SCR #811 · Revision Request

SCR811  Addition of Intra-Hour PhotoVoltaic Power Forecast to GTBD Calculation

Approved Urgent sponsor ERCOT posted 2020-07-29 ercot.com
ReasonMarket efficiencies or enhancements
Created2020-08-13
Approved2020-10-13
Sections Affected
6.5.7.3
Summary
ERCOT is in the process of adding an Intra-Hour PhotoVoltaic Power Forecast (IHPPF). This System Change Request (SCR) updates the formula used by the Resource Limit Calculator to calculate the Generation To Be Dispatched (GTBD) value to include a predicted five-minute solar ramp (PSRR) component. A five-minute solar ramp rate will be calculated from the IHPPF and the Short-Term PhotoVoltaic Power Forecast (STPPF). A manual toggle will be available to select one of the methods as primary source for setting the PSRR value to be used. This PSRR times five and a configurable factor will be used in GTBD to capture the forecasted five-minute solar ramp. This addition would help Security-Constrained Economic Dispatch (SCED) take into account the potential five-minute solar ramp in its five-minute Base Points and would take the burden off of Regulation Service to cover the five-minute gain or loss of generation resulting from variations in solar irradiance and instead dispatch the energy economically. This change will also aid reducing frequency recovery duration following events that occur during times with significant solar up and down ramps. Although there will be inherent forecast error in the PhotoVoltaic forecast, this change will give a better indication to SCED via GTBD of the level of solar generation that will be available in the next five minutes, as compared to the current assumption that the solar generation will persist at the same level as at the beginning of the five-minute interval. ERCOT will analyze the five-minute out forecast performance and accuracy of projected solar generation ramp direction before the intra-hour solar ramp forecast component is activated in the GTBD formula.
Action Log 4 milestones
Ballots
DateBodyResultYesNoAbstain
Sep 23 '20 TAC Motion Passes 27 0 1 xls
Sep 10 '20 PRS Motion Carries 7 0 0 xls
Sep 3 '20 ROS Motion Carries 7.5 0 0 xls
Sep 2 '20 WMS Motion Carries 7.5 0 1 xls
Documents 14
NameTypePostedClassification
811SCR-01 Addition of Intra Hour PhotoVoltaic Power Forecast to GTBD Calculation 072920 doc Jul 29 '20 Revision Request
811SCR-02 Impact Analysis 072920 docx Jul 29 '20 Staff Report
811SCR-03 PRS Ballot 081320 xls Aug 18 '20 Revision Request Ballot
811SCR-04 PRS Report 081320 doc Aug 18 '20 Committee Report
811SCR-05 ERCOT Comments 083120 doc Aug 31 '20 Revision Request Comments
811SCR-06 WMS Ballot 090220 xls Sep 4 '20 Revision Request Ballot
811SCR-07 WMS Comments 090420 doc Sep 4 '20 Revision Request Comments
811SCR-08 ROS Ballot 090320 xls Sep 9 '20 Revision Request Ballot
811SCR-09 ROS Comments 090920 doc Sep 9 '20 Revision Request Comments
811SCR-10 PRS Ballot 091020 xls Sep 15 '20 Revision Request Ballot
811SCR-11 PRS Report 091020 doc Sep 15 '20 Committee Report
811SCR-12 TAC Ballot 092320 xls Sep 27 '20 Revision Request Ballot
811SCR-13 TAC Report 092320 doc Sep 27 '20 Committee Report
811SCR-14 Board Report 101320 doc Oct 16 '20 Committee Report
Meetings That Took It Up 8
DateMeetingCommitteeStatus
May 14 '21 PDCWG Meeting by Webex Only PDCWG Concluded
Oct 13 '20 Urgent Board of Directors Meeting – Teleconference Available by Webcast BOARD Concluded
Sep 23 '20 TAC Meeting by Webex Only TAC Concluded
Sep 10 '20 PRS Meeting PRS Concluded
Sep 3 '20 ROS Meeting ROS Concluded
Sep 2 '20 WMS Meeting WMS Concluded
Aug 17 '20 WMWG Meeting by Webex Only WMWG Concluded
Aug 13 '20 PRS Meeting PRS Concluded