NPRR #389 · Revision Request

NPRR389  Modification of Voltage Support Requirements to Address Existing Non-Exempt WGRs

Approved sponsor ERCOT posted 2011-07-06 ercot.com
ReasonThis NPRR addresses the central issue (a Reactive Power profile as either a rectangle or triangle) in PUC Docket No. 37817, Appeal and Complaint By Iberdrola Renewables, Inc. et al of ERCOT Decision to Approve PRR 830, and PUC Docket No. 38981, Joint Appellants’ Appeal and Complaint Concerning the ERCOT Board’s Adoption of NPRR 269 and Request for Related Relief. Order No. 22 (PUC Docket No. 37817) and Order No. 7 (PUC Docket No. 38981) consolidated PUC Docket No. 38981 into PUC Docket No. 37817. ERCOT and Joint Appellants have been working for some time to resolve the central issue involved in this PUC Docket. This NPRR is the work product of those efforts. All parties in PUC Docket No. 37817 have reviewed this NPRR.
Created2011-07-21
Approved2011-10-18
Sections Affected
2.13.15
Summary
This Nodal Protocol Revision Request (NPRR) clearly defines the Reactive Power capability requirements for Wind-powered Generation Resources (WGRs) that commenced operation on or after February 17, 2004, and have a signed Standard Generation Interconnection Agreement (SGIA) on or before December 1, 2009 (Existing Non-Exempt WGRs). These Existing Non-Exempt WGRs will fall into two categories: (1) Those whose current design allows them to meet the Reactive Power capability requirement described in paragraph (3) of Section 3.15. In these cases, the Reactive Power profile is depicted graphically as a rectangle. (2) Those whose current design does not allow them to meet the Reactive Power capability requirement described in paragraph (3) of Section 3.15. These WGRs must conduct engineering studies using the Summer/Fall 2010 Voltage Profiles to determine their actual Reactive Power capability and must, at a minimum, provide Reactive Power proportional to the real power output (a Reactive Power profile depicted graphically as a triangle). This NPRR further requires that all new Generation Resources shall have an engineering study, or demonstrate through performance testing, to show compliance with the Reactive Power capability requirements of paragraph (3) of Section 3.15 before beginning commercial operations. This NPRR also modifies the definition of "Automatic Voltage Regulator (AVR)" to better address the practical differences in Resource technology in providing this capability.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Sep 1 '11TAC To recommend approval of NPRR389 as amended by the 8/26/11 E.ON comments and as revised by TAC.Passed
Documents 9
NameTypePostedClassification
389NPRR-01 Modification of Voltage Support Requirements to Addre doc Jul 6 '11 Revision Request
389NPRR-02 Preliminary Impact Analysis 070611 doc Jul 6 '11 Staff Report
389NPRR-03 Appellants in PUC Docket No 37817 Comments 072011 doc Jul 20 '11 Revision Request Comments
389NPRR-04 PRS Report 072111 doc Jul 22 '11 Committee Report
389NPRR-05 Impact Analysis 081111 doc Aug 11 '11 Staff Report
389NPRR-06 PRS Report 081811 doc Aug 22 '11 Committee Report
389NPRR-07 E ON Comments 082611 doc Aug 26 '11 Revision Request Comments
389NPRR-08 TAC Report 090111 doc Sep 2 '11 Committee Report
389NPRR-09 Board Report 101811 doc Oct 18 '11 Committee Report
Meetings That Took It Up 5
DateMeetingCommitteeStatus
Oct 18 '11 Board of Directors Meeting BOARD Concluded
Sep 1 '11 TAC Meeting TAC Concluded
Aug 18 '11 PRS Meeting PRS Concluded
Aug 5 '11 Joint CWG/MCWG Meeting MCWG Concluded
Jul 21 '11 PRS Meeting PRS Concluded