NPRR #636 · Revision Request

NPRR636  Cleanup to Remove Software Documentation Posting Requirement and Align Three-Part Supply Offer Language

Approved sponsor ERCOT posted 2014-06-27 ercot.com
ReasonAdministrative and removes an outdated posting requirement.
Created2014-07-17
Approved2014-10-14
Sections Affected
4.2.44.4.9.2.15.3and 6.3.4
Summary
This Nodal Protocol Revision Request (NPRR):1. Removes a requirement to post software documentation and code related to validation rules, to the extent that this is not Protected Information. This posting requirement was applicable prior to Nodal go-live, when ERCOT was posting requirements documents for Market Participants to prepare their systems for Nodal go-live, but there is no relevant documentation currently being produced by our vendors which is not Protected Information. However, ERCOT does provide relevant documentation for business rule validation in the "Market Submission Validation Rules" document on the Market Information System (MIS) Secure Area and for the technical validation rules, the Extensible Markup Language (XML) specifications are posted on the ERCOT website; and2. Aligns Section 4.4.9.2.1 with the limitations on modifying a Startup Offer or Minimum-Energy Offer for a Day-Ahead Market (DAM) Committed Interval which were implemented with NPRR321, Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period (formerly "Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period for Qualifying Facilities, in Section 4.4.9.3, Energy Offer Curve.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Jul 17 '14PRS To recommend approval of NPRR636 as revised by PRS.Passed
Documents 6
NameTypePostedClassification
636NPRR-01 Remove Software Doc Posting and Align 3-Part Supply O doc Jun 27 '14 Revision Request
636NPRR-02 Impact Analysis 062714 doc Jun 27 '14 Staff Report
636NPRR-03 PRS Report 071714 doc Jul 21 '14 Committee Report
636NPRR-04 PRS Report 081414 doc Aug 18 '14 Committee Report
636NPRR-05 TAC Report 082814 doc Aug 29 '14 Committee Report
636NPRR-06 Board Report 101414 doc Oct 15 '14 Committee Report
Meetings That Took It Up 5
DateMeetingCommitteeStatus
Oct 13 '14 Board of Directors Meeting BOARD Concluded
Aug 28 '14 TAC Meeting TAC Concluded
Aug 14 '14 PRS Meeting PRS Concluded
Jul 23 '14 Joint CWG/MCWG Meeting CREDITWG Concluded
Jul 17 '14 PRS Meeting PRS Concluded