ERCOT·WATCH Search ercot.com  ⌕
NPRR #470 · Revision Request

NPRR470  Real-Time PTP Option Modeling Language Cleanup

Approved Urgent sponsor ERCOT posted 2012-08-02 ercot.com
ReasonAs part of the design and implementation of NPRR322, there were several instances where bill determinant names in the as-implemented design had to be changed from the approved bill determinant names in NPRR322. This NPRR is meant to align Protocol language with as-built systems. This NPRR does not change the original intent of NPPR322.
Created2012-08-23
Approved2012-09-18
Sections Affected
4.6.37.9.1.27.9.1.67.9.2.17.9.2.27.9.2.39.19.1
Summary
This Nodal Protocol Revision Request (NPRR) changes certain billing determinant names to align the Protocols with as-built systems to reflect the implementation of NPRR322, Real-Time PTP Option Modeling, which was approved by the ERCOT Board on June 21, 2011.
Action Log 3 milestones
Amendments
DateBodyMotionResult
Aug 23 '12PRS To recommend approval of NPRR470 as amended by the 8/6/12 ERCOT comments.Passed
Documents 7
NameTypePostedClassification
470NPRR-01 Real-Time PTP Option Modeling Language Cleanup 080212 doc Aug 2 '12 Revision Request
470NPRR-02 Impact Analysis 080212 doc Aug 2 '12 Staff Report
470NPRR-03 ERCOT Comments 080612 doc Aug 6 '12 Revision Request Comments
470NPRR-04 WMS Comments 081612 doc Aug 16 '12 Revision Request Comments
470NPRR-05 PRS Report 082312 doc Aug 27 '12 Committee Report
470NPRR-06 TAC Report 090712 doc Sep 7 '12 Committee Report
470NPRR-07 Board Report 091812 doc Sep 18 '12 Committee Report
Meetings That Took It Up 8
DateMeetingCommitteeStatus
Jan 15 '13 Board of Directors Meeting BOARD Concluded
Jan 3 '13 Technical Advisory Committee (TAC) Meeting TAC Concluded
Dec 13 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Sep 18 '12 Board of Directors Meeting BOARD Concluded
Sep 7 '12 Technical Advisory Committee (TAC) Meeting TAC Concluded
Aug 29 '12 Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting MCWG Concluded
Aug 23 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Aug 15 '12 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded