NPRR564  Thirty-Minute Emergency Response Service (ERS) and Other ERS Revisions

Approved Urgent sponsor ERCOT posted 2013-08-21 ercot.com
ReasonERCOT is proposing an ERS product with a thirty-minute ramp rate (ERS-30) in order to secure additional Demand Response capability and further strengthen reliability in the ERCOT Region. Since July 15, 2012, ERCOT has been conducting a pilot project to assess the operational benefits of an ERS-30 product. Based on the results of the pilot observed to date, ERCOT has concluded that such a product would bring additional participation from Loads that cannot meet a ten-minute ramp requirement, thereby providing additional reliability benefits. While a longer ramp means the product is less responsive than the existing ten-minute ERS product (ERS-10), being able to deploy it earlier during an Energy Emergency Alert gives ERCOT an additional reliability tool that should be especially valuable during foreseeable peak conditions, such as summer afternoons. This NPRR also proposes to introduce a clearing price (with some differences from NPRR537, ERS Clearing Price) in lieu of as-bid pricing, which should discourage inefficient price-chasing. Additionally, proposed changes to the maximum deployment duration language (similar to that proposed in NPRR536, ERS Time Obligation Certainty) should ensure that this deployment cap is applied to individual ERS Resources so as to maximize the operational benefit of the service. This NPRR also proposes that individual Resources will be subject to payment reductions that vary exponentially with the degree of individual performance failure in the event of a QSE-level failure, instead of being automatically suspended.
Created2013-09-19
Approved2013-11-19
Sections Affected
2.13.14.33.14.3.13.14.3.23.14.3.33.14.3.46.5.9.4.26.6.11.16.6.11.28.1.3.1.18.1.3.1.28.1.3.1.38.1.3.1.3.18.1.3.1.3.28.1.3.1.3.38.1.3.1.48.1.3.28.1.3.38.1.3.3.18.1.3.48.49.14.5
Summary
This Nodal Protocol Revision Request (NPRR) proposes a 30-minute Emergency Response Service (ERS) product and recommends other changes to ERS more generally, including the following: 1. Introduces Settlement based on a clearing price instead of individual Qualified Scheduling Entity (QSE) offer price. 2. Introduces stronger financial penalties for non-performance in a single ERS Standard Contract Term but removes mandatory suspensions. 3. Clarifies obligations of ERS Resources when deployments cross over multiple ERS Time Periods. 4. Authorizes ERCOT to provide times and dates of particular Resource deployments to QSEs in order to allow them to analyze past performance of newly acquired ERS sites. 5. Prohibits participation by sites associated with Dynamically Scheduled Resources (DSRs). 6. Clarifies that ERS Generators and ERS Loads are to be evaluated together when an ERS Generator is providing backup to an ERS Load.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Oct 17 '13PRS To recommend approval of NPRR564 as amended by the 9/10/13 ERCOT comments and as revised by PRS with a recommended priority of 2013 and rank of 892.Passed
Nov 7 '13TAC To recommend approval of NPRR564 as recommended by PRS in the 10/17/13 PRS Report with a proposed effective date of February 1 2014, to recommend approval of the "Emergency Response Service Procurement Methodology" as revised by TAC with a proposed effective date of upon ERCOT Board approval, and to add the methodology to the Other Binding Document List.Passed
Documents 17
NameTypePostedClassification
564NPRR-01 Thirty-Minute Emergency Response Service (ERS) and Ot doc Aug 21 '13 Revision Request
564NPRR-02 Impact Analysis 082113 doc Aug 21 '13 Staff Report
564NPRR-03 Tenaska Comments 082813 doc Aug 28 '13 Revision Request Comments
564NPRR-04 ERCOT Comments 091013 doc Sep 10 '13 Revision Request Comments
564NPRR-05 WMS Comments 091213 doc Sep 12 '13 Revision Request Comments
564NPRR-06 WMS Voting Ballot 091213 xls Sep 12 '13 Revision Request Ballot
564NPRR-07 DR Providers Comments 091313 doc Sep 13 '13 Revision Request Comments
564NPRR-08 Luminant Comments 091913 doc Sep 19 '13 Revision Request Comments
564NPRR-09 PRS Report 091913 doc Sep 23 '13 Committee Report
564NPRR-10 WMS Comments 101513 doc Oct 17 '13 Revision Request Comments
564NPRR-11 WMS Comments - Attachment 1 101513 doc Oct 15 '13 Revision Request Comments
564NPRR-12 WMS Voting Ballot 101513 xls Oct 17 '13 Revision Request Ballot
564NPRR-13 PRS Report 101713 doc Oct 24 '13 Committee Report
564NPRR-14 TAC Report 110713 doc Nov 8 '13 Committee Report
564NPRR-15 TAC Report - Attachment 1 110713 doc Nov 8 '13 Committee Report
564NPRR-16 Board Report 111913 doc Nov 19 '13 Committee Report
564NPRR-17 Board Report - Attachment 1 111913 doc Nov 19 '13 Committee Report
Meetings That Took It Up 11
DateMeetingCommitteeStatus
Feb 27 '14 TAC Meeting TAC Concluded
Jan 27 '14 OWG Meeting OWG Concluded
Nov 19 '13 Board of Directors Meeting BOARD Concluded
Nov 7 '13 Technical Advisory Committee (TAC) Meeting TAC Concluded
Oct 30 '13 Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting CREDITWG Concluded
Oct 17 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Oct 9 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Oct 7 '13 Qualified Scheduling Entity Managers Working Group (QMWG) Meeting QMWG Concluded
Sep 19 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Sep 11 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Sep 4 '13 ERS Workshop Concluded