NPRR #520 · Revision Request
NPRR520 Real-Time Mitigation Rules and Creation of a Real-Time Constraint Competitiveness Test
ReasonTo address the following issues: -Mitigated prices or offers being applied in situations that are competitive or in which an Entity with decision making authority does not have a significant competitive advantage. -Base Point oscillations that occur with changes in the reference Locational Marginal Price (LMP) and Resources being unnecessarily mitigated. -Multiple Quick Start Generating Resources (QSGRs) being brought online when not all needed due to having the same mitigated offer applied.These were some of the issues raised in the January 15, 2013 Independent Market Monitor (IMM) report to the ERCOT Board to "implement the changes necessary to address the SCED "over-mitigation" issues".
Created2013-02-21
Approved2013-03-19
Sections Affected
2.13.193.19.13.19.23.19.33.19.43.19.56.5.7.36.5.7.4
Summary
This primary changes in this Nodal Protocol Revision Request (NPPR) are the following: -The Monthly and Daily Constraint Competitiveness Tests (CCTs) will be replaced with a CCT that is performed as part of the Security-Constrained Economic Dispatch (SCED) process considering only those constraints that are active in SCED and using the current system conditions -The Element Competitiveness Index (ECI) calculation for the Long-Term and SCED CCTs will only be performed on the import side of a constraint -The designation of a constraint as competitive or non-competitive in the SCED CCT will not be dependent on the designation during the Long-Term CCT -The Independent Market Monitor (IMM) is given the ability to designate constraints as either competitive or non-competitive, regardless of CCT results -Only those Entities with decision making authority that have a significant impact in making a constraint non-competitive will be considered for mitigation in SCED -Only those Resources that have a significant contribution in getting the Entity with decision making authority considered for mitigation for a Non-Competitive Constraint will have mitigation applied in SCED -The formula for mitigating energy offers in SCED is changed to include a small adder to the reference price from SCED Step 1 in order to minimize issues caused by the tie breaking logic The use of Mitigated Offer Floors in the SCED process is removed.
Action Log 3 milestones
-
Feb 21
PRSRecommended for Approval→ TAC Consideration
-
Mar 7
TACRecommended for Approval→ ERCOT Board Consideration
-
Mar 19
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Mar 7 '13 | TAC | To recommend approval of NPRR520 as revised by the 2/28/13 ERCOT comments and request that WMS provide a draft of the related Other Binding Document to TAC in April | Passed |
Documents 8
| Name | Type | Posted | Classification |
|---|---|---|---|
| 520NPRR-01 Real-Time Mitigation Rules and Creation of a Real-Tim | doc | Feb 6 '13 | Revision Request |
| 520NPRR-02 Impact Analysis 020613 | doc | Feb 6 '13 | Staff Report |
| 520NPRR-03 NRG Texas Comments 021213 | doc | Feb 12 '13 | Revision Request Comments |
| 520NPRR-04 PRS Report 022113 | doc | Feb 25 '13 | Committee Report |
| 520NPRR-05 ERCOT Comments 022513 | doc | Feb 25 '13 | Revision Request Comments |
| 520NPRR-06 ERCOT Comments 022813 | doc | Feb 28 '13 | Revision Request Comments |
| 520NPRR-07 TAC Report 030713 | doc | Mar 8 '13 | Committee Report |
| 520NPRR-08 Board Report 031913 | doc | Mar 22 '13 | Committee Report |
Meetings That Took It Up 11
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Aug 15 '13 | Reliability and Operations Subcommittee (ROS) Meeting | ROS | Concluded |
| Jun 12 '13 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| Jun 5 '13 | Congestion Management Working Group (CMWG) Meeting | CMWG | Concluded |
| May 8 '13 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| Apr 12 '13 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| Mar 19 '13 | Board of Directors Meeting | BOARD | Concluded |
| Mar 13 '13 | Wholesale Market Subcommittee (WMS) Meeting | WMS | Concluded |
| Mar 7 '13 | Technical Advisory Committee (TAC) Meeting | TAC | Concluded |
| Feb 27 '13 | Joint Credit Working Group (CWG)/Market Credit Working Group (MCWG) Meeting | CREDITWG | Concluded |
| Feb 26 '13 | Congestion Management Working Group (CMWG) Meeting | CMWG | Concluded |
| Feb 21 '13 | Protocol Revision Subcommittee (PRS) Meeting | PRS | Concluded |