NPRR #174 · Revision Request

NPRR174  FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals

Approved sponsor WMS posted 2009-04-14 ercot.com
ReasonWhen submitting verifiable costs, current Nodal Protocol language only allows for gas fuel recovery at the FIP. FIP alone seldom covers all natural gas costs incurred by Qualified Scheduling Entities (QSEs). Fuel transport costs, swing contract costs, and imbalance fees are examples of typical costs that are added to the underlying commodity price. These additional costs can be especially significant when resource owners are forced to buy intra-day gas in order to meet a RUC deployment instruction. The impact of FIP plus $.50 in the verifiable cost process is primarily twofold: 1) Ensures a closer alignment of cost recovery to actual gas costs for RUC-deployed units that are, by design, committed after the gas markets close, and 2) Modifies Startup Offer caps and Minimum-Energy Offer caps by ten percent since verifiable costs replace generic caps once verifiable costs are submitted. This NPRR also allows a QSE to file a settlement dispute for a Resource’s RUC Make-Whole Payment if the actual price paid for delivered natural gas for a specific Resource during a RUC instruction interval is greater than FIP * 1.X. The maximum amount that may be recovered through this dispute process is the difference between the RUC Guarantee based on the actual price paid and a fuel price of FIP*1.X.
Created2009-04-23
Approved2009-10-20
Sections Affected
5.6.1.15.6.1.29.14.7
Summary
This Nodal Protocol Revision Request (NPRR) modifies the verifiable Startup Cost and verifiable minimum energy cost calculation to include a $.50 adder for the Fuel Index Price (FIP). This NPRR also allows through the dispute process for the recovery of the difference between the Reliability Unit Commitment (RUC) Guarantee based on the actual price paid for delivered natural gas and a fuel price of FIP*1.X. In lieu of system changes, ERCOT may implement this NPRR by making appropriate adjustments to the verifiable cost procedures to accommodate the $.50 adder. These procedures will be described in the Verifiable Cost Manual.
Action Log 7 milestones
Amendments
DateBodyMotionResult
Oct 1 '09TAC To recommend approval of NPRR174 as amended by the 9/2/09 NRG Texas Power and City of Eastland comments.Passed
Documents 17
NameTypePostedClassification
174NPRR-01 FIP Modifications in Verifiable Startup and Minimum E doc Apr 14 '09 Revision Request
174NPRR-02 CEO Determination 041409 doc Apr 14 '09 Revision Request Comments
174NPRR-03 CPS Energy Comments 042309 doc Apr 23 '09 Revision Request Comments
174NPRR-04 PRS Action Report 042309 doc Apr 24 '09 Committee Report
174NPRR-05 VCWG Comments 061209 doc Jun 12 '09 Revision Request Comments
174NPRR-06 WMS Comments 061709 doc Jun 17 '09 Revision Request Comments
174NPRR-07 PRS Recommendation Report 061809 doc Jun 19 '09 Committee Report
174NPRR-08 Impact Analysis 071709 doc Jul 17 '09 Staff Report
174NPRR-09 PRS Recommendation Report 072309 doc Jul 27 '09 Committee Report
174NPRR-10 TAC Action Report 080609 doc Aug 7 '09 Committee Report
174NPRR-11 ERCOT Comments 081209 doc Aug 12 '09 Revision Request Comments
174NPRR-12 WMS Comments 082409 doc Aug 24 '09 Revision Request Comments
174NPRR-13 NRG Texas Power and City of Eastland Comments 090209 doc Sep 2 '09 Revision Request Comments
174NPRR-14 TAC Action Report 090309 doc Sep 4 '09 Committee Report
174NPRR-15 WMS Comments 091809 doc Sep 18 '09 Revision Request Comments
174NPRR-16 TAC Recommendation Report 100109 doc Oct 5 '09 Committee Report
174NPRR-17 Board Action Report 102009 doc Oct 20 '09 Committee Report
Meetings That Took It Up 12
DateMeetingCommitteeStatus
Oct 1 '09 TAC Meeting TAC Concluded
Sep 16 '09 WMS Meeting WMS Concluded
Sep 3 '09 TAC Meeting TAC Concluded
Aug 19 '09 WMS Meeting WMS Concluded
Aug 6 '09 TAC Meeting TAC Concluded
Jul 23 '09 PRS Meeting PRS Concluded
Jun 18 '09 PRS Meeting PRS Concluded
Jun 17 '09 WMS Meeting WMS Concluded
Jun 10 '09 Verifiable Costs Working Group Meeting VCWG Concluded
May 18 '09 WMS Meeting WMS Concluded
May 14 '09 Verifiable Costs Working Group Meeting VCWG Concluded
Apr 23 '09 PRS Meeting PRS Concluded