ERCOT·WATCH Search ercot.com  ⌕
NPRR #846 · Revision Request

NPRR846  Allow Previously Committed ERS Resources to Participate in MRA Agreements and Other ERS Items

Approved sponsor ERCOT posted 2017-08-25 ercot.com
ReasonAddresses current operational issues; Administrative; Regulatory Requirements
Created2017-09-14
Approved2017-12-12
Sections Affected
2.13.14.3.18.1.3.1.18.1.3.1.28.1.3.1.3.18.1.3.1.3.28.1.3.1.3.38.1.3.1.48.1.3.28.1.3.3.18.1.3.3.2
Summary
This Nodal Protocol Revision Request (NPRR) addresses a number of changes pertaining to the Emergency Response Service (ERS): 1) Allows previously committed ERS Resources to participate in Must-Run Alternative (MRA) Agreements as ordered in Public Utility Commission of Texas (PUCT) Project No. 45927, Rulemaking Regarding Emergency Response Service. 2) Modifies the methodology for evaluating the performance during the first partial interval for ERS Loads on the alternate baseline. The current methodology produces incorrect results when the average Load for the first partial interval is above its maximum base Load, but in reality the Load responded according to the instruction. 3) Provides edits pertaining to the self-serve capacity associated with an ERS Generator. This change is necessary to define the acceptable parameters for self-serve capacity. 4) Adds Protocol language that will set the ERSTESTPF to significantly lower values and in some instances to zero for ERS Resources with three consecutive test failures in a 365 day period. In those instances where the ERSTESTPF are set to zero there will be no ERS payment for these Resources for the Standard Contract Term for which the third test failure occurred. 5) Provides additional administrative changes and clarifications to existing Protocol language pertaining to ERS.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Oct 12 '17PRS To recommend approval of NPRR846 as revised by PRS.Passed
Nov 9 '17PRS To endorse and forward to TAC the 10/12/17 PRS Report as amended by the 11/2/17 ERCOT comments and the Impact Analysis for NPRR846.Passed
Documents 10
NameTypePostedClassification
846NPRR-01 Allow Previously Committed ERS Resources to Participate in MRA Agreements and Other ERS Items 082517 doc Aug 25 '17 Revision Request
846NPRR-02 Impact Analysis 082517 doc Aug 25 '17 Staff Report
846NPRR-03-PRS Report 091417 doc Oct 11 '17 Committee Report
846NPRR-04 WMS Comments 092717 doc Sep 27 '17 Revision Request Comments
846NPRR-05 PRS Report 101217 doc Oct 16 '17 Committee Report
846NPRR-06 ERCOT Comments 103017 doc Oct 30 '17 Revision Request Comments
846NPRR-07 ERCOT Comments 110217 doc Nov 2 '17 Revision Request Comments
846NPRR-08 PRS Report 110917 doc Nov 14 '17 Committee Report
846NPRR-09 TAC Report 113017 doc Dec 1 '17 Committee Report
846NPRR-10 Board Report 121217 doc Dec 13 '17 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Dec 12 '17 Board of Directors Meeting BOARD Concluded
Nov 30 '17 TAC Meeting TAC Concluded
Nov 9 '17 PRS Meeting PRS Concluded
Oct 12 '17 PRS Meeting PRS Concluded
Sep 27 '17 WMS Meeting WMS Concluded
Sep 14 '17 PRS Meeting PRS Concluded