NOGRR #62 · Revision Request

NOGRR062  Require Voltage Ride-Through Capability for IRRs

Approved Urgent sponsor ERCOT posted 2011-03-03 ercot.com
ReasonThis NOGRR is being proposed for the following reasons: Due to the expected IRRs to be placed in service over the next few years, lack of VRT capability could pose ERCOT reliability issues in the event of voltage excursions. Concern of sudden voltage changes causing tripping of units without VRT capability. Additionally, although the VRT study indicated there was no need to retrofit existing Wind-powered Generation Resources to add VRT capability, the concern remains if more units without VRT capability are placed in service, especially in west Texas where many existing WGRs do not have VRT capability.
Created2011-03-10
Sections Affected
2.9.1
Summary
This Nodal Operating Guide Revision Request (NOGRR) proposes a requirement for Voltage Ride-Through (VRT) capability for new IRRs
Action Log 2 milestones
Documents 5
NameTypePostedClassification
062NOGRR-01 Require Voltage Ride-Through Capability for IRRs 030 doc Mar 3 '11 Revision Request
062NOGRR-02 Impact Analysis 030311 doc Mar 3 '11 Committee Report
062NOGRR-03 Urgency Vote 030811 xls Mar 8 '11 Revision Request Ballot
062NOGRR-04 ROS Report 031011 doc Mar 11 '11 Committee Report
062NOGRR-05 TAC Report 040711 doc Apr 12 '11 Committee Report
Meetings That Took It Up 2
DateMeetingCommitteeStatus
Apr 7 '11 TAC Meeting TAC Concluded
Mar 10 '11 ROS Meeting ROS Concluded