ERCOT·WATCH Search ercot.com  ⌕
NPRR #673 · Revision Request

NPRR673  Correction to Estimated Aggregate Liability (EAL) for a QSE that Represents Neither Load nor Generation

Approved sponsor ERCOT posted 2014-11-26 ercot.com
ReasonAs written in NPRR620, the Initial Estimated Liability (IEL) was defined as a fixed value, and the period for calculation of the IEL was not limited. While this eliminated the problem of certain circumstances where no collateral was required, it also meant that affected Counter-Parties would not receive credit for long positions (to the extent of the Minimum Current Exposure (MCE)), which was not the intent of NPRR620. This NPRR’s correction ensures that affected Counter-Parties can receive credit for long positions while maintaining the MCE.
Created2014-12-11
Approved2015-04-14
Sections Affected
16.11.4.2 and 16.11.4.3
Summary
This Nodal Protocol Revision Request (NPRR) corrects Protocol language introduced by NPRR620, Collateral Requirements for Counter-Parties with No Load or Generation, relating to Qualified Scheduling Entities (QSEs) representing neither Load nor Generation.
Action Log 5 milestones
Documents 9
NameTypePostedClassification
673NPRR-01 Correction to EAL for a QSE that Represents Neither L doc Nov 26 '14 Revision Request
673NPRR-02 Impact Analysis 112614 doc Nov 25 '14 Staff Report
673NPRR-03 PRS Report 121114 doc Dec 12 '14 Committee Report
673NPRR-04 Credit WG Comments 121914 doc Dec 19 '14 Revision Request Comments
673NPRR-05 Credit WG Comments 012615 doc Jan 26 '15 Revision Request Comments
673NPRR-06 PRS Report 021215 doc Feb 13 '15 Committee Report
673NPRR-07 PRS Report 031215 doc Mar 13 '15 Committee Report
673NPRR-08 TAC Report 032615 doc Mar 27 '15 Committee Report
673NPRR-09 Board Report 041415 doc Apr 14 '15 Committee Report
Meetings That Took It Up 8
DateMeetingCommitteeStatus
Apr 14 '15 Board of Directors Meeting BOARD Concluded
Mar 26 '15 TAC Meeting TAC Concluded
Mar 12 '15 PRS Meeting PRS Concluded
Feb 12 '15 PRS Meeting PRS Concluded
Jan 20 '15 CWG/MCWG Meeting CREDITWG Concluded
Jan 15 '15 PRS Meeting PRS Concluded
Dec 12 '14 Joint CWG/MCWG Meeting CREDITWG Concluded
Dec 11 '14 PRS Meeting PRS Concluded