NOGRR #245 · Revision Request

NOGRR245  Inverter-Based Resource (IBR) Ride-Through Requirements

Approved Urgent sponsor ERCOT posted 2023-01-11 ercot.com
ReasonStrategic Plan Objective 1
Created2023-02-08
Approved2024-09-26
Sections Affected
2.6.22.6.2.12.6.2.1 (new) 2.6.2.1.1 (new)2.6.4 (new)2.92.9.12.9.1.1 (new)2.9.1.2 (new)2.11 (new)2.11.1(new)2.11.2 (new) 2.12 (new)2.12.1 (new)2.12.1.1 (new)2.12.1.2 (new) 2.12.1.3 (new)and 2.13 (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) replaces the current voltage ride-through requirements for Intermittent Renewable Resources (IRRs) with voltage ride-through requirements for Inverter-Based Resources (IBRs) and Type 1 and Type 2 Wind-powered Generation Resources (WGRs) and provides new frequency ride-through requirements for IBRs and Type 1 and 2 WGRs consistent with or beyond requirements identified in the new 2800-2022 - Institute of Electrical and Electronics Engineers (IEEE) Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems (“IEEE 2800-2022 standard”).
Action Log 10 milestones
Amendments
DateBodyMotionResult
Sep 14 '23ROS to grant NOGRR245 Urgent status; to recommend approval of NOGRR245 as amended by the 9/13/23 NextEra comments as revised by ROS; and to forward to TAC NOGRR245 and the 1/11/23 Impact AnalysisPassed
Mar 27 '24TAC to recommend approval of NOGRR245 as recommended by ROS in the 9/14/23 ROS Report as amended by the 3/22/24 Joint Commenters 2 comments as revised by TACPassed
Jun 7 '24TAC to recommend approval of NOGRR245 as recommended by TAC in the 3/27/24 TAC Report as amended by the 6/5/24 ERCOT comments as revised by TACPassed
Aug 20 '24BOARD to (1) recommended approval of NOGRR245 as recommended by TAC in the 6/7/24 TAC Report as amended by the 8/16/24 ERCOT comments with a recommended priority of 2025 and rank of 3515, and (2) designate a subsequent NOGRR as a Board Priority Revision Request to address the remaining details of the exemption process and to have the NOGRR at the ERCOT Board’s February 2025 meetings for consideration, with instruction to TAC leadership to provide detailed reports on this subsequent NOGRR at the ERCOT Board’s October and December 2024 meetingsPassed
Ballots
DateBodyResultYesNoAbstain
Jun 7 '24 TAC Motion Passes 18 1 10 xls
May 22 '24 TAC Motion Passes 26 0 0 xls
Mar 27 '24 TAC Motion Fails 16 11 3 xls
Mar 27 '24 TAC Motion Fails 12 15 3 xls
Mar 27 '24 TAC Motion Fails 15 8 6 xls
Mar 27 '24 TAC Motion Passes 18 8 3 xls
Sep 26 '23 TAC Motion Passes 30 0 0 xls
Sep 14 '23 ROS 14 11 2 xls
Feb 8 '23 ROS Motion Carries 7.5 0 0 xls
Documents 91
NameTypePostedClassification
245NOGRR-01 Inverter-Based Resource (IBR) Ride-Through Requirements 011123 docx Jan 11 '23 Revision Request
245NOGRR-02 Impact Analysis 011123 docx Jan 11 '23 Staff Report
245NOGRR-03 ROS Ballot 020823 xls Feb 10 '23 Revision Request Ballot
245NOGRR-04 ROS Report 020823 docx Feb 10 '23 Committee Report
245NOGRR-05 Brazos Electric Comments 021623 doc Feb 16 '23 Revision Request Comments
245NOGRR-06 GE Renewable Energy Comments 021723 docx Feb 17 '23 Revision Request Comments
245NOGRR-07 Oncor Comments 030723 docx Mar 7 '23 Revision Request Comments
245NOGRR-08 Advanced Power Alliance Comments 032023 docx Mar 20 '23 Revision Request Comments
245NOGRR-09 ERCOT Comments 040523 docx Apr 5 '23 Revision Request Comments
245NOGRR-10 RWE Comments 042623 doc Apr 26 '23 Revision Request Comments
245NOGRR-11 Invenergy Comments 050123 docx May 1 '23 Revision Request Comments
245NOGRR-12 Southern Power Comments 050123 docx May 1 '23 Revision Request Comments
245NOGRR-13 EDFR Comments 050223 doc May 2 '23 Revision Request Comments
245NOGRR-14 GE Renewable Energy Comments 050323 doc May 3 '23 Revision Request Comments
245NOGRR-15 Advanced Power Alliance Comments 050323 docx May 3 '23 Revision Request Comments
245NOGRR-16 Clearway Renew Comments 050323 docx May 3 '23 Revision Request Comments
245NOGRR-17 Pattern Energy Comments 050323 doc May 3 '23 Revision Request Comments
245NOGRR-18 TSPA Comments 051723 docx May 17 '23 Revision Request Comments
245NOGRR-19 Siemens Gamesa Renewable Energy Comments 060623 doc Jun 6 '23 Revision Request Comments
245NOGRR-21 AES CE Comments 061623 docx Jun 16 '23 Revision Request Comments
245NOGRR-22 ERCOT Comments 062223 docx Jun 22 '23 Revision Request Comments
245NOGRR-23 Vestas Comments 062223 doc Jun 22 '23 Revision Request Comments
245NOGRR-24 Engie Comments 072623 doc Jul 26 '23 Revision Request Comments
245NOGRR-25 NextEra Comments 072823 docx Jul 28 '23 Revision Request Comments
245NOGRR-26 Advanced Power Alliance Comments 072823 docx Jul 28 '23 Revision Request Comments
245NOGRR-27 Sierra Club Comments 073123 doc Jul 31 '23 Revision Request Comments
245NOGRR-28 TAEBA Comments 073123 docx Jul 31 '23 Revision Request Comments
245NOGRR-29 GE Vernova Comments 073123 doc Jul 31 '23 Revision Request Comments
245NOGRR-30 Invenergy Comments 073123 docx Jul 31 '23 Revision Request Comments
245NOGRR-31 TSPA Comments 080223 docx Aug 2 '23 Revision Request Comments
245NOGRR-32 RWE Comments 080223 doc Aug 2 '23 Revision Request Comments
245NOGRR-33 Orsted Comments 080323 docx Aug 3 '23 Revision Request Comments
245NOGRR-34 Advanced Power Alliance Comments 081123 docx Aug 11 '23 Revision Request Comments
245NOGRR-35 ERCOT Comments 081823 docx Aug 18 '23 Revision Request Comments
245NOGRR-36 Invenergy Comments 090423 docx Sep 4 '23 Revision Request Comments
245NOGRR-37 Southern Power Comments 090523 docx Sep 5 '23 Revision Request Comments
245NOGRR-38 GE Vernova Comments 090523 docx Sep 5 '23 Revision Request Comments
245NOGRR-39 NextEra Comments 090523 docx Sep 5 '23 Revision Request Comments
245NOGRR-40 ERCOT Comments 090623 docx Sep 6 '23 Revision Request Comments
245NOGRR-41 Sierra Club Comments 091123 doc Sep 11 '23 Revision Request Comments
245NOGRR-42 NextEra Comments 091323 docx Sep 13 '23 Revision Request Comments
245NOGRR-43 RWE Comments 091323 doc Sep 13 '23 Revision Request Comments
245NOGRR-44 NextEra Comments 091323 doc Sep 13 '23 Revision Request Comments
245NOGRR-45 ROS Ballot 091423 xls Sep 19 '23 Revision Request Ballot
245NOGRR-46 ROS Report 091423 docx Sep 19 '23 Committee Report
245NOGRR-47 Siemens Gamesa Renewable Energy Comments 092223 docx Sep 22 '23 Revision Request Comments
245NOGRR-48 ERCOT Comments 092423 docx Sep 24 '23 Revision Request Comments
245NOGRR-49 Avangrid Renewables Comments 092523 docx Sep 25 '23 Revision Request Comments
245NOGRR-50 TAC Ballot 092623 xls Sep 28 '23 Revision Request Ballot
245NOGRR-51 TAC Report 092623 docx Sep 28 '23 Committee Report
245NOGRR-52 ERCOT Comments 092923 docx Sep 29 '23 Revision Request Comments
245NOGRR-53 Tesla Comments 101623 doc Oct 16 '23 Revision Request Comments
245NOGRR-54 ERCOT Comments 102323 docx Oct 23 '23 Revision Request Comments
245NOGRR-55 Advanced Power Alliance Comments 102323 docx Oct 23 '23 Revision Request Comments
245NOGRR-56 Siemens Gamesa Renewable Energy Comments 103023 docx Oct 30 '23 Revision Request Comments
245NOGRR-57 Vestas Comments 110123 doc Nov 1 '23 Revision Request Comments
245NOGRR-58 GE Vernova Comments 110723 doc Nov 7 '23 Revision Request Comments
245NOGRR-59 Revised Impact Analysis 120223 docx Dec 2 '23 Staff Report
245NOGRR-60 ERCOT Comments 120223 docx Dec 2 '23 Revision Request Comments
245NOGRR-61 ERCOT Comments 010824 docx Jan 8 '24 Revision Request Comments
245NOGRR-62 Texas RE Comments 011124 docx Jan 11 '24 Revision Request Comments
245NOGRR-63 GE Vernova Comments 011924 docx Jan 19 '24 Revision Request Comments
245NOGRR-64 Advanced Power Alliance Comments 012324 docx Jan 23 '24 Revision Request Comments
245NOGRR-65 Joint Commenters Comments 012324 docx Jan 23 '24 Revision Request Comments
245NOGRR-66 Avangrid Renewables Comments 012324 docx Jan 23 '24 Revision Request Comments
245NOGRR-67 ERCOT Comments 021224 docx Feb 12 '24 Revision Request Comments
245NOGRR-68 ERCOT Comments 032024 docx Mar 20 '24 Revision Request Comments
245NOGRR-69 Joint Commenters 2 Comments 032224 docx Mar 22 '24 Revision Request Comments
245NOGRR-70 ERCOT Comments 032624 docx Mar 26 '24 Revision Request Comments
245NOGRR-71 TAC Ballot 032724 xls Apr 1 '24 Revision Request Ballot
245NOGRR-72 TAC Report 032724 docx Apr 1 '24 Committee Report
245NOGRR-73 Revised Impact Analysis 041524 docx Apr 15 '24 Staff Report
245NOGRR-75 Elevate Energy Consulting Comments 041524 docx Apr 15 '24 Revision Request Comments
245NOGRR-76 ERCOT Comments 041524 docx Apr 15 '24 Revision Request Comments
245NOGRR-77 Board Report 042324 docx Apr 24 '24 Committee Report
245NOGRR-78 TAC Ballot 052224 xls May 23 '24 Revision Request Ballot
245NOGRR-79 TAC Report 052224 docx May 23 '24 Committee Report
245NOGRR-80 ERCOT Comments 060524 docx Jun 5 '24 Revision Request Comments
245NOGRR-81 Luminant Comments 060624 docx Jun 6 '24 Revision Request Comments
245NOGRR-82 Joint Commenters 2 Comments 060624 docx Jun 6 '24 Revision Request Comments
245NOGRR-83 TAC Ballot 060724 xls Jun 10 '24 Revision Request Ballot
245NOGRR-84 TAC Report 060724 docx Jun 10 '24 Committee Report
245NOGRR-85 Revised Impact Analysis 061024 docx Jun 10 '24 Staff Report
245NOGRR-105 ERCOT Comments 061624 docx Jun 16 '24 Revision Request Comments
245NOGRR-106 Board Report 061824 docx Jun 20 '24 Committee Report
245NOGRR-107 ERCOT Comments 081224 docx Aug 12 '24 Revision Request Comments
245NOGRR-108 ERCOT Comments 081624 docx Aug 16 '24 Revision Request Comments
245NOGRR-109 Joint Commenters 2 Comments 081624 docx Aug 16 '24 Revision Request Comments
245NOGRR-110 Board Report 082024 docx Aug 22 '24 Committee Report
245NOGRR-111 Revised Impact Analysis 082224 docx Aug 22 '24 Staff Report
245NOGRR-112 PUCT Report 092624 docx Sep 30 '24 Committee Report
Meetings That Took It Up 71
DateMeetingCommitteeStatus
Feb 25 '26 TAC Meeting TAC Concluded
Feb 23 '26 RIWG Meeting - Webex Only RIWG Concluded
Oct 29 '25 RIWG Meeting - Webex Only RIWG Concluded
Oct 23 '25 TWG Meeting - Webex Only TWG Concluded
Oct 10 '25 IBRWG Meeting - Webex Only IBRWG Concluded
Oct 2 '25 ROS Meeting ROS Concluded
Aug 28 '25 TWG Meeting - Webex Only TWG Concluded
Aug 20 '25 RIWG Meeting - Webex Only RIWG Concluded
Aug 8 '25 NOGRR245 Workshop III Concluded
Jul 30 '25 TAC Meeting - Webex Only TAC Concluded
Apr 18 '25 IBRWG Meeting - Webex Only IBRWG Concluded
Apr 16 '25 RIWG Meeting - Webex Only RIWG Concluded
Feb 27 '25 TAC Meeting TAC Concluded
Feb 11 '25 RIWG Meeting - Webex Only RIWG Concluded
Feb 10 '25 NOGRR245 Workshop I Concluded
Oct 30 '24 TAC Meeting - Webex Only TAC Concluded
Oct 24 '24 RIWG Meeting - Webex Only RIWG Concluded
Aug 28 '24 TAC Meeting TAC Concluded
Aug 20 '24 Board of Directors Meeting BOARD Concluded
Aug 19 '24 Reliability and Markets Committee Meeting RELIABILITYMARKETS Concluded
Aug 8 '24 NOGRR245 - Review of Current Status (Webex Only) Concluded
Aug 1 '24 ROS Meeting - Webex Only ROS Concluded
Jul 31 '24 TAC Meeting TAC Concluded
Jun 20 '24 DWG Meeting - Webex Only DWG Concluded
Jun 18 '24 Board of Directors Meeting BOARD Concluded
Jun 17 '24 Reliability and Markets Committee Meeting RELIABILITYMARKETS Concluded
Jun 14 '24 IBRWG Meeting - Webex Only IBRWG Concluded
Jun 7 '24 Special TAC Meeting - Webex Only TAC Concluded
May 31 '24 Special TAC Meeting - Webex Only TAC Concluded
May 22 '24 TAC Meeting TAC Concluded
May 10 '24 TAC Workshop for NOGRR245 Concluded
Apr 24 '24 DWG Meeting - Webex Only DWG Concluded
Apr 23 '24 Board of Directors Meeting BOARD Concluded
Apr 22 '24 Reliability and Markets Committee Meeting RELIABILITYMARKETS Concluded
Apr 12 '24 IBRWG Meeting - Webex Only IBRWG Concluded
Mar 27 '24 TAC Meeting TAC Concluded
Feb 22 '24 DWG Meeting - Webex Only DWG Concluded
Feb 14 '24 TAC Meeting TAC Concluded
Jan 24 '24 TAC Meeting TAC Concluded
Jan 12 '24 IBRWG Meeting - Webex Only IBRWG Concluded
Dec 12 '23 DWG Meeting - Webex Only DWG Concluded
Dec 4 '23 TAC Meeting TAC Concluded
Nov 10 '23 IBRWG Meeting - Webex Only IBRWG Concluded
Oct 24 '23 TAC Meeting TAC Concluded
Oct 13 '23 IBRWG Meeting - Webex Only IBRWG Concluded
Sep 26 '23 TAC Meeting TAC Concluded
Sep 14 '23 Special ROS Meeting - Webex Only ROS Concluded
Sep 8 '23 IBRWG Meeting - Webex Only IBRWG Concluded
Sep 7 '23 ROS Meeting ROS Concluded
Aug 17 '23 OWG Meeting - Webex Only OWG Concluded
Aug 11 '23 IBRWG Meeting - Webex Only IBRWG Concluded
Aug 3 '23 ROS Meeting ROS Concluded
Jul 20 '23 OWG Meeting - Webex Only OWG Concluded
Jul 7 '23 IBRTF Meeting - Webex Only IBRTF Concluded
Jul 6 '23 ROS Meeting - Webex Only ROS Concluded
Jun 22 '23 OWG Meeting - Webex Only OWG Concluded
Jun 9 '23 IBRTF Meeting - Webex Only IBRTF Concluded
Jun 8 '23 ROS Meeting ROS Concluded
May 18 '23 OWG Meeting - Webex Only OWG Concluded
May 12 '23 IBRTF Meeting - Webex Only IBRTF Concluded
May 4 '23 ROS Meeting - Webex Only ROS Concluded
Apr 20 '23 OWG Meeting - Webex Only OWG Concluded
Apr 14 '23 IBRTF Meeting - Webex Only IBRTF Concluded
Apr 6 '23 ROS Meeting ROS Concluded
Mar 16 '23 OWG Meeting - Webex Only OWG Concluded
Mar 2 '23 ROS Meeting ROS Concluded
Feb 16 '23 OWG Meeting - Webex Only OWG Concluded
Feb 10 '23 IBRTF Meeting - Webex Only IBRTF Concluded
Feb 8 '23 ROS Meeting - Webex Only ROS Concluded
Jan 20 '23 IBRTF Meeting - Webex Only IBRTF Concluded
Jan 19 '23 OWG Meeting - Webex Only OWG Concluded