NPRR #824 · Revision Request
NPRR824 Alignment of EEA Level 3 with NERC Reliability Standards EOP-011-1 and BAL-001-2
ReasonRegulatory requirements
Created2017-04-13
Approved2017-06-13
Sections Affected
6.5.9.46.5.9.4.1and 6.5.9.4.2
Summary
This Nodal Protocol Revision Request (NPRR) aligns Protocol language with the following North American Electric Reliability Corporation (NERC) Reliability Standards: 1) Attachment 1, Energy Emergency Alerts, of EOP-011-1, Emergency Operations, requires ERCOT, as the Reliability Coordinator, to declare an Energy Emergency Alert (EEA) Level 3 if ERCOT is unable to maintain its Physical Responsive Capability (PRC) above a minimum Contingency Reserve requirement of 1,375 MW. This NPRR adds language to address this standard; and 2) BAL-001-2, Real Power Balancing Control Performance, requires clock-minute average system frequency to not stay below 59.91 Hz for greater than 30 consecutive minutes. This NPRR increases the current EEA Level 3 frequency threshold from 59.80 Hz to 59.91 Hz and modifies EEA Level 2 language to include a timing component of being below 59.91 Hz for 15 consecutive minutes or more. These tiered timing milestones will align progressively more aggressive actions as the 30 consecutive minute requirement is approached to address this standard.
Action Log 4 milestones
-
Apr 13
PRSRecommended for Approval→ PRS for Impact Analysis review
-
May 11
PRSRecommended for Approval→ TAC for consideration
-
May 25
TACRecommended for Approval→ Board for consideration
-
Jun 13
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| May 11 '17 | PRS | To endorse and forward to TAC the 4/13/17 PRS Report, as revised by PRS, and the Impact Analysis for NPRR824 | Passed |
Documents 6
| Name | Type | Posted | Classification |
|---|---|---|---|
| 824NPRR-01 Alignment of EEA Level 3 with NERC Reliability Standards EOP-011-1 and BAL-001-2 032917 | doc | Mar 29 '17 | Revision Request |
| 824NPRR-02 Impact Analysis 032917 | doc | Mar 29 '17 | Staff Report |
| 824NPRR-03 PRS Report 041317 | doc | Apr 14 '17 | Committee Report |
| 824NPRR-04 PRS Report 051117 | doc | May 12 '17 | Committee Report |
| 824NPRR-05 TAC Report 052517 | doc | May 26 '17 | Committee Report |
| 824NPRR-06 Board Report 061317 | doc | Jun 13 '17 | Committee Report |
Meetings That Took It Up 7
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Jun 13 '17 | Board of Directors Meeting | BOARD | Concluded |
| Jun 8 '17 | ROS Meeting | ROS | Concluded |
| May 25 '17 | TAC Meeting | TAC | Concluded |
| May 18 '17 | OWG Meeting | OWG | Concluded |
| May 11 '17 | PRS Meeting | PRS | Concluded |
| Apr 20 '17 | OWG Meeting | OWG | Concluded |
| Apr 13 '17 | PRS Meeting | PRS | Concluded |