ERCOT·WATCH Search ercot.com  ⌕
PGRR #145 · Revision Request

PGRR145  Batch Zero Process for Large Load Interconnections

Approved Urgent sponsor ERCOT posted 2026-03-04 ercot.com
  1. ROS May 7 '26
  2. TAC May 19 '26
  3. BOARD Jun 2 '26
  4. PUCT Jun 18 '26
ReasonStrategic Plan Objective 1
Created2026-04-02
Approved2026-06-18
Sections Affected
2.12.23.1.2.13.1.23.1.35.3.56.6.16.6.26.6.2.1 (new)6.6.399.19.2.19.2.1.1 (new)9.2.1.2 (new)9.2.1.3 (new)9.2.1.4 (new)9.2.29.2.2.1 (new)9.2.2.2 (new)9.2.39.2.49.2.59.39.3.19.3.29.3.2.1 (new)9.3.2.2 (new)9.3.3 (delete)9.3.4 (delete)9.3.4.1 (delete)9.3.4.2 (delete)9.3.4.3 (delete)9.49.4.1 (new)9.4.2 (new)9.59.5.1(delete)9.5.2 (delete)9.5.3 (new)9.5.4 (new)9.69.6.1 (new)9.6.2 (new)9.7 (new)9.8 (new)9.8.1 (new)9.8.2 (new)9.8.3 (new)9.8.4 (new)9.8.4.1 (new)9.8.4.2 (new)9.8.4.3 (new)9.9 (new)9.10 (new)9.10.1 (new)9.10.2 (new)
Summary
This Planning Guide Revision Request (PGRR) creates a transitional Batch Zero for ERCOT to study on a system-wide basis the reliability impacts of Large Loads that meet certain study maturity and commitment criteria.
Timeline