ERCOT·WATCH Search ercot.com  ⌕
NPRR #520 · Revision Request

NPRR520  Real-Time Mitigation Rules and Creation of a Real-Time Constraint Competitiveness Test

Approved Urgent sponsor ERCOT posted 2013-02-06 ercot.com
ReasonTo address the following issues: -Mitigated prices or offers being applied in situations that are competitive or in which an Entity with decision making authority does not have a significant competitive advantage. -Base Point oscillations that occur with changes in the reference Locational Marginal Price (LMP) and Resources being unnecessarily mitigated. -Multiple Quick Start Generating Resources (QSGRs) being brought online when not all needed due to having the same mitigated offer applied.These were some of the issues raised in the January 15, 2013 Independent Market Monitor (IMM) report to the ERCOT Board to "implement the changes necessary to address the SCED "over-mitigation" issues".
Created2013-02-21
Approved2013-03-19
Sections Affected
2.13.193.19.13.19.23.19.33.19.43.19.56.5.7.36.5.7.4
Summary
This primary changes in this Nodal Protocol Revision Request (NPPR) are the following: -The Monthly and Daily Constraint Competitiveness Tests (CCTs) will be replaced with a CCT that is performed as part of the Security-Constrained Economic Dispatch (SCED) process considering only those constraints that are active in SCED and using the current system conditions -The Element Competitiveness Index (ECI) calculation for the Long-Term and SCED CCTs will only be performed on the import side of a constraint -The designation of a constraint as competitive or non-competitive in the SCED CCT will not be dependent on the designation during the Long-Term CCT -The Independent Market Monitor (IMM) is given the ability to designate constraints as either competitive or non-competitive, regardless of CCT results -Only those Entities with decision making authority that have a significant impact in making a constraint non-competitive will be considered for mitigation in SCED -Only those Resources that have a significant contribution in getting the Entity with decision making authority considered for mitigation for a Non-Competitive Constraint will have mitigation applied in SCED -The formula for mitigating energy offers in SCED is changed to include a small adder to the reference price from SCED Step 1 in order to minimize issues caused by the tie breaking logic The use of Mitigated Offer Floors in the SCED process is removed.
Action Log 3 milestones
Amendments
DateBodyMotionResult
Mar 7 '13TAC To recommend approval of NPRR520 as revised by the 2/28/13 ERCOT comments and request that WMS provide a draft of the related Other Binding Document to TAC in AprilPassed
Documents 8
NameTypePostedClassification
520NPRR-01 Real-Time Mitigation Rules and Creation of a Real-Tim doc Feb 6 '13 Revision Request
520NPRR-02 Impact Analysis 020613 doc Feb 6 '13 Staff Report
520NPRR-03 NRG Texas Comments 021213 doc Feb 12 '13 Revision Request Comments
520NPRR-04 PRS Report 022113 doc Feb 25 '13 Committee Report
520NPRR-05 ERCOT Comments 022513 doc Feb 25 '13 Revision Request Comments
520NPRR-06 ERCOT Comments 022813 doc Feb 28 '13 Revision Request Comments
520NPRR-07 TAC Report 030713 doc Mar 8 '13 Committee Report
520NPRR-08 Board Report 031913 doc Mar 22 '13 Committee Report
Meetings That Took It Up 11
DateMeetingCommitteeStatus
Aug 15 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Jun 12 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Jun 5 '13 Congestion Management Working Group (CMWG) Meeting CMWG Concluded
May 8 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Apr 12 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Mar 19 '13 Board of Directors Meeting BOARD Concluded
Mar 13 '13 Wholesale Market Subcommittee (WMS) Meeting WMS Concluded
Mar 7 '13 Technical Advisory Committee (TAC) Meeting TAC Concluded
Feb 27 '13 Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting CREDITWG Concluded
Feb 26 '13 Congestion Management Working Group (CMWG) Meeting CMWG Concluded
Feb 21 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded