SCR724 ! Left-In-Hot CSV Process ERCOT Approved Sep 16 '02 Sep 16 '02
SCR730 ! Market Operations Test Environment for Wholesale Market Participants TXU Approved Jul 10 '03 Jul 10 '03
RMGRR021 ! Municipal and Cooperative Disconnect Reconnect Process Guide DNP Approved Mar 7 '05 Apr 7 '05
RMGRR030 ! Texas SET Version 2.1 Updates Kyle Patrick on... Approved Sep 27 '05 Nov 3 '05
LPGRR008 ! Profile ID Assignment Effective Date Ernie Prodraza on... Approved Oct 31 '05 Dec 1 '05
LPGRR011 ! Correction to LPGRR010 – Load Profile Type Responsibility Change ERCOT Approved Apr 18 '06 May 4 '06
RMGRR037 ! Submission of Switch Requests during a Mass Transition Event Kathy Scott on... Approved May 31 '06 Jul 6 '06
RMGRR046 ! Appendices to Comply with POLR Rule Project 31416 Kathy Scott and Rob... Approved Oct 27 '06 Dec 1 '06
LPGRR016 ! Load Profile Transition Mitigation Profiling Working Group Approved Oct 13 '06 Dec 12 '06
RMGRR047 ! Transfer from Outgoing Provider of Last Resort (POLR) to Incoming POLR upon Termination of POLR Status Kathy Scott and Rob... Approved Nov 1 '06 Dec 12 '06
LPGRR019 ! Revision of Holidays Tab in Profile Model Spreadsheets Profiling Working Group Approved Jan 23 '07 Mar 8 '07
RMGRR050 ! Mass Transition Process for Events Initiated Prior to a Weekend or ERCOT Holiday and Additional Clarifications, Kathy Scott and Rob... Approved Feb 5 '07 Mar 8 '07
RMGRR052 ! File Naming Convention for Customer Billing Contact Information Market Coordination... Approved Apr 30 '07 Jun 7 '07
LPGRR024 ! Residential (RES) Profile Segment Determination Algorithm Correction Carl Raish, ERCOT Approved Jun 18 '07 Jun 28 '07
RMGRR058 ! Layout Modification to Customer Billing Contact Information File Karen Farley on... Approved Aug 1 '07 Sep 18 '07
LPGRR030 ! Distributed Renewable Generation Modifications Ernest Podraza on... Approved Mar 26 '08 May 20 '08
RMGRR064 ! Correcting Retail Market Guide for Leapfrog processes to synch up with ERCOT’s system logic Rob Bevill and Kathy... Approved Jul 29 '08 Sep 10 '08
RMGRR063 ! Mass Transition Revisions Resulting from June 2008 Lessons Learned Workshop Rob Bevill on behalf... Approved Jul 29 '08 Sep 26 '08
RMGRR068 ! Out-Flow Power from Distributed Renewable Generation Facilities Rob Bevill on behalf... Approved Sep 29 '08 Nov 6 '08
LPGRR031 ! Profile Decision Tree Changes For Distributed Renewable Generation Ernie Podraza on... Approved Sep 8 '08 Nov 17 '08
SCR751 ! Nodal -- Power Balance Shadow Price Cap Curve for SCED (formerly titled "Nodal -- Shadow Price Cap") Marguerite Wagner on... Approved Oct 30 '08 Jan 20 '09
SCR745 ! Retail Market Outage Evaluation and Resolution TXU Electric Delivery Approved May 12 '05 Feb 17 '09
SCR754 ! Replace Email Delivery of WGRPP Forecasts (formerly "WGRPP Forecasts Posted on Zonal TML") ERCOT Approved Dec 23 '08 Apr 22 '09
RMGRR077 ! Prepay Priority Code 05 -- Disconnect for Non-pay and Reconnect after DNP Ed Echols on behalf of Oncor Approved May 22 '09 Jul 9 '09
RMGRR078 ! Adding Additional Fields to the Customer Billing Contact Information File (formerly "Add E-mail Field to the Customer Billing Contact Information File") Jennifer Frederick... Approved May 22 '09 Jul 21 '09
RMGRR079 ! Changes to Support Revisions to the PUCT POLR and Expedited Switch Rules Jennifer Frederick... Approved Jun 28 '09 Aug 18 '09
NOGRR025 ! Monitoring Programs for QSEs, TSPs, and ERCOT ERCOT Approved Feb 6 '09 Sep 15 '09
NOGRR030 ! Synchronization -- Total Transmission Capacity Correction ERCOT Approved Sep 3 '09 Oct 1 '09
RMGRR080 ! Define E-mail Address Format for the Detail Record in the Customer Billing Contact Information File Jennifer Frederick... Approved Sep 1 '09 Oct 1 '09
LPGRR035 ! Addition of Time Of Use Schedules (TOUS) to Profiles with Interval Data Recorder (IDR) Meter Data Type Codes for Advanced Meters Chris Rowley with TXU Energy Approved Sep 14 '09 Nov 5 '09
LPGRR037 ! Replace Wording Truncated from LPGRR035 PWG Approved Dec 30 '09 Feb 4 '10
RMGRR087 ! Meter Tampering Business Processes Michael Matlock and... Approved May 11 '10 Jun 15 '10
PGRR001 ! Planning Guide -- Section 2, Process for Planning Guide Revision Planning Working Group (PLWG) Approved Jun 2 '10 Jul 20 '10
NOGRR051 ! Synchronization with OGRR192 and OGRR238 ERCOT Approved Aug 17 '10 Oct 7 '10
NOGRR053 ! Synchronization with OGRR226, Generation Resource Response Time Requirement Frank Owens on... Approved Sep 15 '10 Oct 7 '10
LPGRR041 ! Distributed Generation (DG) to Sync with NPRR208 Language Effective on Nodal Go-Live Ernie Podraza and Ed... Approved Sep 23 '10 Nov 4 '10
NOGRR048 ! Synchronization with OGRR240, CREZ Facility Protection and Control Requirements AEPSC Approved Jul 23 '10 Nov 4 '10
RMGRR091 ! Accelerated Disconnect and Reconnect for Customers with Advanced Meters Jennifer Frederick... Approved Oct 21 '10 Dec 8 '10
RMGRR092 ! Changes to Implement an Interim Solution for Critical Care Status and Secondary Contact Information Jennifer Frederick... Approved Nov 3 '10 Dec 8 '10
NPRR293 ! Requirement to Post PTP Obligation Quantities Awarded in DAM (formerly "Requirement to Post CRR Option and Obligation Quantities Cleared in DAM or Taken to Real Time") Luminant Energy Company, LLC Approved Nov 3 '10 Dec 14 '10
NPRR295 ! Synchronization of Protocol for Generation Resource Designation as Mothballed or Decommissioned ERCOT Approved Nov 11 '10 Dec 14 '10
NPRR302 ! Correct Fuel Type Language for Mitigated Offer Cap Morgan Stanley Approved Dec 7 '10 Jan 18 '11
OBDRR001 ! Texas SET Implementation Guides Revision Process Jennifer Frederick... Approved Dec 13 '10 Jan 18 '11
LPGRR044 ! Addition of Distributed Generation (DG) Load Profiles Ernie Podraza on... Approved Jan 31 '11 Mar 3 '11
NOGRR057 ! Daily Report Containing Loss of Generation Greater than 450 MW LCRA Approved Jan 6 '11 Mar 22 '11
NPRR303 ! Requirement to Post PTP Options Cleared in DAM or Taken to Real-Time Luminant Energy Company, LLC Approved Dec 16 '10 Mar 22 '11
NPRR305 ! Timeline for Calculating the Value of X VCWG Approved Jan 11 '11 Mar 22 '11
NPRR307 ! Change SASM Offer Procedures Morgan Stanley Approved Jan 11 '11 Mar 22 '11
NPRR323 ! Correct DAM Credit Exposure Language and Enable Qualified Expiring CRRs to Offset PTP Bid Exposure Tenaska Power Services Approved Feb 10 '11 Mar 22 '11
NPRR325 ! Price Correction During SCED Process Failure ERCOT Approved Feb 10 '11 Mar 22 '11
SCR760 ! Recommended Changes Needed for Information Model Manager and Topology Processor for Planning Models Wesley Woitt on... Approved Nov 4 '10 Mar 22 '11
NOGRR062 ! Require Voltage Ride-Through Capability for IRRs ERCOT Approved Mar 3 '11 Apr 7 '11
NPRR316 ! Negative Self-Arranged Ancillary Services Quantity (formerly "Negative Self-Arranged Ancillary Services") Morgan Stanley Approved Feb 2 '11 Apr 19 '11
NPRR320 ! Minimum PTP Option Bid and Settlement (formerly "Minimum PTP Option Bids and CRR Auction Fees") Bob Wittmeyer Approved Feb 8 '11 Apr 19 '11
NPRR329 ! Security Classification Changes for Extracts/Reports MIS User Group Approved Feb 23 '11 Apr 19 '11
NPRR331 ! Addition of the Balance of the Year PCRR Allocation ERCOT Approved Feb 25 '11 Apr 19 '11
NPRR335 ! TSP Request for Interval Data Jennifer Bevill on... Approved Mar 1 '11 Apr 19 '11
NPRR339 ! Modifications to Heuristic Rules to Determine LMP at De-energized Electrical Bus and Treatment of CRR Offers at De-energized Settlement Points ERCOT Approved Mar 17 '11 Apr 19 '11
NPRR341 ! Remove Ancillary Service Offers from SASM that do not Meet the Lead Time ERCOT Approved Mar 23 '11 Apr 19 '11
NPRR342 ! Notification and Actions to Address Outcomes Inconsistent With Efficient Operation of the ERCOT Market ERCOT Approved Mar 30 '11 Apr 19 '11
NPRR343 ! CRR Bid and PTP Obligation Bid Criteria Change ERCOT Approved Mar 29 '11 Apr 19 '11
NPRR350 ! Change to the Security Classification of the System Ancillary Service Capacity Monitor Dashboard Jackie Ashbaugh on... Approved Apr 11 '11 May 16 '11
NPRR352 ! Real-Time HSL Telemetry for WGRs ERCOT Approved Apr 13 '11 May 17 '11
SCR764 ! Public Access to Select MIS Dashboards Jackie Ashbaugh on... Approved Apr 7 '11 May 17 '11
NPRR322 ! Real-Time PTP Option Modeling Luminant Energy Company LLC Approved Feb 10 '11 Jun 21 '11
SCR765 ! Public Aggregated Wind Dashboard Jackie Ashbaugh on... Approved Apr 18 '11 Jun 21 '11
NOGRR068 ! Hydro-Responsive Reserve ERCOT Approved Mar 31 '11 Jul 7 '11
NPRR312 ! Clarification of QSE Requirements for Split Generation Resources ERCOT Approved Feb 1 '11 Jul 18 '11
NPRR376 ! CRR Volume Limitation Enhancements DC Energy Approved Jun 7 '11 Jul 19 '11
NPRR387 ! Hydro RRS Deployment Under Frequency Relay Set Point LCRA Approved Jun 15 '11 Jul 19 '11
NPRR347 ! Single Daily Settlement Invoice and Updates to Credit Calculations, including addition of a Minimum Collateral Exposure Component (formerly "Counter-Party Invoice and Single Daily Settlement Invoice") ERCOT Approved Apr 6 '11 Aug 16 '11
NPRR357 ! Revisions to Collateral Requirements Concerning CRR Auctions (formerly "Multi-Month CRR Auction and Revisions to Collateral Requirements") Luminant Approved May 4 '11 Aug 16 '11
NPRR369 ! Black Start Service Requirement Revisions ERCOT Approved May 18 '11 Aug 16 '11
NPRR388 ! Clarification of Quick Start Generation Resource Performance Criteria Luminant Energy Approved Jul 6 '11 Aug 16 '11
NPRR390 ! Clarification of the Applicability of the Use of the Refund Option ERCOT Approved Jul 6 '11 Aug 16 '11
NPRR392 ! Credit Review During CRR Auction ERCOT Approved Jul 14 '11 Aug 16 '11
NOGRR069 ! Relay Misoperation Reporting Changes for Consistency with ERO-RAPA Proposal SPWG Approved Apr 6 '11 Sep 1 '11
NPRR365 ! Change in Resource Outage Approvals from Eight to 45 Days (formerly "Change in Resource Outage Approvals from Eight to 90 Days") ERCOT Approved May 4 '11 Sep 20 '11
NPRR396 ! Reduce Standard O&M Costs City of Eastland Approved Jul 19 '11 Sep 20 '11
NPRR400 ! Eliminate Unsecured Credit for CRR Auctions and for Future Credit Exposure and Eliminate Netting of FCE with CCE ERCOT Approved Aug 3 '11 Oct 18 '11
NOGRR082 ! Synchronization with NPRR258 and Alignment of Primary Frequency Response Test Procedures ERCOT Approved Oct 7 '11 Dec 1 '11
NPRR351 ! SCED Look-Ahead Step 1: Pricing: Calculate Non-Binding Prices and Basepoints for Initial Research into SCED Look-Ahead and allow Consumers to have a Forward Price Projection (formerly "Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes") WMS Approved Apr 13 '11 Dec 12 '11
NPRR426 ! Standing Non-Spin Deployment in the Operating Hour for Generation Resources Providing On-Line Non-Spin ERCOT Approved Nov 9 '11 Dec 12 '11
NPRR427 ! Energy Offer Curve Requirements for Generation Resources Assigned Reg-Up and RRS ERCOT Approved Nov 9 '11 Dec 12 '11
NPRR428 ! Energy Offer Curve Requirements for Generation Resources Assigned Non-Spin Responsibility ERCOT Approved Nov 9 '11 Dec 12 '11
NOGRR087 ! Reinsertion of Network Operations Modeling Requirements Planning Working Group (PLWG) Approved Nov 30 '11 Jan 5 '12
NPRR432 ! Deployment of Resources to Alleviate Anticipated Emergency Conditions (formerly "Deployment of Resources to Alleviate Imminent Emergency Conditions") ERCOT Approved Dec 2 '11 Feb 21 '12
NPRR434 ! Increase the Capacity Limitation of a Generation Resource Providing RRS Robert Helton on... Approved Dec 27 '11 Feb 21 '12
NPRR435 ! Requirements for Energy Offer Curves in the Real Time SCED for Generation Resources Committed in RUC ERCOT Approved Jan 3 '12 Feb 21 '12
NPRR437 ! Allow Aggregation of Multiple Generators Into A Single Resource For Market and Engineering Modeling ERCOT Approved Jan 23 '12 Feb 21 '12
NPRR448 ! Clarification of Database Query Results Kathryn Thurman on... Approved Mar 7 '12 Apr 17 '12
NPRR449 ! Reduce Maximum CRR Transaction Limit in Auctions WMS Approved Mar 13 '12 Apr 17 '12
NPRR450 ! Revise Requirements for Contracts to Procure Additional Capacity to Alleviate Emergency Conditions (formerly "Revise Board Approval Requirement for Contracts to Procure Additional Capacity to Alleviate Emergency Conditions") ERCOT Approved Mar 14 '12 Apr 17 '12
NPRR451 ! Implementation of New P.U.C. Subst. Rule 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Response Service (ERS) ERCOT Approved Mar 15 '12 Apr 17 '12
NPRR442 ! Energy Offer Curve Requirement for Generation Resources Providing Reliability Must-Run Service Morgan Stanley Approved Feb 3 '12 May 15 '12
NOGRR092 ! Synchronization with NPRR451 ERCOT Approved Apr 5 '12 Jun 7 '12
NPRR453 ! Separation of Year 1 and Year 2 of the Annual CRR Auctions by Timing ERCOT Approved Apr 2 '12 Jun 19 '12
NPRR463 ! CRR Auction Structure Enhancements DC Energy Texas LLC Approved May 7 '12 Jun 19 '12
NPRR459 ! Better Matching Forward Collateralization with Forward Risk in the Real-Time Market NRG Approved May 1 '12 Jul 17 '12
NPRR468 ! Alignment of System-Wide Offer Cap and Scarcity Pricing Mechanism Language with PUCT Substantive Rules ERCOT Approved Jun 13 '12 Jul 17 '12
NPRR469 ! Modifications to CCTs M. Wagner at the... Approved Jun 15 '12 Jul 17 '12
NPRR464 ! SASM Procurement Reporting NRG Texas Power LLC Approved May 15 '12 Sep 18 '12
NPRR470 ! Real-Time PTP Option Modeling Language Cleanup ERCOT Approved Aug 2 '12 Sep 18 '12
NPRR472 ! Implementation Clarifications for Consideration of DC Tie Lines and Outages in CCTs ERCOT Approved Aug 8 '12 Sep 18 '12
NPRR477 ! Exception for Block Load Transfers at Presidio American Electric... Approved Aug 17 '12 Sep 18 '12
NPRR485 ! Clarification for Fuel Adder Provisions Luminant Approved Oct 1 '12 Nov 13 '12
NPRR461 ! Energy Storage Settlements Consistent With PUCT Project 39917 ERCOT Approved May 2 '12 Dec 11 '12
NPRR497 ! Corrections to NPRR400 ERCOT Approved Oct 31 '12 Dec 11 '12
NPRR501 ! Correct ERS Self-Provision Settlement Calculation ERCOT Approved Nov 14 '12 Dec 11 '12
NPRR506 ! Correction of Reconfiguration SASM Language Inconsistency ERCOT Approved Dec 5 '12 Jan 15 '13
NPRR507 ! Correction of PTP Obligation Settlement Language Related to NPRR322 and NPRR470 ERCOT Approved Dec 6 '12 Jan 15 '13
NPRR487 ! QSGR Dispatch Adjustment Luminant Energy LLC Approved Oct 3 '12 Mar 19 '13
NPRR509 ! Shortened RTM Settlement Timeline Harika Basaran on... Approved Dec 20 '12 Mar 19 '13
NPRR518 ! Removal of Notification Requirement for Disclosures of Protected Information Required by CFTC ERCOT Approved Feb 6 '13 Mar 19 '13
NPRR520 ! Real-Time Mitigation Rules and Creation of a Real-Time Constraint Competitiveness Test ERCOT Approved Feb 6 '13 Mar 19 '13
NPRR521 ! Transitional CRR Auction Capacity Value for Initial CRR Long-Term Auction Sequence ERCOT Approved Feb 15 '13 Mar 19 '13
SCR773 ! Addition of Regulation Feedback to Generation to be Dispatched Calculation David Kee on behalf... Approved Jan 30 '13 Mar 19 '13
NPRR511 ! Correction to Emergency Energy Settlement Language ERCOT Approved Jan 2 '13 May 14 '13
NPRR514 ! Seasonal Generation Resource Luminant Energy Company LLC Approved Feb 4 '13 May 14 '13
NPRR530 ! Transfers of Specific NOIEs Within a NOIE Load Zone to a Competitive Load Zone The City of Georgetown Approved Mar 20 '13 May 14 '13
NPRR534 ! Clarification of QSE Responsibilities to Provide Service in NOIE Territory STEC, CPS Energy,... Approved Apr 3 '13 May 14 '13
NOGRR119 ! Revisions to Load Shed Table ERCOT Approved Jun 18 '13 Jul 2 '13
NPRR551 ! Posting of Annual Planning Model ERCOT Approved Jul 1 '13 Sep 16 '13
NPRR524 ! Resource Limits in Providing Ancillary Service GDF Suez Energy... Approved Mar 5 '13 Sep 17 '13
NPRR532 ! Performance Measurement and Verification and Telemetry Requirements for Load Resources Providing Non-Spin DSWG Approved Mar 26 '13 Sep 17 '13
NPRR552 ! Additional Counter-Party Criteria ERCOT Approved Jul 3 '13 Sep 17 '13
NPRR554 ! Clarification of Future Credit Exposure Calculation ERCOT Approved Jul 3 '13 Sep 17 '13
NPRR555 ! Load Resource Participation in Security-Constrained Economic Dispatch ERCOT Approved Jul 3 '13 Sep 17 '13
NPRR557 ! Clarification of Treatment of Holidays for RTM Settlement Timeline (formerly "Administrative Changes for August 1, 2013 Nodal Protocols") ERCOT Approved Jul 11 '13 Sep 17 '13
LPGRR050 ! Changes the Review of Additional Validations from a Quarterly Review to an Annual Review Ed Echols on behalf... Approved Sep 30 '13 Nov 7 '13
NPRR550 ! Modifications to Planning Reserve Margin Inputs GATF Approved Jun 27 '13 Nov 19 '13
NPRR564 ! Thirty-Minute Emergency Response Service (ERS) and Other ERS Revisions ERCOT Approved Aug 21 '13 Nov 19 '13
NPRR568 ! Real-Time Reserve Price Adder Based on Operating Reserve Demand Curve ERCOT Approved Sep 19 '13 Nov 19 '13
NPRR570 ! Reduce RTM Settlement Timeline to Operating Day Plus Five Harika Basaran and... Approved Sep 30 '13 Nov 19 '13
COPMGRR036 ! Alignment with NPRR570, Reduce RTM Settlement Timeline to Operating Day Plus Five Harika Basaran and... Approved Sep 30 '13 Dec 3 '13
RRGRR001 ! Section 2, Resource Registration Glossary Brenda Hampton on... Approved Nov 11 '13 Dec 3 '13
NPRR571 ! ERS Weather-Sensitive Loads Requirements Earth Networks Approved Oct 2 '13 Dec 10 '13
NPRR575 ! Clarification of the RUC Resource Buy-Back Provision for Ancillary Services GDF Suez NA Inc. Approved Oct 23 '13 Dec 10 '13
NPRR578 ! Restores RUC Decommitment Charge Language Deleted in NPRR416 ERCOT Approved Nov 6 '13 Dec 10 '13
NPRR579 ! Amendment to the Minimum PTP Option Bid Price Approval Timeline ERCOT Approved Nov 6 '13 Dec 10 '13
NPRR556 ! Resource Adequacy During Transmission Equipment Outage Tenaska Power Services Approved Jul 10 '13 Feb 11 '14
NPRR591 ! As-Built Clarification and Corrections Related to NPRR568 and NPRR555 ERCOT Approved Jan 9 '14 Feb 11 '14
NOGRR127 ! Synchronization with NPRR564, Thirty-Minute Emergency Response Service (ERS) and Other ERS Revisions ERCOT Approved Jan 21 '14 Feb 27 '14
NPRR533 ! PCRR Eligibility Requirements (formerly "Clarification of PCRR Eligibility Requirements") ERCOT Approved Mar 29 '13 Apr 8 '14
NPRR576 ! Changing Non-Spin Service to be Dispatched by ERCOT (formerly "Changing Non-Spin Service to an Off-Line Service") GDF Suez NA Inc. Approved Oct 24 '13 Apr 8 '14
NPRR596 ! External Load Serving Entities ERCOT Approved Jan 29 '14 Apr 8 '14
NPRR598 ! Clarify Inputs to PRC and ORDC ERCOT Approved Feb 12 '14 Apr 8 '14
NPRR602 ! Exemption for Sharyland Brady Load Transition Reliant Energy... Approved Mar 10 '14 Apr 8 '14
NPRR603 ! ERS Settlement and Service Types ERCOT Approved Mar 10 '14 Apr 8 '14
NOGRR130 ! Alignment with NPRR555 and NPRR434 ERCOT Approved Mar 13 '14 Apr 24 '14
RMGRR120 ! Sharyland Updates BJ Flowers on behalf... Approved Jan 20 '14 Apr 24 '14
NPRR626 ! Reliability Deployment Price Adder (formerly "ORDC Price Reversal Mitigation Enhancements") Luminant Energy Company, LLC Approved May 16 '14 Aug 12 '14
NPRR631 ! Corrections to Definition of Credible Single Contingency ERCOT Approved Jun 17 '14 Aug 12 '14
VCMRR004 ! Caps for Energy Storage Resources Chamisa Energy Approved Jul 30 '14 Aug 28 '14
RRGRR004 ! Steam Pressure Curve Information for Implementation of Regional Reliability Standard BAL-001-TRE-1 ERCOT Approved Aug 15 '14 Sep 25 '14
NPRR643 ! Clarification of MIS Postings for Outages Upon Implementation of SCR774, Enhancement to Outage Scheduler and Reports ERCOT Approved Jul 30 '14 Oct 14 '14
RRGRR003 ! Modifications to Improve Wind Forecasting ERCOT Approved Jun 20 '14 Oct 14 '14
NPRR664 ! Fuel Index Price for Resource Definition and Real-Time Make-Whole Payments for Exceptional Fuel Cost Events RCWG Approved Oct 22 '14 Dec 9 '14
NPRR666 ! Clarification for the CRR Balancing Account ERCOT Approved Oct 30 '14 Dec 9 '14
VCMRR005 ! Fuel Index Price for Resource Definition and Real-Time Make-Whole Payments for Exceptional Fuel Cost Events RCWG Approved Oct 27 '14 Dec 18 '14
NOGRR140 ! Posting of the ERCOT Geomagnetic Disturbance Operating Plan CenterPoint Energy Approved Nov 4 '14 Jan 29 '15
NPRR680 ! Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation ERCOT Approved Jan 28 '15 Jun 9 '15
NPRR698 ! Clarifications to NPRR595, RRS Load Resource Treatment In ORDC ERCOT Approved Apr 29 '15 Jun 9 '15
VCMRR011 ! Timeline for Reviewing Resources Verifiable Costs for Five Year Updates ERCOT Approved Sep 30 '15 Oct 29 '15
RMGRR137 ! Timeline and Completion Process for Correcting Customer Billing Contact Information Files Texas SET Working Group Approved Apr 22 '16 May 26 '16
VCMRR014 ! Revise Fuel Adder Factor for Coal and Lignite Resources Paul Vinson on... Approved Apr 27 '16 May 26 '16
NOGRR050 ! Resolution of Reporting Issues Related to NPRR219 DeAnn Walker on... Approved Aug 12 '10 Jun 14 '16
NPRR766 ! Alignment of System-Wide Discount Factor Description with Operational Adjustments to RDF ERCOT Approved Apr 18 '16 Jun 14 '16
NPRR788 ! RMR Study Modifications LCRA Approved Jul 7 '16 Oct 11 '16
NPRR793 ! Clarifications to RMR RUC Commitment and Other RMR Cleanups ERCOT Approved Jul 27 '16 Oct 11 '16
NPRR795 ! Provisions for Refunds of Capital Contributions Made in Connection with an RMR Agreement ERCOT Approved Aug 2 '16 Oct 11 '16
NOGRR164 ! Alignment with NPRR792, Removing Special Protection System (SPS) and adding Remedial Action Scheme (RAS) ERCOT Approved Jul 27 '16 Dec 15 '16
NPRR800 ! Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices ERCOT Approved Aug 30 '16 Feb 14 '17
NPRR818 ! Allow Curtailment of Certain DC Tie Load Prior to Declaring Emergency Condition Rainbow Energy... Approved Feb 1 '17 Apr 4 '17
NPRR827 ! Disallow PTP Obligation Bid Award where Clearing Price exceeds Bid Price by $0.25/MW per hour Crescent Power, Inc. Approved Apr 11 '17 Jun 13 '17
NPRR830 ! Revision of 4-Coincident Peak Methodology ERCOT Approved Apr 26 '17 Jun 13 '17
NPRR831 ! Inclusion of Private Use Networks in Load Zone Price Calculations ERCOT Approved May 3 '17 Jun 13 '17
NPRR833 ! Modify PTP Obligation Bid Clearing Change ERCOT Approved May 31 '17 Aug 8 '17
NPRR861 ! Clarification of ERCOT’s Authority to Protect Its Jurisdictional Status ERCOT Approved Dec 21 '17 Feb 20 '18
NPRR868 ! As-Built Hub and Load Zone Calculation ERCOT Approved Mar 1 '18 Apr 10 '18
VCMRR020 ! Delay the Fuel Adder Sunset Related to VCMRR014, Revise Fuel Adder Factor for Coal and Lignite Resources Reliant Energy... Approved Mar 22 '18 May 24 '18
VCMRR021 ! Related to NPRR847, Exceptional Fuel Cost Included in the Mitigated Offer Cap ERCOT Approved Apr 25 '18 Aug 7 '18
NPRR890 ! Correction to Calculation of Real-Time LMPs at Logical Resource Node for On-Line Combined Cycle Generation Resources ERCOT Approved Aug 15 '18 Oct 9 '18
NPRR901 ! Switchable Generation Resource Status Code ERCOT Approved Sep 26 '18 Dec 11 '18
RRGRR019 ! Related to NPRR901, Switchable Generation Resource Status Code ERCOT Approved Sep 26 '18 Dec 11 '18
NPRR915 ! Define Limited Duration Resource and Clarify Telemetered Resource Status Requirements Luminant Generation LLC Approved Dec 21 '18 Feb 12 '19
NPRR925 ! Increasing Minimum Quantity for PTP Obligation Bids ERCOT Approved Feb 27 '19 Apr 9 '19
NPRR930 ! Process, Pricing, and Cost Recovery for Delayed Resource Outages Citigroup Approved Mar 28 '19 Oct 8 '19
NPRR950 ! Switchable Generation Resources Providing Black Start Service ERCOT Approved May 30 '19 Oct 8 '19
NOGRR197 ! Align Responsive Reserve (RRS) Manual Deployment Requirements with Current Practice ERCOT Approved Oct 1 '19 Oct 23 '19
NPRR986 ! BESTF-2 Energy Storage Resource Energy Offer Curves, Pricing, Dispatch, and Mitigation ERCOT Approved Dec 5 '19 Feb 11 '20
NPRR988 ! Correction to Conditions for DAM Award Eligibility for PTP Obligations with Links to an Option ERCOT Approved Dec 11 '19 Feb 11 '20
RRGRR021 ! Dynamic Model Requirement for TSAT ERCOT Approved Sep 18 '19 Feb 26 '20
NPRR997 ! Natural Gas Pipeline Coordination Requirements for Resource Entities with Natural Gas Generation Resources ERCOT Approved Feb 7 '20 Apr 14 '20
NPRR998 ! ERS Deployment and Recall Messages ERCOT Approved Feb 20 '20 Apr 14 '20
NOGRR204 ! Related to NPRR989, BESTF-1 Energy Storage Resource Technical Requirements ERCOT Approved Dec 16 '19 Jun 9 '20
NPRR933 ! Reporting of Demand Response by Retail Electric Providers and Non-Opt-In Entities ERCOT Approved Apr 16 '19 Jun 9 '20
NPRR987 ! BESTF-3 Energy Storage Resource Contribution to Physical Responsive Capability and Real-Time On-Line Reserve Capacity Calculations ERCOT Approved Dec 9 '19 Jun 9 '20
NPRR989 ! BESTF-1 Energy Storage Resource Technical Requirements ERCOT Approved Dec 16 '19 Jun 9 '20
NPRR1006 ! Update Real-Time On-Line Reliability Deployment Price Adder Inputs to Match Actual Data TIEC Approved Mar 3 '20 Jun 9 '20
NPRR1018 ! Clarifications Regarding ERCOT Suspension or Termination of a QSE and Participation by a Virtual or Emergency QSE ERCOT Approved Apr 1 '20 Jun 9 '20
NPRR1019 ! Pricing and Settlement Changes for Switchable Generation Resources (SWGRs) Instructed to Switch to ERCOT ERCOT Approved Apr 1 '20 Jun 9 '20
NPRR1021 ! Adjustments to the Default Uplift Invoice Process Reliant Energy... Approved Apr 28 '20 Jun 9 '20
NPRR1022 ! Submission of Banking Information ERCOT Approved May 12 '20 Jun 9 '20
OBDRR017 ! Related to NPRR987, BESTF-3 Energy Storage Resource Contribution to Physical Responsive Capability and Real-Time On-Line Reserve Capacity Calculations ERCOT Approved Dec 9 '19 Jun 9 '20
SCR809 ! Changes to External Telemetry Validations in Resource Limit Calculator ERCOT Approved Jan 10 '20 Jun 9 '20
NPRR1015 ! Clarification of DAM implementation of NPRR863 Phase 2 ERCOT Approved Mar 25 '20 Aug 11 '20
NPRR1020 ! Allow Some Integrated Energy Storage Designs to Calculate Internal Loads Tesla Approved Apr 28 '20 Aug 11 '20
NPRR1030 ! Modify Allocator for CRR Auction Revenue Distribution ERCOT Approved Jul 1 '20 Aug 11 '20
NOGRR218 ! Removal of Annual Disturbance Monitoring Equipment Database Submission Requirement System Protection... Approved Aug 19 '20 Sep 23 '20
NPRR1038 ! BESTF-8 Limited Exemption from Reactive Power Requirements for Certain Energy Storage Resources ERCOT Approved Aug 6 '20 Oct 13 '20
SCR811 ! Addition of Intra-Hour PhotoVoltaic Power Forecast to GTBD Calculation ERCOT Approved Jul 29 '20 Oct 13 '20
NOGRR211 ! RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1007 ! RTC – NP 3: Management Activities for the ERCOT System ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1008 ! RTC – NP 4: Day-Ahead Operations ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1009 ! RTC – NP 5: Transmission Security Analysis and Reliability Unit Commitment ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1010 ! RTC – NP 6: Adjustment Period and Real-Time Operations ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1011 ! RTC – NP 8: Performance Monitoring ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1012 ! RTC – NP 9: Settlement and Billing ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1013 ! RTC – NP 1, 2, 16, and 25: Overview, Definitions and Acronyms, Registration and Qualification of Market Participants, and Market Suspension and Restart ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1014 ! BESTF-4 Energy Storage Resource Single Model ERCOT Approved Mar 25 '20 Dec 8 '20
NPRR1029 ! BESTF-6 DC-Coupled Resources ERCOT Approved Jun 26 '20 Dec 8 '20
NPRR1055 ! Market Notice and ERCOT Discretion re Late-Filed NOIE Eligibility Attestations for PTP Obligations with Links to an Option Bid Awards ERCOT Approved Nov 9 '20 Dec 8 '20
OBDRR020 ! RTC – Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints ERCOT Approved Mar 25 '20 Dec 8 '20
SMOGRR024 ! Implement NPRR1020 Tesla Approved Nov 24 '20 Feb 9 '21
NPRR1069 ! Align Ancillary Service Responsibility for ESRs with NPRR987 ERCOT Approved Mar 1 '21 Apr 13 '21
NPRR1074 ! “mp” Definition Revision Morgan Stanley... Approved Apr 6 '21 Jun 8 '21
NPRR1075 ! Update Telemetered HSL and/or MPC for ESRs in Real-Time to Meet Ancillary Service Resource Responsibility Key Capture Energy Approved Apr 28 '21 Jun 8 '21
NPRR1080 ! Limiting Ancillary Service Price to System-Wide Offer Cap ERCOT and IMM Approved Jun 3 '21 Jun 28 '21
NPRR1081 ! Revisions to Real-Time Reliability Deployment Price Adder to Consider Firm Load Shed ERCOT and IMM Approved Jun 3 '21 Jun 28 '21
NPRR1073 ! Market Entry/Participation by Principals of Counter-Parties with Financial Obligations Morgan Stanley... Approved Apr 5 '21 Aug 19 '21
NPRR1078 ! Clarification of Potential Uplift Reliant Energy... Approved May 20 '21 Aug 19 '21
NPRR1083 ! Modification of Uplift Allocation Rules to Address Role of Central Counter-Party Clearinghouses ICE NGX Canada Inc. Approved Jun 25 '21 Aug 19 '21
NPRR1086 ! Recovery, Charges, and Settlement for Operating Losses During an LCAP Effective Period ERCOT Approved Jul 14 '21 Aug 19 '21
SCR815 ! MarkeTrak Administrative Enhancements TDTMS Approved Jun 30 '21 Aug 19 '21
NOGRR232 ! Related to NPRR1093, Load Resource Participation in Non-Spinning Reserve ERCOT Approved Sep 1 '21 Oct 28 '21
NPRR1087 ! Prohibit Participation of Critical Loads as Load Resources or ERS Resources ERCOT Approved Jul 19 '21 Oct 28 '21
NPRR1090 ! ERS Winter Storm Uri Lessons Learned Changes and Other ERS Items ERCOT Approved Jul 28 '21 Oct 28 '21
NPRR1093 ! Load Resource Participation in Non-Spinning Reserve ERCOT Approved Sep 1 '21 Oct 28 '21
NOGRR236 ! Related to NPRR1105, Option to Deploy Distribution Voltage Reduction Measures Prior to Energy Emergency Alert (EEA) ERCOT Approved Nov 4 '21 Dec 16 '21
NOGRR237 ! Related to NPRR1106, Deployment of Emergency Response Service (ERS) Prior to Declaration of Energy Emergency Alert (EEA) ERCOT Approved Nov 4 '21 Dec 16 '21
NPRR1091 ! Changes to Address Market Impacts of Additional Non-Spin Procurement Shell Energy North America Approved Aug 2 '21 Dec 16 '21
NPRR1101 ! Create Non-Spin Deployment Groups made up of Generation Resources Providing Off-Line Non-Spinning Reserve and Load Resources that are Not Controllable Load Resources Providing Non-Spinning Reserve ERCOT Approved Oct 20 '21 Dec 16 '21
NPRR1103 ! Securitization – PURA Subchapter M Default Charges ERCOT Approved Nov 1 '21 Dec 16 '21
NPRR1104 ! As-Built Definition of Real Time Liability Extrapolated (RTLE) ERCOT Approved Nov 2 '21 Dec 16 '21
NPRR1105 ! Option to Deploy Distribution Voltage Reduction Measures Prior to Energy Emergency Alert (EEA) ERCOT Approved Nov 4 '21 Dec 16 '21
NPRR1106 ! Deployment of Emergency Response Service (ERS) Prior to Declaration of Energy Emergency Alert (EEA) ERCOT Approved Nov 4 '21 Dec 16 '21
NPRR1107 ! Addition of Weatherization Inspection Fees to the ERCOT Fee Schedule and Clarification of Generation Interconnection Request Fees ERCOT Approved Nov 9 '21 Dec 16 '21
NPRR1109 ! Process for Reinstating Decommissioned Generation Resources ERCOT Approved Nov 9 '21 Dec 16 '21
NPRR1097 ! Create Resource Forced Outage Report ERCOT Approved Sep 29 '21 Mar 31 '22
NPRR1111 ! Related to SCR819, Improving IRR Control to Manage GTC Stability Limits ERCOT Approved Dec 13 '21 Mar 31 '22
NPRR1113 ! Clarification of Regulation-Up Schedule for Controllable Load Resources in Ancillary Service Imbalance ERCOT Approved Dec 22 '21 Mar 31 '22
NPRR1114 ! Securitization – PURA Subchapter N Uplift Charges ERCOT Approved Dec 29 '21 Mar 31 '22
NPRR1120 ! Create Firm Fuel Supply Service ERCOT Approved Jan 31 '22 Mar 31 '22
SCR819 ! Improving IRR Control to Manage GTC Stability Limits ERCOT Approved Dec 13 '21 Mar 31 '22
NOGRR239 ! WAN Data Protection Responsibilities ERCOT Approved Jan 19 '22 May 12 '22
NPRR1108 ! ERCOT Shall Approve or Deny All Resource Planned Outage Requests ERCOT Approved Nov 9 '21 May 12 '22
NPRR1122 ! Clarifications for PURA Subchapter M Securitization Default Charges ERCOT Approved Feb 24 '22 May 12 '22
NPRR1123 ! Clarifications for PURA Subchapter N Securitization Uplift Charges ERCOT Approved Feb 24 '22 May 12 '22
NPRR1124 ! Recovering Actual Fuel Costs through RUC Guarantee ERCOT Approved Mar 9 '22 May 12 '22
NPRR1125 ! Use of Financial Security for Securitization Default Charge and Securitization Uplift Charge Invoices and Escrow Deposit Requests ERCOT Approved Mar 11 '22 May 12 '22
NPRR1100 ! Allow Generation Resources and Energy Storage Resources to Serve Customer Load When the Customer and the Resource are Disconnected from the ERCOT System Tesla Approved Oct 6 '21 Jul 14 '22
NPRR1129 ! Posting ESI IDs of Transmission-Voltage Customer Opt-Outs ERCOT Approved Apr 12 '22 Jul 14 '22
NPRR1130 ! Weatherization Inspection Fees Sunset Date Extension ERCOT Approved Apr 22 '22 Jul 14 '22
NPRR1142 ! ERS Changes to Reflect Updated PUCT Rule Changes re SUBST. R. 25.507 ERCOT Approved Jul 14 '22 Aug 25 '22
NPRR1112 ! Elimination of Unsecured Credit Limits ERCOT Approved Dec 22 '21 Sep 15 '22
SCR823 ! ERCOT Mass System “County Name” File Updates for Texas SET V5.0 Implementation Texas SET Working Group Approved Sep 13 '22 Nov 3 '22
RMGRR170 ! Inadvertent Gain Process Updates TDTMS Approved Sep 27 '22 Dec 15 '22
NOGRR243 ! Implementation of Seasonal Load Shed Tables Joint TOs Approved Sep 29 '22 Jan 26 '23
NPRR1138 ! Communication of Capability and Status of Online IRRs at 0 MW Output ERCOT Approved May 25 '22 Jan 26 '23
NPRR1152 ! Remove Requirements to Submit Emergency Operations Plans, Weatherization Plans, and Declarations of Summer/Winter Weather Preparedness ERCOT Approved Oct 20 '22 Jan 26 '23
NPRR1154 ! Include Alternate Resource in the Availability Plan for the Firm Fuel Supply Service LCRA Approved Nov 3 '22 Jan 26 '23
LPGRR071 ! Reduced Timing Requirement for Submittal of Usage and Demand Values by Opt-In Entities ERCOT Approved Feb 22 '23 Apr 27 '23
COPMGRR049 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
LPGRR072 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
NOGRR248 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
PGRR104 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
RMGRR173 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
RRGRR034 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
SMOGRR026 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
VCMRR036 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process ERCOT Approved Feb 22 '23 May 11 '23
NOGRR253 ! Related to NPRR1178, Expectations for Resources Providing ERCOT Contingency Reserve Service ERCOT Approved May 3 '23 Jun 29 '23
NPRR1169 ! Expansion of Generation Resources Qualified to Provide Firm Fuel Supply Service in Phase 2 of the Service ERCOT Approved Mar 29 '23 Jun 29 '23
NPRR1177 ! Enhance Exceptional Fuel Cost Process Constellation Approved Apr 27 '23 Jun 29 '23
NPRR1178 ! Expectations for Resources Providing ERCOT Contingency Reserve Service ERCOT Approved May 3 '23 Jun 29 '23
NPRR1204 ! Considerations of State of Charge with Real-Time Co-Optimization Implementation ERCOT Approved Oct 10 '23 Feb 1 '24
RMGRR176 ! Addition of Market Processes Specific to LP&L LRITF Approved Oct 23 '23 Feb 1 '24
NPRR1179 ! Fuel Purchase Requirements for Resources Submitting RUC Fuel Costs ERCOT Approved May 4 '23 Apr 11 '24
NPRR1186 ! Improvements Prior to the RTC+B Project for Better ESR State of Charge Awareness, Accounting, and Monitoring ERCOT Approved Jun 22 '23 Apr 11 '24
NPRR1199 ! Implementation of Lone Star Infrastructure Protection Act (LSIPA) Requirements ERCOT Approved Sep 6 '23 Apr 11 '24
RMGRR179 ! TDSP Temporary Emergency Electric Energy Facility (TEEEF) Deployment Transactional Processing Texas SET Approved Dec 22 '23 Apr 11 '24
NPRR1228 ! Continued One-Winter Procurements for Firm Fuel Supply Service (FFSS) ERCOT Approved May 2 '24 Jul 25 '24
NOGRR245 ! Inverter-Based Resource (IBR) Ride-Through Requirements ERCOT Approved Jan 11 '23 Sep 26 '24
NPRR1219 ! Methodology Revisions and New Definitions for the Report on Capacity, Demand and Reserves in the ERCOT Region (CDR) ERCOT Approved Mar 5 '24 Sep 26 '24
NPRR1230 ! Methodology for Setting Transmission Shadow Price Caps for an IROL in SCED ERCOT Approved May 7 '24 Sep 26 '24
NPRR1247 ! Incorporation of Congestion Cost Savings Test in Economic Evaluation of Transmission Projects ERCOT Approved Aug 9 '24 Jan 16 '25
NOGRR274 ! Conform Nodal Operating Guide to Revisions Implemented for NPRR1217, Remove Verbal Dispatch Instruction (VDI) Requirement for Deployment and Recall of Load Resources and Emergency Response Service (ERS) Resources ERCOT Approved Feb 26 '25 May 15 '25
NPRR1268 ! RTC – Modification of Ancillary Service Demand Curves IMM Approved Jan 28 '25 May 15 '25
NPRR1269 ! RTC+B Three Parameters Policy Issues ERCOT Approved Jan 28 '25 May 15 '25
NPRR1270 ! Additional Revisions Required for Implementation of RTC ERCOT Approved Jan 28 '25 May 15 '25
NPRR1273 ! Appropriate Accounting for ESRs in PRC Calculation ERCOT Approved Feb 12 '25 May 15 '25
NOGRR277 ! Related to NPRR1282, Ancillary Service Duration under Real-Time Co-Optimization ERCOT Approved Apr 29 '25 Jul 31 '25
NPRR1282 ! Ancillary Service Duration under Real-Time Co-Optimization ERCOT Approved Apr 29 '25 Jul 31 '25
PGRR125 ! Update of LSIPA Compliance Attestation ERCOT Approved Mar 25 '25 Jul 31 '25
NOGRR272 ! Advanced Grid Support Requirements for Inverter-Based ESRs ERCOT Approved Oct 31 '24 Nov 6 '25
NOGRR278 ! Related to NPRR1290, Gap Resolutions and Clarifications for the Implementation of RTC+B ERCOT Approved Jul 16 '25 Nov 6 '25
PGRR121 ! Related to NOGRR272, Advanced Grid Support Requirements for Inverter-Based ESRs ERCOT Approved Oct 31 '24 Nov 6 '25
PGRR131 ! Requirements for Interconnection Cost Reporting for Transmission-Connected Generators ERCOT Approved Aug 26 '25 Jan 15 '26
NPRR1311 ! Correction to Real-Time Reliability Deployment Price Adders for Ancillary Services under Load Shed for RTC+B ERCOT Approved Nov 25 '25 Mar 26 '26
NPRR1323 ! Correction to Inadvertent Removal of Real-Time MCPC Capping for NPRR1290 Phase 2 ERCOT Approved Feb 24 '26 May 29 '26
NPRR1325 ! Related to PGRR145, Batch Zero Process for Large Load Interconnections ERCOT Approved Mar 4 '26 Jun 18 '26
PGRR145 ! Batch Zero Process for Large Load Interconnections ERCOT Approved Mar 4 '26 Jun 18 '26
NOGRR282 ! Board Priority - Large Computational Load Ride-Through Requirements ERCOT Approved Nov 14 '25 Jul 9 '26
NOGRR283 ! Board Priority - Related to NPRR1309, Dispatchable Reliability Reserve Service Ancillary Service ERCOT Approved Nov 20 '25 Jul 9 '26
NPRR1308 ! Board Priority - Related to NOGRR282, Large Computational Load Ride-Through Requirements ERCOT Approved Nov 14 '25 Jul 9 '26
NPRR1309 ! Board Priority - Dispatchable Reliability Reserve Service Ancillary Service ERCOT Approved Nov 20 '25 Jul 9 '26
NPRR1315 ! Changes to Process of Evaluating the Potential Needs for Additional Capacity and Mitigated Offer Cap ERCOT Approved Dec 19 '25 Jul 9 '26
NPRR1330 ! Mitigated Offer Caps for RMR Units ERCOT Approved Apr 21 '26 Jul 9 '26
PGRR133 ! Clarifying Legacy Generation Breaker Control for PGRR115 Implementation Vistra Approved Oct 30 '25 Jul 9 '26