision Request Ballot
091NPRR-07 REP Nodal Group Comments 122007 doc Dec 20 '07 Revision Request Comments
091NPRR-08 NRG Texas Comments 011008 doc Jan 10 '08 Revision Request Comments
091NPRR-09 Credit WG Comments 011408 doc Jan 14 '08 Revision Request Comments
091NPRR-10 PRS Action Report 011708 doc Jan 22 '08 Committee Report
091NPRR-11 City of Dallas Comments 021308 doc Feb 13 '08 Revision Request Comments
091NPRR-12 NRG Texas Comments_021908 doc Feb 19 '08 Revision Request Comments
091NPRR-13 PRS Voting Ballot 022108 xls Feb 21 '08 Revision Request Ballot
091NPRR-14 PRS Recommendtion Report 022108 doc Feb 26 '08 Committee Report
091NPRR-15 Preliminary Impact Analysis Report 031308 doc Mar 13 '08 Staff Report
091NPRR-16 PRS Action Report 032008 doc Mar 25 '08 Committee Report
091NPRR-17 PRS Action Report 052208 doc May 28 '08 Committee Report
091NPRR-18 Preliminary Impact Analysis Report 061308 doc Jun 13 '08 Committee Report
091NPRR-19 Impact Analysis Report 061808 doc Jun 18 '08 Staff Report
091NPRR-20 PRS Recommendation Report 071708 doc Jul 21 '08 Committee Report
091NPRR-21 TAC Action Report 080708 doc Aug 11 '08 Committee Report
091NPRR-22 ERCOT Comments 031009 doc Mar 10 '09 Revision Request Comments
091NPRR-23 TAC Report 010610 doc Jan 7 '10 Committee Report
091NPRR-24 CEO Revision Request Review 012710 doc Jan 27 '10 Revision Request Comments
091NPRR-25 Luminant Comments 012910 doc Jan 29 '10 Revision Request Comments
091NPRR-26 ERCOT Comments 020110 doc Feb 1 '10 Revision Request Comments
091NPRR-27 REP Nodal Group Comments 020110 doc Feb 1 '10 Revision Request Comments
091NPRR-28 Steel Group Comments 020210 doc Feb 2 '10 Revision Request Comments
091NPRR-29 TAC Report 020410 doc Feb 8 '10 Committee Report
091NPRR-30 TAC Voting Ballot 020410 xls Feb 8 '10 Revision Request Ballot
091NPRR-31 Steel Group Comments 021910 doc Feb 19 '10 Revision Request Comments
091NPRR-32 Luminant Comments 022310 doc Feb 23 '10 Revision Request Comments
091NPRR-33 Luminant Comments 022310 doc Feb 23 '10 Revision Request Comments
091NPRR-34 WMS Comments 022510 doc Feb 25 '10 Revision Request Comments
091NPRR-35 TAC Report 030410 doc Mar 8 '10 Committee Report
091NPRR-36 ERCOT Comments 031610 doc Mar 16 '10 Revision Request Comments
091NPRR-37 Luminant Comments 032310 doc Mar 23 '10 Revision Request Comments
091NPRR-38 WMS Comments 032910 doc Mar 29 '10 Revision Request Comments
091NPRR-39 ERCOT Comments 040510 doc Apr 5 '10 Revision Request Comments
091NPRR-40 TAC Report 040810 doc Apr 12 '10 Committee Report
091NPRR-41 WMS Comments 051910 doc May 19 '10 Revision Request Comments
091NPRR-42 WMS Comments 052610 doc May 26 '10 Revision Request Comments
091NPRR-43 TAC Report 060310 doc Jun 4 '10 Committee Report
091NPRR-44 Board Report 061510 doc Jun 17 '10 Committee Report
091NPRR-45 Board Report 081710 doc Aug 17 '10 Committee Report
Meetings That Took It Up 22
DateMeetingCommitteeStatus
Jun 3 '10 TAC Meeting TAC Concluded
May 19 '10 WMS Meeting WMS Concluded
Apr 21 '10 WMS Meeting WMS Concluded
Apr 8 '10 TAC Meeting TAC Concluded
Mar 24 '10 WMS Meeting WMS Concluded
Mar 4 '10 TAC Meeting TAC Concluded
Feb 22 '10 Special WMS Meeting WMS Concluded
Feb 17 '10 WMS Meeting WMS Concluded
Feb 4 '10 TAC Meeting TAC Concluded
Jan 20 '10 WMS Meeting WMS Concluded
Jan 6 '10 TAC Meeting TAC Concluded
Dec 3 '09 TAC Meeting TAC Concluded
Mar 5 '09 TAC Meeting TAC Concluded
Aug 7 '08 TAC Meeting TAC Concluded
Jul 17 '08 PRS Meeting PRS Concluded
Jun 19 '08 PRS Meeting PRS Concluded
May 22 '08 PRS Meeting PRS Concluded
Mar 20 '08 PRS Meeting PRS Concluded
Feb 21 '08 PRS Meeting PRS Concluded
Jan 17 '08 PRS Meeting PRS Concluded
Dec 17 '07 TPTF Meeting TPTF Concluded
Dec 13 '07 PRS Meeting PRS Concluded