NPRR #266 · Revision Request

NPRR266  Installed Capacity of Unregistered Distributed Generation (DG)

Approved sponsor CPS Energy posted 2010-08-31 ercot.com
ReasonThe approved NPRR208, Registration and Settlement of Distributed Generation (DG) Less Than One MW, added language to Section 16.5, paragraph (2) requires that ERCOT report the total unregistered installed capacity below the current DG registration threshold, summed by Load Zone. The report is to be used to determine if the registration threshold needs to be reduced to keep the total installed capacity of unregistered DG to no more than seven MW in any Load Zone. However, the language can be misinterpreted to mean that the capacity of registered and unregistered DG is to be totaled.
Created2010-09-23
Approved2010-11-16
Sections Affected
16.5
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that only the capacity of unregistered Distributed Generation Resources (DGs) is totaled for the determination that the DG registration threshold must be lowered.
Action Log 4 milestones
Documents 7
NameTypePostedClassification
266NPRR-01 Installed Capacity of Unregistered Distributed Genera doc Aug 31 '10 Revision Request
266NPRR-02 CEO Revision Request Review 083110 doc Aug 31 '10 Revision Request Comments
266NPRR-03 PRS Report 092310 doc Sep 28 '10 Committee Report
266NPRR-04 Impact Analysis 100710 doc Oct 7 '10 Staff Report
266NPRR-05 PRS Report 102110 doc Oct 26 '10 Committee Report
266NPRR-06 TAC Report 110410 doc Nov 5 '10 Committee Report
266NPRR-07 Board Report 111610 doc Nov 16 '10 Committee Report
Meetings That Took It Up 3
DateMeetingCommitteeStatus
Nov 4 '10 TAC Meeting TAC Concluded
Oct 21 '10 PRS Meeting PRS Concluded
Sep 23 '10 PRS Meeting PRS Concluded