NPRR #854 · Revision Request
NPRR854 NOIE TDSP Submittal of Meters with Bidirectional Flow Caused by Generation Interconnected at Distribution Voltage
- PRS Feb 8 '18
- TAC Feb 22 '18
- BOARD Apr 10 '18
- PUCT —
ReasonMarket efficiencies or enhancements
Created2017-12-14
Approved2018-04-10
Sections Affected
10.2.210.2.3
Summary
This Nodal Protocol Revision Request (NPRR) removes the ERCOT Polled Settlement (EPS) Meter requirement for Non Opt-In Entity (NOIE) points of delivery that realize bi-directional flows as a result of generation that is interconnected to the Distribution System. NOIE Transmission and/or Distribution Service Providers (TDSPs) would assume the responsibility for supplying ERCOT with this meter data.
Timeline
-
Nov 14
PRSFiled by South Texas Electric Coop., Inc. (STEC)
-
Dec 14
PRS PRS MeetingPRSDeferred/Tabled Referred → WMS“to table NPRR854 and refer the issue to WMS” — Passed→ Language Consideration
- Jan 10
-
Jan 18
PRS PRS MeetingPRSRecommended for Approval“to recommend approval of NPRR854 as submitted” — Passed→ Impact Analysis Consideration
-
Feb 8
PRS PRS MeetingPRSRecommended for Approval Forwarded → TAC priority 2018 · rank 2160“to endorse and forward to TAC the 1/18/18 PRS Report and the Impact Analysis for NPRR854 with a recommended priority of 2018 and rank of 2160” — Passed→ Revision Request Consideration
-
Feb 22
TAC TAC MeetingTACRecommended for Approval“to recommend approval of NPRR854 as recommended by PRS in the 2/8/18 PRS Report.” — Passed→ Revision Request Consideration
-
Apr 10
BOARD Board of Directors MeetingBOARDApproved“approved NPRR854 as recommended by TAC in the 2/22/18 TAC Report” — Passed
-
—