NPRR #851 · Revision Request
NPRR851 Procedure for Managing Disconnections for Bidirectional Electrical Connections at Transmission Level Voltages
- PRS May 10 '18
- TAC May 24 '18
- BOARD Jun 12 '18
- PUCT —
ReasonRegulatory Requirements
Created2017-11-09
Approved2018-06-12
Sections Affected
2.13.1.5.1
Summary
This Nodal Protocol Revision Request (NPRR) was developed to fully implement the market design envisioned in NPRR 596, External Load Serving Entities. This NPRR establishes a clearly defined disconnection process within ERCOT market rules applicable to a transmission voltage connection to the ERCOT grid which utilizes one electrical connection for both generation and load services.
Timeline
-
Oct 25
PRSFiled by Golden Spread Electric Coop, Inc. (GSEC)
- Nov 7
-
Nov 9
PRS PRS MeetingPRSDeferred/Tabled Referred → RMS Referred → ROS Referred → WMS“to table NPRR851 and refer the issue to RMS, ROS, and WMS” — Passed→ Language Consideration
-
Nov 14
Listed without action at 7 meetings (Nov 14 '17 – Jan 10 '18)
- Jan 11
- Jan 18
-
Jan 22
Listed without action at 2 meetings (Jan 22 '18 – Jan 31 '18)
- Feb 1
-
Feb 6
Listed without action at 10 meetings (Feb 6 '18 – Mar 20 '18)
- Apr 3
- Apr 4
- Apr 5
-
Apr 12
PRS PRS MeetingPRSRecommended for Approval Amended by the Apr 11 '18 AEPSC comments“to recommend approval of NPRR851 as amended by the 4/11/18 AEPSC comments and as revised by PRS” — Passed→ Impact Analysis Consideration
- Apr 19
-
May 10
PRS PRS MeetingPRSRecommended for Approval Forwarded → TAC“to endorse and forward to TAC the 4/12/18 PRS Report and Impact Analysis for NPRR851” — Passed→ Revision Request Consideration
-
May 24
TAC TAC MeetingTACRecommended for Approval“to recommend approval of NPRR851 as recommended by PRS in the 5/10/18 PRS Report” — Passed→ Revision Request Consideration
-
Jun 12
BOARD Board of Directors MeetingBOARDApproved“approved NPRR851 as recommended by TAC in the 5/24/18 TAC Report” — Passed