NPRR1020  Allow Some Integrated Energy Storage Designs to Calculate Internal Loads

Approved Urgent sponsor Tesla posted 2020-04-28 ercot.com
ReasonMeets Strategic goals; Market efficiences or enhancements; Other: Some recent battery innovations, such as the Tesla Megapack, are an emerging design characterized by a modular (prefabricated) and easy-install form factor, where many of the components of the system typically found outside the battery storage device are instead tightly integrated inside the device. These prefabricated products are not always designed to have internal metering. This NPRR will allow these devices to instead calculate a Load value using internal sensors with the approval from ERCOT. This NPRR also proposes that Resources that receive this treatment must also be compliant with requirements in the SMOG. Tesla recommends NPRR1020 not be implemented until ERCOT determines that any necessary amendments to the SMOG have been implemented.
Created2020-06-11
Approved2020-08-11
Sections Affected
2.12.2. 10.2.3.110.2.4 (new)10.2.4.1 (new)10.3.2.310.9.1and 11.1.6
Summary
This NPRR clarifies that emerging storage technologies can be interconnected and operated as a Resource and avail of Wholesale Storage Load (WSL) rules. Specifically, the NPRR proposes to allow Energy Storage Resources (ESRs) with integrated Loads that cannot be metered as designed, to alternatively calculate these Loads using internal sensors. This process will require an annual attestation from the Resource Entity.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Jul 16 '20PRS to grant NPRR1020 Urgent status, to recommend approval of NPRR1020 as amended by the 7/15/20 Luminant comments as revised by PRS, and to forward NPRR1020 to TACPassed
Jul 29 '20TAC to recommend approval of NPRR1020 as recommended by PRS in the 7/16/20 PRS Report, as amended by the 7/28/20 ERCOT comments as revised by TAC, and the Impact Analysis with a recommended priority of 2021 and rank of 3220; and a recommended effective date of upon system implementation and upon implementation of necessary revisions to the SMOGPassed
Ballots
DateBodyResultYesNoAbstain
Jul 29 '20 TAC 26 0 1 xls
Documents 23
NameTypePostedClassification
1020NPRR-01 Add Definition of Integrated Battery Storage System (IBSS) 042820 doc Apr 28 '20 Revision Request
1020NPRR-02 ERCOT and PUCT Staff Comments 051120 doc May 12 '20 Revision Request Comments
1020NPRR-03 Tesla Comments 051220 doc May 12 '20 Revision Request Comments
1020NPRR-04 Enel and Able Grid Joint Comments 051220 docx May 12 '20 Revision Request Comments
1020NPRR-05 Broad Reach Enel Able Grid Comments 052720 doc May 27 '20 Revision Request Comments
1020NPRR-06 BEE Comments 060320 doc Jun 3 '20 Revision Request Comments
1020NPRR-07 Calpine Comments 061020 doc Jun 10 '20 Revision Request Comments
1020NPRR-08 Calpine Comments 061020 doc Jun 10 '20 Revision Request Comments
1020NPRR-09 Broad Reach Enel Able Grid Comments 061020 doc Jun 10 '20 Revision Request Comments
1020NPRR-10 STEC GSEC Comments 061020 doc Jun 10 '20 Revision Request Comments
1020NPRR-11 PRS Ballot 061120 xls Jun 16 '20 Revision Request Ballot
1020NPRR-12 PRS Report 061120 doc Jun 16 '20 Committee Report
1020NPRR-13 Tesla Comments 071020 doc Jul 10 '20 Revision Request Comments
1020NPRR-14 ERCOT Comments 071420 doc Jul 14 '20 Revision Request Comments
1020NPRR-15 Luminant Comments 071520 doc Jul 15 '20 Revision Request Comments
1020NPRR-16 Tesla Comments 071520 doc Jul 15 '20 Revision Request Comments
1020NPRR-17 PRS Ballot 071620 xls Jul 21 '20 Revision Request Ballot
1020NPRR-18 PRS Report 071620 doc Jul 21 '20 Committee Report
1020NPRR-19 Impact Analysis 072820 docx Jul 28 '20 Staff Report
1020NPRR-20 ERCOT Comments 072820 doc Jul 29 '20 Revision Request Comments
1020NPRR-21 TAC Ballot 072920 xls Aug 3 '20 Revision Request Ballot
1020NPRR-22 TAC Report 072920 doc Aug 3 '20 Committee Report
1020NPRR-23 Board Report 081120 doc Aug 14 '20 Committee Report
Meetings That Took It Up 19
DateMeetingCommitteeStatus
Sep 22 '25 Board of Directors Meeting BOARD Concluded
Jul 30 '25 TAC Meeting - Webex Only TAC Concluded
Jul 9 '25 WMS Meeting WMS Concluded
Jun 4 '25 WMS Meeting - Webex Only WMS Concluded
Mar 31 '21 MWG Meeting by Webex only MWG Concluded
Feb 9 '21 Urgent Board of Directors Meeting – Teleconference Available by Webcast BOARD Concluded
Jan 27 '21 TAC Meeting by Webex Only TAC Concluded
Jan 6 '21 WMS Meeting by Webex Only WMS Concluded
Dec 2 '20 WMS Meeting by Webex Only WMS Concluded
Oct 20 '20 MWG Meeting by Webex only MWG Concluded
Aug 18 '20 MWG Meeting MWG Concluded
Aug 11 '20 Urgent Board of Directors Meeting – Teleconference Available by Webcast BOARD Concluded
Aug 5 '20 WMS Meeting WMS Concluded
Jul 29 '20 TAC Meeting TAC Concluded
Jul 16 '20 PRS Meeting PRS Concluded
Jul 8 '20 WMS Meeting WMS Concluded
Jun 11 '20 PRS Meeting PRS Concluded
May 27 '20 NPRR1020 Workshop - WebEx Only Concluded
May 13 '20 PRS Meeting by Webex Only PRS Concluded