ERCOT·WATCH Search ercot.com  ⌕
NPRR #854 · Revision Request

NPRR854  NOIE TDSP Submittal of Meters with Bidirectional Flow Caused by Generation Interconnected at Distribution Voltage

Approved sponsor South Texas Electric Coop., Inc. (STEC) posted 2017-11-14 ercot.com
ReasonMarket efficiencies or enhancements
Created2017-12-14
Approved2018-04-10
Sections Affected
10.2.210.2.3
Summary
This Nodal Protocol Revision Request (NPRR) removes the ERCOT Polled Settlement (EPS) Meter requirement for Non Opt-In Entity (NOIE) points of delivery that realize bi-directional flows as a result of generation that is interconnected to the Distribution System. NOIE Transmission and/or Distribution Service Providers (TDSPs) would assume the responsibility for supplying ERCOT with this meter data.
Action Log 5 milestones
Documents 8
NameTypePostedClassification
854NPRR-01 NOIE TDSP Submittal of Meters with Bidirectional Flow Caused by Generation 111417 doc Nov 14 '17 Revision Request
854NPRR-02 PRS Report 121417 doc Dec 15 '17 Committee Report
854NPRR-03 WMS Comments 011118 doc Jan 11 '18 Revision Request Comments
854NPRR-04 PRS Report 011818 doc Jan 22 '18 Committee Report
854NPRR-05 Impact Analysis 013118 doc Jan 31 '18 Staff Report
854NPRR-06 PRS Report 020818 doc Feb 9 '18 Committee Report
854NPRR-07 TAC Report 022218 doc Feb 22 '18 Committee Report
854NPRR-08 Board Report 041018 doc Apr 11 '18 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Apr 10 '18 Board of Directors Meeting BOARD Concluded
Feb 22 '18 TAC Meeting TAC Concluded
Feb 8 '18 PRS Meeting PRS Concluded
Jan 18 '18 PRS Meeting PRS Concluded
Jan 10 '18 WMS Meeting WMS Concluded
Dec 14 '17 PRS Meeting PRS Concluded