ERCOT·WATCH Search ercot.com  ⌕
NPRR #829 · Revision Request

NPRR829  Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Approved sponsor Enchanted Rock / Electranet QSE I, LLC posted 2017-04-26 ercot.com
ReasonCurrently it is difficult for non-modeled generation to hedge in the Day-Ahead Market (DAM) due to potential superfluous collateral calls during high priced Real-Time Market (RTM) events. Using telemetered data from non-modeled generation will allow ERCOT to more accurately calculate QSE collateral requirements. This NPPR will increase DAM liquidity due to increased participation of non-modeled generation in the DAM. Implementing this NPRR has the potential to allow ERCOT to gain near Real-Time transparency into non-modeled generation which could increase their ability in analyzing Real-Time system conditions. Furthermore, ERCOT will better understand the true position of the QSE by Operating Day and will also better understand their cash flow.
Created2017-05-11
Approved2017-10-17
Sections Affected
1.3.1.16.3.26.5.5.216.11.4.3.2
Summary
This Nodal Protocol Revision Request (NPRR) provides a mechanism for a Qualified Scheduling Entity (QSE) with non-modeled generation to inform ERCOT in a timely manner the net generation to the ERCOT grid from their Non-Modeled Generators so that the output can be considered in the estimate of RTL. Absent this NPRR, output from Non-Modeled Generators is not included in estimating the QSE’s RTL, and the QSE is required to post a superfluous amount of collateral.
Action Log 7 milestones
Amendments
DateBodyMotionResult
Jul 20 '17PRS To recommend approval of NPRR829 as amended by the 7/14/17 ERCOT comments and as revised by PRS.Passed
Aug 11 '17PRS To endorse and forward to TAC the 7/20/17 PRS Report as amended by the 8/9/17 ERCOT comments and Impact Analysis for NPRR829 with a recommended priority of 2019 and rank of 2510.Passed
Sep 28 '17TAC To recommend approval of NPRR829 as recommended by PRS in the 8/11/17 PRS Report and as revised by TAC; and endorsed the revised Impact Analysis for NPRR829.Passed
Documents 16
NameTypePostedClassification
829NPRR-01 Incorporate Real Time Non Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL 042617 doc Apr 26 '17 Revision Request
829NPRR-02 Shell Energy Comments 051017 doc May 10 '17 Revision Request Comments
829NPRR-03 PRS Report 051117 doc May 12 '17 Committee Report
829NPRR-04 Shell Energy Comments 051617 doc May 16 '17 Revision Request Comments
829NPRR-05 Credit WG comments 051717 doc May 17 '17 Revision Request Comments
829NPRR-06 WMS Comments 060817 doc Jun 8 '17 Revision Request Comments
829NPRR-07 PRS Report 061517 doc Jun 19 '17 Committee Report
829NPRR-08 ERCOT Comments 071417 doc Jul 14 '17 Revision Request Comments
829NPRR-09 PRS Report 072017 doc Jul 25 '17 Committee Report
829NPRR-10 ERCOT Comments 080917 doc Aug 9 '17 Revision Request Comments
829NPRR-11 Impact Analysis 080917 doc Aug 9 '17 Staff Report
829NPRR-12 PRS Report 081117 doc Aug 15 '17 Committee Report
829NPRR-13 TAC Report 082417 doc Aug 25 '17 Committee Report
829NPRR-14 Revised Impact Analysis 091317 doc Oct 9 '17 Staff Report
829NPRR-15 TAC Report 092817 doc Sep 29 '17 Committee Report
829NPRR-16 Board Report 101717 doc Oct 23 '17 Committee Report
Meetings That Took It Up 9
DateMeetingCommitteeStatus
Oct 17 '17 Board of Directors Meeting BOARD Concluded
Sep 28 '17 TAC Meeting TAC Concluded
Aug 24 '17 TAC Meeting TAC Concluded
Aug 11 '17 PRS Meeting PRS Concluded
Jul 20 '17 PRS Meeting PRS Concluded
Jun 15 '17 PRS Meeting PRS Concluded
Jun 7 '17 WMS Meeting WMS Concluded
May 17 '17 CWG/MCWG Meeting CREDITWG Concluded
May 11 '17 PRS Meeting PRS Concluded